P November 6, 1996 MEMORANDUM T0:

David B. Matthews, Chief Generic Issues and Environmental Projects Branch Division of Reactor Program Management i

Office of Nuclear Reactor Regulation FROM:

Egan Y. Wang, Reactor System Engineer Original Signed By:

Generic Issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation

SUBJECT:

MEETING

SUMMARY

OF NOVEMBER 4, 1996, REGARDING THE

" REALISTIC LOCA ECCS EVALUATION MODEL FOR PWR LARGE BREAK LOCA ANALYSIS" On November 4, 1996, representatives of Siemens Power Corporation (SPC) met with representatives of the Nuclear Regulatory Commission (NRC).

The purpose of this meeting was to provide an opportunity for SPC representatives to review and discuss the " Realistic LOCA ECCS Evaluation Model For PWR Large Break LOCA Analysis" code issues. SPC representatives provided an i

introduction and a brief description on current activities with regard to the i

codes. Most of the meeting involved presentation of proprietary information.

l provides a list of meeting attendees. Attachment 2 is the non-proprietary version of the presentation material.

l Attachments: As stated cc w/att:

See next page l

Q"2, I DISTRIBUTION:

g See attached page yp). (g f nfAh&j l

Document name: 961104MT. SUM

//

//

OFC PGEB ( (3 SC:PGERM/Is~ C:PGEB4(/d///Y NAME EWang:sw FAkstuNwicz DMattNews//f Y h b~h M DATE 11/04/96 11/[/96 11/6/96 0FFICIAL RECORD COPY l

NRC FR.E CENTER COPY 9611150161 961106 PDR TOPRP EMVEXXN l

C PDR

i e

s.

DISTRIBUTION: Mtg. Sunnary of November 4 Meeting with Siemens Power Corporation Dated November 6,1995 HARD COPY Central. File.

Public PGEB r/f R. Cooper, RI E. Merschoff, RII W. Alexion, RIII J. Dyer, RIV l

E. Wang l

OGC ACRS E-MAIL F. Miraglia l

A. Thadani R. Zinnerman T. Martin E. Jordan D. Matthews F. Akstulewicz T. Collins K. Kavanagh H. Richines l

l 1

4 1

l 15002 f

I

1 UNITED STATES NUCLEAR REGULATORY COMMISSION f

WASHINGTON, D.C. 20066-0001 l

p

November 6, 1996 MEMORANDUM TO:

David B. Matthews, Chief Generic Issues and Environmental Projects Branch l

Division of Reactor Program Management Office of Nuclear Reactor Regulation FROM:

Egan Y. Wang, Reactor System Engineer Generic Issues and Environmental M

7 Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation l

l

SUBJECT:

MEETING SUMARY OF NOVEMBER 4,1996 REGARDING THE

" REALISTIC LOCA ECCS EVALUATION MODEL FOR PWR LARGE BREAK I

LOCA ANALYSIS" l

On November 4, 1996, representatives of Siemens Power Corporation (SPC) met with representatives of the Nuclear Regulatory Commission (NRC). The purpose of this meeting was to provide an opportunity for SPC representatives to l

review and discuss the " Realistic LOCA ECCS Evaluation Model For PWR Large Break LOCA Analysis" c A issues.

SPC representatives provided an introduction and a brief aescription on current activities with regard to the codes. Most of the meeting involved presentation of proprietary information. provides a list of meeting attendees. Attachment 2 is the non-i proprietary version of the presentation material.

Attachments: As stated cc w/att: see next page

cc:

Mr. H. D. Curet, Manager Product Licensing Siemens Power Corporation l

2101 Horn Rapids Road P. O. Box 130 Richland, WA 99352-0130 l

l t

l l

I l

l l

l l

1

l NRC/SIEMENS POWER CORPORATION MEETING ON MIXED OXIDE FUEL LIST OF ATTDGEES Oct 23, 1996 l

i l

M8ME ORGANIZATION l

Burns, J. P.

WPPSS Heiks, R. L.

Siemens Garner, N. L.

Siemens Garber, D. E.

Siemens Copeland, R.

Siemens l

Collins, T. E.

NRC/NRR Kavanagh, K.

NRC/NRR Richines, H.

NRC/NRR l

Wang, Egan NRC/NRR l

l l

l l

l l

i 1

ATTACHNENT 1

SIEMENS Overview of Realistic PWR Large Break LOCA Methodology and NRC Review Statu i

l Presented by:

H. D. Curet and S. E. Jensen l

[

Siemens Power Corporation - Nuclear Division f

t s

i I

i

[

um 6

'POC/SEJl

.i SIEMENS i

introduction l

i h

. Purpose - Overview of submitted methodology and supporting documentation l

l i

. Objective - Demonstrate sufficient methodology documentation to justify reinitiating the review i

i I

f

SIEMENS Key Events t

RODEX3, April 1991 submittal approved in February 1996 Realistic PWR LBLOCA Code and Methodology submitted October 1992 and December 1992, respectively Westinghouse "BE Model" submitted August 1992 SPC Uncertainties Analyses submitted July 1993 ITS discontinued review of SPC Methodology in September 1994 SPC anticipated NRR and contractor to reinitiate review in June 1996 l

t Westinghouse "BE Model" approved June 1996 i

Received copy of ITS close out report September 1996 Lessons learned from Westinghouse review August 1992 to June 1996 to be i

applied to future "BE Model" reviews l

l Meeting with NRR on November 1996 to discuss lessons learned to be applied to SPC Realistic Model t

I (HDCSEJB I

i.

