February 7, 1997
Mr. S. A. Patulski
Site Vice President
Point Beach Nuclear Plant
6610 Nuclear Road
1
Two Rivers, WI 54241
SUBJECT:
NRC INSPECTION REPORT 50-301/96014(DRS)
Dear Mr. Patulski:
On January 9,1997, the NRC completed an inspection at your Point Beach Nuclear Plant,
Unit 2. The focus of this inspection was your steam generator replacement (SGRP)
activities. At the conclusion of the inspection, the findings were discussed with those
members of your staff identified in the enclosed report.
During this inspection, inspectors noted a relatively large number of engineering and
quality assurance hold points throughout the SGRP work packages, which indimed a good
preplanned oversight effort for the SGRP activities. However, misalignments of
connecting feedwater and mainsteam piping, which required emergent system
modifications to correct, indicated that engineering staff preplanning efforts associated
with steam generator installation alignments were not fully affective. Overall, the
inspectors concluded that the welding and nondestructive examinations activities observed
associated with the steam generator replacement met tha American Society of Mechanical
Engineers Code requirements.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter
and the enc losed inspection report will be placed in the NRC Public Document Room.
We will gladly discuss any questions you have concerniag this inspection.
Sincerely,
/s/ J. A. Grobe
John A. Grobe, Deputy Director
j
Division of Reactor Projects
'
i
Docket No. 50-301
Enclosure:
Inspection Report 50 301/96014(DRS)
Distribution:
See attached listing
9702130194 970207
ADOCK 05000301
G
_
DOCUMENT NAME: G:\\DRS\\ pol 96014.DRS
To receive e copy of this document, indicate in ;he box: "C' = Copy w/o tut 4r'. ment / enclosure *E" = Copy with attach nt/ enclosure *N" = No copy
EOFFICE
RIII:DRS
lC
RIII:DRS . l C-
RIII:DRS _ l
RIII:DRP 4
RIII:14l
l
NAME
Holmberg/kjc M
Kropp 14
Grant M -
4tKunowskMFJ
GrobbW
DATE
01/29/97
01/29/97
01/%l/ 37)
1 01/
/$ 7
0]./ :H /97
'
'
0FFICIAL RECORTIOPY
]
_ .
. . _ . _ _ _ .
-_.
--
.
.
8
!
i
S. A. Patuiski
2
February 7, 1997
i
!
cc w/ encl:
R. R. Grigg, President and Chief
Operating Officer, WEPCo
A. J. Cayia, Plant Manager
l
Virgil Kanable, Chief, Boiler Section
!
Cheryl L. Parrino, Chairman,
Wisconsin Public Servier Commission
7
State Liaison Officer
!
Distribution:
}
. Docket File w/enct
Rlli PRR w/enct
Enf. Coordinator, Rill w/enci
W A.lc IE-0.1;p/ encl
SRI, Ft. Beach w/ encl
CAA1 w/enct
OC/LFDCB w/ehcl
LPM, NRR w/ encl
i
DRP w/enct
A. B. Beach, Rlll w/enci
DRS w/enci
W. L. Axelson, Rlli w/enci
,
I
<
l
/
{
l300.;9
i
--
. --
- .-.
1
.-.
_ _
- .
_