ML20134J603

From kanterella
Jump to navigation Jump to search
Confirms 970203 Telcon Between to Mckernon & J Dampf for NRC to Inspect Licensed Operator Requalification Program at Plant for Wk of 970519
ML20134J603
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/06/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Schnell D
UNION ELECTRIC CO.
References
NUDOCS 9702120217
Download: ML20134J603 (5)


Text

,,

p* "E coq UNITED SVAVES

t. I+. NUCLEAR REGULATORY COMMISSION REGloN iv g

+S , f 611 RYAN PLAZA oRIVE. SulTE 400

$9 . . . . ,8 AR LINGToN, TE X AS 76011-8064 FEB 6W Donald F. Schnell, Senior Vice President - Nuclear Union Electric Company P.O. Box 149 St. Louis, Missouri 63166

SUBJECT:

NRC INSPECTION REPORT 50-483/97-06(REQUALIFICATION PROGRAM)

Dear Mr. Schnell:

In a telephone conversation on February 3,1997, Mr. T. O. McKernon, of my staff, and Mr. J. Dampf, of your office, made arrangements for the NRC to inspect the licensed operator requalification program at the Callaway Plant. The inspection is planned for the week of May 19,1997, which coincides with your regularly scheduled requalification examination cycle. The staff at your f acility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests, as necessary, to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the operating tests scheduled for the week of the inspection to the NRC by May 5,1997. Mr. J. Dampf has been advised of this request and provided l with the name and address of the NRC lead inspector assigned to this inspection.

i This request for requalification examination materialis covered by the Office of Management and Budget (OMB) Clearance Nurnber 3150-0101,which expires on October 31,1998. The estimated average burden is 4.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> per response, including gathering, copying and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of infortnation, including suggestions for reducing this burden, to the Information and Records Management Branch, T-6 F33, Division of Information Support Services, Of fice of Information Resources Management, U. S. Nuclear Regulatory Commission, Washington, D. C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-10202, Office of Management and Budget, Washington, D. C. 20503, if you have any questions regarding this inspection, please contact John Pellet, Chief, Operations Branch at 817/860-8159er Tom McKernon at 817/860-8153.

Sincere 4 -

/ / .

- bhk Thomas P. Gwyn ', Dire or Division of Reacto ty i

9702120217 970206 PDR ADOCK 05000483 G PDR

Union Electric Company Docket: 50-483 License: NPF-30 cc:  ;

Professional Nuclear Consulting, Inc.  !

19041 Raines Drive  :

Derwood, Maryland 20855 f Gerald Charnoff, Esq. i Thomas A. Baxter, Esq. l Shaw, Pittman, Potts & Trowbridge i 2300 N. Street, N.W.

  • Washington, D.C. 20037 H. D. Bono, Supervising Engineer  ;
. Site Licensing '

Union Electric Company i

P.O. Box 620 ,

Fulton, Missouri 65251 l

t G. L. Ra.1dolph, Vice President .

Nuclear Operations  !

Union Electric Company l P.O. Box 620  :

Fulton, Missouri 65251 l t

Manager - Electric Department i Missouri Public Service Commission J 301 W. High P.O. Box 360 Jefferson City, Missouri 65102 Ronald A. Kucera, Deputy Director j l Department of Natural Resources l

P.O. Box 176 Jefferson City, Missouri 65102

( Neil S. Carns, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation

! P.O. Box 411 l Burlington, Kansas 66839

1 Union Electric Company Dan 1. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, Missouri 63130 Lee Fritz, Presiding Commissioner Callaway County Court House 10 East Fifth Street Fulton, Missouri 65151 Alan C. Passwater, Manager Licensing and Fuels Union Electric Company P.O. Box 149 St. Louis, Missouri 63166 J. V. Laux, Manager Quality Assurance i Union Electric Company l P.O. Box 620 Fulton, Missouri 65251 G. Czeschin Training Manager Union Electric Company )

P.O. Box 620 '

Fulton, Missouri 65251 l

l

Union Electric Company E-Mail report to T. Boyce (THD)

E-Mail report to NRR Event Tracking System (IPAS) bec to DMB (IE01, IE42) bec distrib. by RIV:

L. J. Callan Resident inspector DRP Director DRS-PSB Branch Chief (DRP/B) MIS System Project Engineer (DRP/B) RIV File Branch Chief (DRP/TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Laura Hurley S. Richards (10D 22) l l

r DOCUMENT NAME: R:\_CW\706lt. tom i

To receive copy of document, indicate inpx: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:RE:DRS/Olif[W C:OB:Q$S/ /d D:DRS [}_

TOMcKernon [J J TPGwynnd([ f

, JLPellet) 02/h/97 02/(t/97 02/(d97 6 I

OFFICIAL RECORD COPY i

i

r' .

Union Electric Company I l

E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking Fy Aem (IPAS) bec to DMBM, IE42) ,

bec distrib. by RIV:

L. J. Callan Resident inspector a DRP Director DRS-PSB 4

Branch Chief (DRP/B) MIS System Project Engineer (DRP/B) RIV File l Branch Chief (DRP/TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Laura Hurley l S. Richards (10D 22) i i i  :

i 4

}

l-i

. DOCUMENT NAME: R:\ CW\7061t. tom

  • To receive copy of document, indicate in hox: "C" = Copy without enclosures "E" = Copy with enclosurrs "N" = No copy I

3 RIV:RE:DRS/Olir h i C:OB:D$S f, ~ D:DRS ()_

j TOMcKernon .,JJ JLPelletj fPG,wynng Q l( .

02/k/97 02/lg97 i i 02/J/97

) OFFICIAL RECORD COPY 1

0

\

120005

._- -