Forwards Insp Rept 70-1257/96-04 on 961021-25 & Notice of Violation
ML20134K770
Person / Time
Site: Framatome ANP Richland
Issue date: 11/12/1996
From: Scarano R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Femreite B
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
Shared Package
ML20134K772 List:
References
NUDOCS 9611200023
Download: ML20134K770 (3)


Text

. .. .  ;

t 1me UNITED STATES yg. fMCuy\ .p NUCLEAR REGULATORY COMMISSION

  • : $ REGloN IV k 611 RYAN PLAZA drive, SulTE 400

~

(%...,*,[ AR LINGToN, T EXAS 760118064 November 12, 1996 l B. N. Femreite, Vice President Engineering and Manufacturing Siemens Power Corporation 2101 Horn Rapids Road P.O. Box 100 Richland, Washington 99352-0130

SUBJECT:

NRC, INSPECTION REPORT 70-1257/96-04 AND NOTICE OF VIOLATION

Dear Mr. Femreito:

An NRC inspection was conducted October 21-25,1996, at your Siemens Power Corporation facility. The enclosed report presents the scope end results of that inspection. l During the inspection, your conduct of activities at the Sieraens f acility was generally characterized by implementatica of effective programs in the areas of emergency preparedness and fire protection. However, one violation was identified involving the failure to perform semiannual calibrations of direct-reading pocket dosimeters that may be used in the event of an emergency.

l This violation is cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding thi violation are described in detailin the enclosed report. The NRC has concluded that information regarding the reason for the violation, the corrective actions j taken and planned to correct the violation and prevent recurrence is already adequately I addressed in the subject inspection report. Therefore, you are not required to respond to this letter unless the description therein does not accurately reflect your corrective actions )

or your position. In that case, or if you choose to provide additional information, you should follow the instructions specified in the enclosed Notice.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its enclosure (s), and your response will be placed in the NRC Public Document Room (PDR).

I I

\\

200008 9611200023 961112 PDR ADOCK 07001257 l F O) )

Siemens Power Corporation- November 12, 1996 3

Should you have any questions concerning this inspection, we will be pleased to discuss them with you. j i

Sincerely, l

W  !

Ross A. Scarano, Director 3 Division of Nuclear Materials Safety '

Docket No.: 70-1257  !

License No.: SNM-1227 i i

Enclosures:

l

1. Notice of Violation l
2. NRC Inspection Report  !

70-1257/96-04 cc w/ enclosures: ,

L. J. Maas, Manager Regulatory Compliance Siemens Power Corporation 2101 Horn Rapids Road P.O. Box 130 Richland, Washington 99352-0130 State of Washington l

l

. _ _ _ . _ . _ _ _ _ . . . . ~ . . _ - . . . - _ . _ . . _ _ _ _ _ . _ . . - .

i

=Siemens Power Corporation. -3 November 12, 1996 i

)

1 4

j- s Distribution w/ encl: i 1

DMB (IEO7) z j , DJWeiss, OC/LFDCB (T-9E10)  ;

LJCallan 3

.RAScarano .  !

CLCain -

LLHowell KEPerkins

'CAHooker

' MIS System "WCFO File NMi&FC/DB DMCollins, Ril

- GLShear, Rlli 4 RCPierson, FCLB/NMSS (8D3)

. MTAdams, FCLB/NMSS (8H1)

PTing, FCOB, NMSS (8A33)

]

1

',' 'w/lFS Form i

4 i

i i

3

i. DOCUMENT NAME: G:\SPC9604.CAH 2

To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Cpy with enclosures "N'J copy RIV:WCFO:MB RIV:WCFO:MB _ ADD:DNMSf D:DNMSfg 3 CAHookerg/p FAWenslawski@ CLCairf RAScadno 11//$/96 / 8' 11/t#96 11f/96 11 7 /96 OFFICIAL RECORD COPY I

_, -- . . , , , .