LIC-97-0014, Addresses NRC Concern Re Change to Encl FCS Security Training & Qualification Plan
| ML20134J673 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 01/31/1997 |
| From: | Tills J OMAHA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20134J677 | List: |
| References | |
| LIC-97-0014, LIC-97-14, NUDOCS 9702120248 | |
| Download: ML20134J673 (3) | |
Text
Omaha Public PowerDistrict
?
444 South 16th Street Mall Omaha NE 68102-2247 January 31, 1997 LIC-97-0014 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, DC 20555
References:
1.
Docket No. 50-285 2.
Letter from 0 PPD (T. L. Patterson) to NRC (Document Control Desk) dated November 15, 1996 (LIC-96-0176) 3.
Letter from NRC (T.
P.
Gwynn) to OPPD (T.
L.
Patterson) dated
)
December 12, 1996
SUBJECT:
Clarification to Revision 5 of the Fort Calhoun Station (FCS) Security Training and Qualification Plan, Paragraph 1.5 Omaha Public Power District (0 PPD) is submitting this letter to address an NRC concern regarding a change to the FCS Security Training and Qualification Plan (T&QP).
The concern documented in Reference 3 pertains to Paragraph 1.5 of the FCS Security T&QP Revision 5 as submitted in Reference 2.
Paragraph 1.5 in Revision 5 was interpreted, as noted in Reference 3, to no longer require armed nuclear officers to pass a physical (medical) examination required by 10 CFR Part 73, Appendix B, Sections I.B(1)b and I.E.
OPPD did not intend for Paragraph 1.5 to be interpreted in this manner.
To provide clarification, OPPD revised Revision 5 (marked as Change A) to clearly word Paragraph 1.5 that armed nuclear officers and alarm station operators must pass an annual physical examination.
Attachment A contains a new Title Page listing the change, an explanation of the change, and page 7 of 19, which contains Paragraph 1.5.
The change to Paragraph 1.5 is identified with a revision bar in the right margin designated as Change A.
(The i
\\))
revision number (5) and date (11/07/96) are not being changed as a result of the incorporation of Change A.) To facilitate NRC review, Attachment B contains Paragraph 1.5 as found in Revision 4 of the T&QP as well as page 2 of 19 (Definitions) and page 7 of 19 (Paragraph 1.5) from Revision 5 of the T&QP. This submittal has been determined not to contain safeguards information.
h6 9702120248 970131 PDR ADOCK 05000285 F
PDR 12001f 45 5124 Employment with Equal Opportunhy
U.S. Nuclear Regulatory Commission LIC-97-0014 Page 2 Should you have any questions concerning this matter, please contact me.
Sincerely, F
J. W. Tills Manager - Nuclear Licensing i
JWT/mle Attachments c:
Winston & Strawn L. J. Callan, NRC Regional Administrator, Region IV W. C. Walker, NRC Senior Resident Inspector L. R. Wharton, NRC Project Manager 1
4 4
4
U.S. Nuclear Regulatory Conrnission LIC-97-0014 l
ATTACHMENT A 1