Advises of Planned Inspection Effort Resulting from Hatch Plant Performance Review.Insp Plan for Next Six Months Encl
ML20134J460
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/07/1996
From: Skinner P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Beckham J
SOUTHERN NUCLEAR OPERATING CO.
References
NUDOCS 9611150217
Download: ML20134J460 (5)


Text

.

O Novmber 7,1996 Southern Nuclear Operating Company, Inc.

ATTN: Mr. J. T. Beckham, Jr.

Vice President, Plant Hatch Nuclear Operations P.O. Box 1295 Birmingham, AL 35201

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - HATCH On October 1, 1996, the regional staff completed the semiannual Plant Performance Review (PPR) of Hatch. The staff conducts  !

these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results  !

are used by regional management to facilitate planning and i allocation of inspection resources. The PPR for Hatch involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period from March 1996 through August 1996. PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Hatch PPR review. It is provided in an attempt to minimize the resource impact on your e.Tff and to allow for scheduling conflicts to be resolved 11. .vance of inspection dates. The enclosure presents our inspection plan for the next six months. Specific dates are included for near term inspections. Long term inspection dates will be announced prior to the inspections and any scheduling conflicts will be resolved with your staff. The rational or basis for each inspection outside the core inspection program is provided so that you are aware of the reasons for emphasis in these program areas.

Resident inspections are not listed due to their ongoing and continuous nature, nor are Region-based inspections which accomplish Resident Core Modules to compensate for Resident Inspector absences due to training.

During each NRC inspection planned during this period, specific attention will continue to be given to the verification of selected Updated Final Safety Analysis Report (UFSAR) commitments. Applicable portion (s) of the UFSAR that relate to the inspection activities will be reviewed and verification made that the UFSAR commitments have been properly implemented into plant practices, procedures and/or parameters.

9611150217 961107 l PDR ADOCK 05000321 <

G PDR j

$0I

I SNC 2  ;

i We will inform you of any changes to the inspection plan. If you  ;

have any questions, please contact P. H. Skinner at  ;

(404)-331-6299. ,

Sincerely, t

(Original signed by Pierce H. Skinner)

Pierce H. Skinner, Chief  !

Reactor Projects Branch 2 i Division of Reactor Projects t Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-7

Enclosure:

Inspection Plan l cc w/ encl:  ;

J. D. Woodard  !

Senior Vice President '

Georgia Power Company i Nuclear Operations P. O. Box 1295 '

Birmingham, AL 35201 H. L. Sumner, Jr. f' General Manager, Plant Hatch Georgia Power Company P. O. Box 439 Baxley, GA 31513 D. M. Crowe Manager Licensing - Hatch Georgia Power Company P. O. Box 1295 Birmingham, AL 35201 Ernest L. Blake, Esq.

Shaw,.Pittman, Potts and Trowbridge 2300 N Street, NW Washington, D. C. 20037 Charles H. Badger l Office of Planning and Budget j Room 610 ~

270 Washington Street, SW l Atlanta, GA 30334 L

cc w/encls cont'd: (See page 3)

1 e

SNC 3 l cc w/encls: Continued Harold Reheis, Director Department of Natural Resources

'205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Thomas Hill,. Manager Radioactive Materials Program Department of Natural Resources 4244 International Parkway Suite 114 Atlanta, GA 30354 Chairman Appling County Commissioners

-County Courthouse Baxley, GA 31513

. Thomas P. Mozingo Manager of Nuclear Operations Oglethorpe Power Corporation 2100 E. Exchange Place Tucker, GA 30085-1349 Charles A. Patrizia, Esq.

Paul, Hastings, Janofsky & Walker 10th Floor 1299 Pennsylvania Avenue Washington, D. C. 20004-9500 Thomas P. Mozingo Manager of Nuclear Operations Oglethorpe Power-Corporation 2100 E. Exchange' Place Tucker, GA 30085-1349 Charles A. Patrizia, Esq.

Paul, Hastings, Janofsky & Walker 10th Floor ~

1299 Pennsylvania Avenue Washington, D. C. 20004-9500 Distribution w/encls:

K. N. Jabbour, NRR P. H. Skinner, RII R. P. Carrion, RII W. P. Kleinsorge, RII G. A. Hallstrom, RII PUBLIC

4 SNC 4 Distribution w/encls:

Continued 4

NRC Senior Resident Inspector U.S. Nuclear Regulatory Commission 11030 Hatch Parkway North Baxley, GA 31513 4

l 1

, l I

I

^

\

SEND TO PUBtIC DOCUMENT ROOMS A/ VES NO 0FFICE RII:DRP R Rll:DRS:EB Rll:DRS:MB RII:DRS-51B R!!:DRS:PSB SIGNATURE

[b I h

KAME RPCarrion:dka HSkinne,r CCa o / . HChristensen PFredrickson KBarr DATE 10 /7-f / 96 h)h/96 10 /  ! / 96 10 / h / 96 h h / 96 10 / 3 0 / 96 COPY? /YE[ NO [d NO (5ES) NO [E) NO [YES) NO M NO y - -

v v SEND TO PUB'TC t DOCUMFNT R00M7 YES NO OFFICE RII:DRS:0LHP  !!:0RP

$1GNATURE NAME TPeebids EWMer .off DATE 10/O/96 10 / \96 10 / / 96 10 / / 96 10 / / 96 10 / / 96 COPY? fEk ' NO VES N0h YES NO VES NO YES NO YES NO UFHLIAt htCURV COPY DOCUMtNI MMt: A:\niFFkLTR.990

.j

HATCH INSPECTION PLAN .

INSPECTION TITLE / PROGRAM AREA NUMBER OF PLANNED TYPE OF INSPECTION - BASIS PROCEDURE / INSPECTORS INSPECTION TEMPORARY DATES INSTRUCTION IP 62706 Maintenance Rule Baseline 5 10/21/96 Team Inspection - Maint. Rule Audit [ MAINTENANCE - MNT] Implementation IP 84750 Rad Waste Systems. Water 1 11/12/96 Core Inspection Chemistry. & Envir. Monitoring IP 86750 Rad Waste Management & Transp.

TI 133 Rad Waste Combine with 86750

[ PLANT SUPPORT - PS]

TI 130 Improved TSs 1 11/18/96 Area of Emphasis -

[ MAINTENANCE - MNT] Surveillance IP 64704 Fire Protection Program 1 1/6/97 Core Inspection

[ PLANT SUPPORT - SI]

IP 62700 Maintenance Implementation 1 1/13/97 Regional Initiative -

[ MAINTENANCE - MNT] Emphasize Electrical Maint.

IP 81700 Security Program for Reactors 1 1/21/97 Core Inspection

[ PLANT SUPPORT - SI]

IP 37550 Core Physics / Engineering 1 2/10/97

[ ENGINEERING - ENG] ---------- ----------

Inspect installation of new 4 3/24- power range nuclear inst.

4/4/97 PA 112JA Initial Operator Exams 3 3/3/97 Standard initial exam prep.

3 3/17/97 Standard initial exams given.

IP 73753 In-Service inspection 1 3/24/97 Core Inspection - perform

[ MAINTENANCE - MNT] during outage.

IP 83750 Occupational Exposure 1 1/13/97 Core Inspection

[ PLANT SUPPORT - SI]

_-___ --__ -_ _. _ __ _ _ - _ - - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ - .. _-- ._ . ..