ML20134K795

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-341/96-11 on 961007-11.No Violations Noted
ML20134K795
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/14/1996
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gipson D
DETROIT EDISON CO.
Shared Package
ML20134K799 List:
References
NUDOCS 9611200032
Download: ML20134K795 (2)


See also: IR 05000341/1996011

Text

a.

y/

..

'

November 14, 1996

i

Mr. D. R. Gipson s

Senior Vice President <

Nuclear Generation I

The Detroit Edison Company N

6400 North Dixie Highway N

Newport, MI 48166

SUBJECT: NRC RADIATION PROTECTION INSPECTION REPORT NO. 50-341/96011

(DRS)

Dear Mr. Gipson: ,

i

On October 11,1996, the NRC completed an inspection at your Enrico Fermi, Unit 2 i

facility. The enclosed report presents the results of that inspection.

Areas examined during the inspection are identified in the report. Within these areas, the  ;

inspection consisted of a selective examination of procedures and representative records, '

observations of activities, and interviews with personnel.

Overall, the implementation of radiological controls for the RF05 was effective in

maintaining a reasonable collective dose for the work accomp?ished.- However, the pre-

planning for the control rod position indicating probe modification task significantly

underestimated the work scope and the dose expenditure for the scaffolding and cable

installation phases. In addition, the NRC identified evidence of eating and drinking in the

Radiologically Restricted Area. This independent observation was a confirmation of two

occurrences that your staff had previously identified. No violations of NRC requirements

or open items were identified.

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosure will be placed in the NRC Public Document Room (PDR).

i

200013

9611200032 961114

PDR ADOCK 05000341

0 PDR

- - .- , -

_..

..

I

i

-

D. R. Gipson -2- November 14, 1996

We will gladly discuss any questions you have concerning this irispection.

I

Sincerely, j

Original Signed by Bre'1t Clayton (for)

Geoffrey E. Grant, Director

Division of Reactor Safety

Docket No. 50-341

License No. NPF-43

Enclosure: Inspection Report No.

50-341/96011(DRS)

cc w/ encl: N. Peterson, Supervisor

of Compliance

P. A. Marquardt, Corporate

Legal Department

James R. Padgett, Michigan Public

Service Commission

Michigan Department of

Public Health

Monroe County, Emergency

Management Division

Distribution:

Docket File w/enci DRS w/ encl A. B. Beach, Rlli w/enci

PUBLIC IE-01 w/enci Rlli PRR w/ encl Enf. Coordinator, Rill w/enci

OC/LFDCB w/enci SRI, Fermi w/enci CAA1 w/enci (E-mail)

DRP w/enct LPM, NRR w/enci W. L. Axelson, Rlli w/enci

l

l

DOCUMENT NAME: G:DRS\FER96011.DRS

To receive a copy of this document, indicate in the box: *C" = Co,2y without attachment / enclosure "E" = Copy with attachment / enclosure )

  • N* = No copy i

&FI Rlli l t, Rlli , l# Rlli eI f) Rlli /k., l&

TME FGlinski:]p(&y TKozak 1 W MJordan0@h BClayton/ Grant

DE 11/ 1 /96 Y

11/ 6 /96 11/ % /96 L 11/ef/96

GTICIAL IEDO EP(