Forwards Insp Rept 50-440/96-10 on 960923-27.No Violations Noted
ML20134K773
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/14/1996
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Myers L
CENTERIOR ENERGY
Shared Package
ML20134K775 List:
References
NUDOCS 9611200024
Download: ML20134K773 (2)


See also: IR 05000440/1996010

Text

Lg

]

o-

,

.

$i

+e

Y

p-

November 14, 1996

i

Mr. Lew W. Myers

i

Vice President

Nuclear - Perry

Centerior Service Company

Box 97, A2OO

Perry, OH 44081

SUBJECT:

INSPECTION REPORT NO. 50-440/96010(DRS)

Dear Mr. Myers:

This refers to the inspection conducted by Messrs. J. L. Belanger and G. L. Pirtle of this

office on September 23-27,1996, of activities authorized for your Perry Nuclear Power

Plant, Unit 1, facility. The focus of this inspection was implementation of your Access

Authorization program. At the conclusion of the inspection, the findings were discussed

with those members of your staff identified in the enclosed report.

I

Areas examined during the inspection are identified in the report. Within these areas, the

inspection consisted of selective examinations of procedures, representative records and

interviews with personnel.

No violations of NRC requirements were identified during the course of this inspection, and

within the scope of this inspection the Access Authorization Program adequately met the

regulatory requirements of 10 CFR 73.56. Program strengths and weaknesses were noted'

and are addressed in the Report Details. Inspection results identified a considerable level

- of decentralization in the implementation and control of your access authorization program.

Significant program responsibilities are vested in your self-screening contractors and

different licensee organizations. While this approach meets regulatory requirements,

_

,

excellent communication and overview are necessary to continue to implement the

program in a successful manner.

j

in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter

and the enclosure will be placed in the NRC Public Document Room.

,

I

'l

i

,

)

9611200024 961114

PDR

ADOCK 05000440

G

PDR

..

.

. .

.

,..

L. W. Myers

-2-

November 14, 1996

We will gladly discuss any questions you have concerning this inspection.

. Sincerely,

Original Signed by Brent Clayton (for)

Geoffrey E. Grant, Director

Division of Reactor Safety

Docket No. 50-440 -

Enclosure:

Inspection Report

No. 50-440/96010(DRS)

cc w/ encl:

J. P. Stetz, Senior Vice

President - Nuclear

L. W. Worley, Director, Nuclear

Services Department

'

J. D. Kloosterman, Manager,

Regulatory Affairs

W. R. Kanda, Director, Perry

Nuclear Assurance Department

N. L. Bonner, Director, Perry

Nuclear Engineering Department

H. Ray Caldwell, General Superintendent

1

Nuclear Operations

j

R. D. Brandt, General Manager Operations

'

Terry L. Lodge, Esq.

State Liaison Officer, State of Ohio

Robert E. Owen, Ohio Department of Health

i

C. A. Glazer, State of Ohio

Public Utilities Commission

]

Distribution-

'

Docket File w/enci

DRS w/ encl

A. B. Beach, Rill w/enci

PUBLIC IE-01 w/enct

Rill PRR w/enci

Enf. Coordinator, Rill w/enci

I

OC/LFDCB w/enci

SRI, Perry w/ encl

CAA1 (E-mail) w/enci

DRP w/enct

LPM, NRR w/enci

W. L. Axelson, Rlli w/ encl

'

DOCUMENT NAME: G:\\DRS\\PER96010.DRS

To receive a copy of thle document. Indicate in the box: M" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure

I

"N* = No copy

f

0FFICE

RIII:DRS

E RIIA:Dlf f

RIII:DRS

l

RIII:DRS

l

ep

W

HClaytnFrant

NAME

a

R

y

DATE

If/(p/96

IW ?$6

l$//T/96

1(/f196

y