Forwards Insp Rept 50-301/96-14 on 961029-970109.No Violations Noted
ML20134K226
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 02/07/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Patulski S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20134K229 List:
References
NUDOCS 9702130194
Download: ML20134K226 (2)


See also: IR 05000301/1996014

Text

- . - . -. .- --, - . . - . .

Y, I

.

February 7, 1997

Mr. S. A. Patulski

Site Vice President

Point Beach Nuclear Plant

6610 Nuclear Road 1

Two Rivers, WI 54241

SUBJECT: NRC INSPECTION REPORT 50-301/96014(DRS)

Dear Mr. Patulski:

On January 9,1997, the NRC completed an inspection at your Point Beach Nuclear Plant,

Unit 2. The focus of this inspection was your steam generator replacement (SGRP)

activities. At the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed report. l

During this inspection, inspectors noted a relatively large number of engineering and

quality assurance hold points throughout the SGRP work packages, which indimed a good

preplanned oversight effort for the SGRP activities. However, misalignments of

connecting feedwater and mainsteam piping, which required emergent system

modifications to correct, indicated that engineering staff preplanning efforts associated

with steam generator installation alignments were not fully affective. Overall, the  ;

inspectors concluded that the welding and nondestructive examinations activities observed

associated with the steam generator replacement met tha American Society of Mechanical

Engineers Code requirements.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter

and the enc losed inspection report will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerniag this inspection.

Sincerely,

/s/ J. A. Grobe

John A. Grobe, Deputy Director j

Division of Reactor Projects '

i

Docket No. 50-301

Enclosure: Inspection Report 50 301/96014(DRS)

Distribution:

See attached listing 9702130194 970207

PDR ADOCK 05000301

G PDR _

DOCUMENT NAME: G:\DRS\ pol 96014.DRS

To receive e copy of this document, indicate in ;he box: "C' = Copy w/o tut 4r'. ment / enclosure *E" = Copy with attach nt/ enclosure *N" = No copy

EOFFICE RIII:DRS lC RIII:DRS . l C- RIII:DRS _ l RIII:DRP 4 RIII:14l l

NAME Holmberg/kjc M Kropp 14 Grant M - 4tKunowskMFJ GrobbW  !

'

DATE 01/29/97 01/29/97 01/%l/ 37) 1 01/ /$ 7 0]./ :H /97

'

0FFICIAL RECORTIOPY

]

_ . . . _ . _ _ _ . -_. --

. .

8

!

i

S. A. Patuiski 2 February 7, 1997

i

!

cc w/ encl: R. R. Grigg, President and Chief

Operating Officer, WEPCo

A. J. Cayia, Plant Manager l

Virgil Kanable, Chief, Boiler Section  !

Cheryl L. Parrino, Chairman, *

Wisconsin Public Servier Commission 7

State Liaison Officer  !

Distribution: }

. Docket File w/enct Rlli PRR w/enct Enf. Coordinator, Rill w/enci

W A.lc IE-0.1;p/ encl SRI, Ft. Beach w/ encl CAA1 w/enct

OC/LFDCB w/ehcl LPM, NRR w/ encl i

DRP w/enct A. B. Beach, Rlll w/enci  !

DRS w/enci W. L. Axelson, Rlli w/enci l

,

I

<

l

/

{

l300.;9

i

.-. _ _

- . -- _

1