ML20134J772

From kanterella
Jump to navigation Jump to search
Forwards Schedule for Planned Insp Effort Resulting from PPR Completed 961007
ML20134J772
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/06/1996
From: Lesser M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kingsley O
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 9611180052
Download: ML20134J772 (6)


Text

l I

November 6, 1996 Tennessee Valley Authority ATTN: Mr. Oliver D. Kingsley, Jr.

President, TVA Nuclear and Chief Nuclear Officer 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - SEQUOYAH

Dear Mr. Kingsley:

On October 7,1996, the Regional staff completed the semiannual Plant Performance Review (PPR) of Sequoyah. The staff conducts these reviews for all operating nuclear >ower plants to develop an integrated understanding of  ;

safety performance. T1e results are used by Regional management to facilitate l planning and allocation of inspection resources. The PPR for Sequoyah  !

involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period from March 1996 through August 1996. PPRs provide Regional management with a current summary of licensee aerformance and serve as inputs to the NRC Systematic Assessment of Licensee )erformance (SALP) and Senior Management Meeting (SMM) reviews.

i This letter advises you of our planned inspection effort resulting from the l Sequoyah PPR review. It is provided in an attempt to minimize the resource impact on your staff and to allow for scheduling conflicts to be resolved in advance of inspection dates. The enclosure presents our inspection plan for .

the next six months. Specific dates are included for near term inspections. l Long term inspection dates will be announced prior to the inspections and any scheduling conflicts will be resolved with your staff. The rational or basis for each inspection outside the core inspection program is provided so that you are aware of the reasons for em)hasis in these program areas. Resident inspections are not listed due to t1eir ongoing and continuous nature nor are  !

region based inspections which accomplish resident core modules to compensate l for resident inspector absences. j During each NRC inspection planned during this period, specific attention will l continue to be given to the verification of selected Updated Final Safety Analysis Re> ort (UFSAR) commitments. Applicable portion (s) of the UFSAR that relate to t1e inspection activities will be reviewed and verification made that the UFSAR commitments have been properly implemented into plant practices, procedures and/or parameters.

4 150074  !

9611180052 961106 PDR ADOCK 05000327 G PDR

-C6ol j

l TVA 2  !

We will inform you of any changes to the inspection plan. If you have any questions, please contact Mr. M. Lesser at (404) 331-0342.

Sincerely.

OriginalSigned by E S.Lasser Mark S. Lesser. Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos. 50 327, 50-328 License Nos. DPR-77. DPR-79

Enclosure:

(See page 3) l i

i l

l l s

. . ~ _.

TVA 3 cc w/ encl:

Mr. O. J. Zeringue, Senior Vice President Mr. R. H. Shell, Manager Nuclear Operations Licensing & Industry Affairs Tennessee Valley Authority Sequoyah Nuclear Plant 6A Lookout Place Tennessee Valley Authority 1101 Market Street P. O. Box 2000 Chattanooga, TN 37402 2801 Soddy-Daisy, TN 37379 Dr. Mark 0. Medford, Vice President Mr. J. T. Herron, Plant Manager Engineering and Technical Services Sequoyah Nuclear Plant 6A Lookout Place Tennessee Valley Authority 1101 Market Street P. O. Box 2000 Chattanooga, TN 37402 2801 Soddy Daisy TN 37379 Mr. R. J. Adney, Site Vice President Mr. M. H. Mobley, Director  :

Sequoyah Nuclear Plant Div., of Radiological Health Tennessee Valley Authority 3rd Floor. L and C Annex P. O. Box 2000 401 Church Street Soddy Daisy TN 37379 Nashville, TN 37243 1532 General Counsel County Executive I Tennessee Valley Authority Hamilton County Courthouse ET 10H Chattanooga, TN 37402-2801 l 400 West Summit Hill Drive Knoxville, TN 37902 Distribution w/ encl: (See page 4) l Mr. R. R. Baron, General Manager Nuclear Assurance & Licensing 4J Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Mr. P. Salas, Manager Licensing and Industry Affairs Tennessee Valley Authority 4J Blue Ridge 1101 Market Street Chattanooga, TN 37402 2801 l

l l

TVA 4 Distribution w/ encl:

