ML20134K773
| ML20134K773 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 11/14/1996 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Myers L CENTERIOR ENERGY |
| Shared Package | |
| ML20134K775 | List: |
| References | |
| NUDOCS 9611200024 | |
| Download: ML20134K773 (2) | |
See also: IR 05000440/1996010
Text
Lg
]
- o-
,
.
$i
+e
Y
p-
November 14, 1996
i
Mr. Lew W. Myers
i
Vice President
Nuclear - Perry
Centerior Service Company
Box 97, A2OO
Perry, OH 44081
SUBJECT:
INSPECTION REPORT NO. 50-440/96010(DRS)
Dear Mr. Myers:
This refers to the inspection conducted by Messrs. J. L. Belanger and G. L. Pirtle of this
office on September 23-27,1996, of activities authorized for your Perry Nuclear Power
Plant, Unit 1, facility. The focus of this inspection was implementation of your Access
Authorization program. At the conclusion of the inspection, the findings were discussed
with those members of your staff identified in the enclosed report.
I
Areas examined during the inspection are identified in the report. Within these areas, the
inspection consisted of selective examinations of procedures, representative records and
interviews with personnel.
No violations of NRC requirements were identified during the course of this inspection, and
within the scope of this inspection the Access Authorization Program adequately met the
regulatory requirements of 10 CFR 73.56. Program strengths and weaknesses were noted'
and are addressed in the Report Details. Inspection results identified a considerable level
- of decentralization in the implementation and control of your access authorization program.
Significant program responsibilities are vested in your self-screening contractors and
different licensee organizations. While this approach meets regulatory requirements,
_
,
excellent communication and overview are necessary to continue to implement the
program in a successful manner.
j
in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter
and the enclosure will be placed in the NRC Public Document Room.
,
I
'l
i
,
)
9611200024 961114
ADOCK 05000440
G
..
.
. .
.
,..
L. W. Myers
-2-
November 14, 1996
We will gladly discuss any questions you have concerning this inspection.
. Sincerely,
Original Signed by Brent Clayton (for)
Geoffrey E. Grant, Director
Division of Reactor Safety
Docket No. 50-440 -
Enclosure:
Inspection Report
No. 50-440/96010(DRS)
cc w/ encl:
J. P. Stetz, Senior Vice
President - Nuclear
L. W. Worley, Director, Nuclear
Services Department
'
J. D. Kloosterman, Manager,
Regulatory Affairs
W. R. Kanda, Director, Perry
Nuclear Assurance Department
N. L. Bonner, Director, Perry
Nuclear Engineering Department
H. Ray Caldwell, General Superintendent
1
Nuclear Operations
j
R. D. Brandt, General Manager Operations
'
Terry L. Lodge, Esq.
State Liaison Officer, State of Ohio
Robert E. Owen, Ohio Department of Health
i
C. A. Glazer, State of Ohio
Public Utilities Commission
]
Distribution-
'
Docket File w/enci
DRS w/ encl
A. B. Beach, Rill w/enci
PUBLIC IE-01 w/enct
Rill PRR w/enci
Enf. Coordinator, Rill w/enci
I
OC/LFDCB w/enci
SRI, Perry w/ encl
CAA1 (E-mail) w/enci
DRP w/enct
LPM, NRR w/enci
W. L. Axelson, Rlli w/ encl
'
DOCUMENT NAME: G:\\DRS\\PER96010.DRS
To receive a copy of thle document. Indicate in the box: M" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure
I
"N* = No copy
f
0FFICE
RIII:DRS
E RIIA:Dlf f
RIII:DRS
l
RIII:DRS
l
ep
W
HClaytnFrant
NAME
a
R
y
DATE
If/(p/96
IW ?$6
l$//T/96
1(/f196
y
qlALRECORO' COPY