ML20134J635

From kanterella
Jump to navigation Jump to search
Notification of 961121 Meeting W/Licensee & Representatives in Rockville,Md to Discuss Alternate Repair Criteria for Circumferential Cracking of SG Tubes
ML20134J635
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/13/1996
From: Salehi K
NRC (Affiliation Not Assigned)
To: Beckner W
NRC (Affiliation Not Assigned)
References
NUDOCS 9611150313
Download: ML20134J635 (5)


Text

- . .. ..

l f MEMORANDUM T0: Willia 2 D. Beckner, Director November 13, 1996 l Project Directorate IV-1 Division of Reactor Projects III/IV FROM: Kombiz Salehi, Acting Project Manager ORIG. SIGNED BY:

Project Directorate IV-1 Division of Reactor Projects III/IV 1

SUBJECT:

MEETING WITH INDUSTRY GROUP ON ALTERNATE REPAIR CRITERIA FOR STEAM GENERATOR CIRCUMFERENTIAL CRACK DATE & TIME: Thursday, November 21, 1996 '

9:00 am - 11:00 am )

i l

LOCATION: One White Flint North 11555 Rockville Pike Rockville, Maryland Room 0-10-B-11 PURPOSE: To meet with the licensee and industry group representatives, and hear their presentation on alternate repair criteria for circumferential cracking of the steam generator tubes.

PARTICIPANTS *: NRC UTILITY W. Beckner B. Converse E. Murphy D. James P. Rush J. Strosnider T. Sullivan K. Wichman

! Docket Nos. 50-313 and 50-368 cc: See next page CONTACT: K. Salehi j 415-1367 j l

Attachment:

Meeting Announcement

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340,9/20/94.

DISTRIBUTION: See next page 7 I

I Document Name: ST112196.MTR hFD j OFC PM/PD4-1 (A)LA/PD4-1 NAME KSalehikf CHawes DATE 11 / l 3 / 9 6 / /96

. COPY YES/NO YES/N0 k 0FFICIAL RECORD COPY 9611150313 961113 h

PDR ADOCK 05000313 P PDR

r. rg k, UNITED STATES

[ S NUCLEAR REGULATORY COMMISSION EA f WASHINGTON, D.C. 2006M1001 kg p8 November 13, 1996 MEMORANDUM T0: William D. Beckner, Director Project Directorate IV-1 Division of Reactor Projects III/IV FROM:

)(4. Kombiz Salehi, Acting Project Manager '

Project Directorate IV-1 Division of Reactor Projects III/IV

SUBJECT:

MEETING WITH INDUSTRY GROUP ON ALTERNATE REPAIR CRITERIA t STEAM GENERATOR CIRCUMFERENTIAL CRACK '

DATE & TIME: Thursday, November 21, 1996 9:00 am - 11:00 am l

LOCATION: l One White Flint North i 11555 Rockville Pike  !

Rockville, Maryland l Room 0-10-B-11 PURPOSE:

To meet with the licensee and industry group representatives, and hear their presentation on alternate repair criteria for circumferential cracking of the steam generator tubes.

PARTICIPANTS *: Nlt UTILITY W. Beckner B. Converse E. Murphy D. James P. Rush J. Strosnider T. Sullivan K. Wichman Docket Nos. 50-313 and 50-368 '

cc: See next page CONTACT: K. Salehi 415-1367

Attachment:

Meeting Announcement l

l

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340, 9/20/94.

r

Entergy Operations, Inc.

Arkansas Nuclear One, Units 1 & 2 cc:

Executive Vice President Vice President, Operations Support

& Chief Operating Officer Entergy Operations, Inc.

4 Entergy Operations, Inc. P. O. Box 31995 P. O. Box 31995 Jackson, MS 39286-1995 Jackson, MS 39286-1995 Director, Division of Radiation Wise, Carter, Child & Caraway Control and Emergency Management P. O. Box 651 Arkansas Department of Health Jackson, MS 39205 4815 West Markham Street, Slot 30

. Little Rock, AR 72205-3867 Vice President Operations, ANO Entergy Operations, Inc.

Winston & Strawn 1448 S. R. 333

1400 L Street, N.W. Russellville, AR 72801 Washington, DC 20005-3502
Manager, Rockville Nuclear Licensing Framatone Technologies 1700 Rockville Pike, Suite 525 1 Rockville, MD 20852 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 310 London, AR 72847 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 County Judge of Pope County Pope County Courthouse Russellville, AR 72801

s  :

! MEETING AMOUNCEMENT DATE: 11/21/1996 I TIME: 9:00 AM DURATION: < TWO HOURS LOCATION: 0WF-10B11 l

l

SUBJECT:

ALTERNATE REPAIR CRITERIA FOR STEAM GENERATOR I

CIRCUMFERENTIAL CRACK

! AGEEA: 4 SUBJECT PRESENTER ORGANIZATION I

1. INTRODUCTION D. JAMES ENTERGY
2. BACKGROUND D. STEINNINGER EPRI

- HISTORY OF PROJECT

- PROJECT STATUS j

3. CURRENT ACTIVITIES T. PITTERLE WESTINGHOUSE
4. PLANNED ACTIVITIES T. PITTERLE WESTINGHOUSE
5. PROJECT SCHEDULE D. STEINNINGER EPRI l 6. CONCLUSIONS D. JAMES ENTERGY ATTENDEES:
NAMES ORGANIZATION
DON STREINZ ABB l JAMES BEGLEY APTECH ENGINEERING SERVICES l STEVE BROWN APTECH ENGINEERING SERVICES

! SHERRI BERNH0FT EPRI - ARC ISSUES RESOLUTION GROUP CHAIR

! DAVID STEINNINGER EPRI - PROJECT MANAGER l TOM PITTERLE WESTINGHOUSE BILL CONVERSE ENTERGY DALE JAMES ENTERGY OTHERS VARIOUS LICENSEES NRR POTENTIAL ATTENDEES l CHERYL BEARDSLEE WILLIAM BECKNER EMIT MURPHY PAUL RUSH KOMBIZ SALEHI JACK STR0 SNIDER TED SULLIVAN

! KEITH WICHMAN ATTACHMENT l

t Distribution for Meeting Notice Dated: November 21, 1996 f

PUBLIC PD#IV-1 r/f OGC ACRS Receptionist (0WFN)

E-Mail:

R. Zimmerman (RPZ)

J.' Roe (JWR)

E. Adensam (EAG1) l W. Beckner (WDB)

K. Salehi (KXST)

D. Matthews (DBM)

A. Chaffee (AEC1)

E. Jordan (JKR)

OPA E. Hackett (EMH1)

J. Dyer (JED2)

J. Gilliland (JTG)

PMNS C. Grimes (CIG)

A. Thadani (ACT)

E. Murphy (ELM)

P. Rush (PJRI)

, J. Strosnider (JRS2)

T. Sullivan (EJS)

K. Wichman (KRW) l l

l n

l l