SIEMENS

Background

prescribed conservative models

. Uncertainties in realistic evaluation models to be quantified High probability that 10 CFR 50.46 criteria are not exceeded including uncertainties j

  • Basis for rule change is extensive research performed after 1975 rule as documented in " Compendium of ECCS Research" i

estimate LOCA analysis i

  • NRC developed code scaling, applicability, and uncertdinty (CSAU) evaluation methodology i

SIEMENS i

Status of Realistic LOCA Submittal Realistic LOCA submittal consists of 14 topical reports which have been submitted for NRC review as follows:

t

. ANF-90-145(P), Vols.1 &2, RODEX3 Fuel Rod Model, submitted April 1991 l

. EMF-92-139(P), Vol. 3, Assessments, submitted September 1992 EMF-92-139(P), Vol. 2, S-RELAP5 Code, submitted October 1992

. EMF-92-139(P), Vol.1, Methodology Description, submitted December 1992

. EMF-92-139(P), Vol. 3, Supplements 1-7, Assessment Calculation, submitted l

July 1993

. EMF-92-139(P), Vol. 4, Uncertainties, submitted July 1993

. EMF-92-139(P), Vol. 5, 4-Loop PWR Uncertainties, Submitted September 1995 Final planned methodology report submitted July 1993 occ o

SIEMENS General Methodology l

Select codes based on capabilities Specify LBLOCA scenario, identify, and rank phenomena (PIRT)

Establish assessment matrix i

Define system and experiment nodalization Perform assessments, determine accuracy and bias, and effects of scale Perform NPP calculation Determine uncertainty and biases Total uncertainty to calculate LBLOCA scenario in specific NPP b

tirse

SIEMENS Codes for Realistic LOCA

  • RODEX3 - Fuel rod thermal mechanical response
  • S-RELAP5 - System thermal hydraulic response (steady & transient) l
  • ICECON - Containment backpressure
  • GSUAM - Generic statistical uncertainties analysis methodology M

SIEMENS i

Benchmarks Demonstrates Realistic LOCA analysis capability of S-RELAP5 against experiments of varying scale r

-[

i 1

-[

]

I

]

l 1

t l

1

[

i 1

-[

]

l 1

  1. EISEJO

SIEMENS Benchmarks (cont'd?

l

. SPC assessments of S-RELAP5 against integral test experiments:

[

]

[

]

[

]

[

]

[

]

[

]

1 Assessments selected to encompass entire range of LBLOCA blowdown, refill, and reflood phenomena from facilities of varying scale Example calculations of Westinghouse 3-loop and 4-loop PWRs are provided i

s tres eeUC!SE.A t

SIEMENS Uncertainties Methodology Methodology:

[

]

l 1

l 1

- i 1

[

1

-[

1 I

l

SIEMENS Uncertainties Methodology Parameters treated deterministically i

l 1

-[

]

-[

]

l

-[

]

-[

]

-[

]

f um

SIEMENS i

Uncertainties Methodology

~

Parameters included in experimental design

[

]

-[

]

-[

]

l

}

-[

]

i

-[

]

[

]

i

[

fMDCSEJB l

SIEMENS Uncertainties Methodology l

1

[

]

[

]

-[

]

[

]

j

[

1 i

r i

t tiss fMDC/ SEA

SIEMENS Uncertainties Methodology Additional uncertainties Plant uncertainties l

1 l

1 l

1 l

1

-l 1

l 1

l 1

-[

]

-[

]

-[

1

SIEMENS Uncertainties Methodology Uncertainties combined using GSUAM ([

] trials) i Monte Carlo PCT Calculation Results 3-Loop Westinghouse PWR

[

l l

i

]

11196 POCSEJB

SIEMENS Uncertainties Methodology l

L Uncertainties combined using GSUAM ([

] trials) i t

Monte Carlo PCT Calculation Results 4-Loop Westinghouse PWR I

1 t

l l

t 1

i 1

[

fHDCISER

O SIEMENS Summary and Conclusions SPC developed Realistic PWR LBLOCA evaluation model following CSAU stepwise approach I

]

Code applicability and scaling effects evaluated by numerous assessments against experimental data l

Methodology uncertainties were identified, quantified, and combined using GSUAM

[

1 l

[

1 Methodology submitted to NRC for review j

fHDC15EM

SIEMENS Summary SPC submitted PWR Realistic LBLOCA Methodology to update technology

[

]

t 1

[

]

[

}

[

1

[

]

[

]

-