, E. W. Herschoff, RII H. S. Lesser, RII S. E. Sparks, RII F. J. Hebdon, NRR R. W. Hernan, NRR H. L. Whitener, RII i C. F. Smith, RII D. H. Thompson, RII J. H. Moorman, RII O. W. Jones, RII PUBLIC NRC Resident Inspector U. S. Nuclear Regulatory Commission 2600 Igou Ferry Soddy Daisy, TN 37379 NRC Resident Inspector U. S. Nuclear Regulatory Connission 1260 Nuclear Plant Road i Spring City TN 37381 i i

0 SEND TO PUB!fC DOCUMENT ROOM) IYFS / / NO OFFICE DRP/RI! , DRP/RIl DRP/RII DRS/RII , DRS/R!l DRS/RII

[g  !

SIGNATURE

{

NAME SSpahs:vyg MLesser HChristensen . ~ cr ho TPeebiet DATE 10/lk/96 f Q/\ / 96 I N3f / 96 f/ f/96 10 A / 96 1h / f / 96 COPY? YES NO SEND TO PURt1C 000 PENT R00M1 YES NO OFFICE f SIGNATURE NAME DVerrellt DATE O h/% 10 / / 96 10 / / 96 10 / / 96 10 / / 96 10 / / 96 COPY? [VEf NO YES NO YES NO YES NO YES NO YES NO OrFICiAL Kr_wku COPi DOCUMt.Ni NAMO G:\BR6.5mFFh1096. iLR

SEQUOYAH INSPECTION PLAN Inspection Title No. of Inspection Type ofInspection Procedure Inspectors Dates IP 62706 Maintenance Rule 5 12/2-6/96 Required Team inspection IP 71714 Cold Weather Preparations 1 12/96 Regional Initiative - Focus on Implementation & Maintenance IP 71001 Licensed Operator Requal. I 12/2-6/976 Core inspection Examinations IP 84750 Radiation Protection i 12/2-6/96 Core Inspection IP 86750 IP 40500 Effectiveness of Licensee Controls in i 12/16-20/96 Regional Initiative - Reliability Study Corrective Actions in Identifying, Resolving, Preventing Problems Maintenance IP 37550 Engineering 3 1/6-17/97 Core Inspection., focused on Root Causes, Suppoit to Maintenance, recurrence control. EQ IP 40500 Effectiveness of Licensee Controls in 1 2/97 Regional Initiative - Reliability Study Corrective Actions in Identifying, Resolving, Preventing Problems Operations IP 40500 EfTectiveness of Licensee Controls in 1 2/3-14/97 Regional Initiative - Reliability Study Corrective Actions in Identifying, Resolving, Preventing Problems Engineering IP 62700 Switchyard Maintenace 1 2/10-14/97 Regional Initiative based upon equipment performance IP 64704 Fire Protection 1- 2/24-28/97 l Regional Initiative to followup on corrective actions IP 37550 Engineering i 3/31/97 - Outage Modifications 4/4/97 IP 83750 Radiation Protection 1 3/31/97 - Core Inspection 4/4/97 IP 73753 Inservice Inspections 1 4/14-18/97 Core Inspection Enclosure

~

_ .__ _ _ _ _ _ _ _ . _ . _ . . . _ . _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ ~_ _ _ . _ _ . . _ _ _ _ - _

aw - , wss ek (cw,5 -- ,.2;A--.a. ~4,A La- , d- - - w-deJ *+3 le&* La .e e4 % m a6as,wA -4 _-44e4AL .-4.e4 -G& u 4_w- w a -4,a-- et,u--

h e e . I.

4 i

i I

d 4

4 4

1 O

~~

C a ==

o )

U <

1 1

r i

o C

.}

. 1 .u.

O 5

e N hk i d' 1 9

1 m

i i

I-1 4

J 4

i F 3 .x

  • C
s N

.2 E

f 4

s 8

==

n J

.,