Forwards Insp Repts 50-295/96-17 & 50-304/96-17 on 961012- 1206 & Notice of Violation
ML20134H064
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 02/03/1997
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mueller J
COMMONWEALTH EDISON CO.
Shared Package
ML20134H066 List:
References
NUDOCS 9702110138
Download: ML20134H064 (3)


See also: IR 05000295/1996017

Text

_ .

.

_ _ _ . _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _Pasac- _ _ _ _ _l

i

g - 0l

!, February 3, 1997 j

, i

i

i

! Mr. J. H. Mueller i'

Site Vice President

i- Zion Station

Commonwealth Edison Company i
- 101 Shiloh Boulevard  !

Zion, IL 60099  ;

'

i

4

SUBJECT: NRC INSPECTION REPORT 50-295/96-17, 50-304/96-17 AND  !

'

} NOTICE OF VIOLATION

Dear Mr. Mueller:

On December 6,1996, the NRC completed an inspection at your Zion 1 and 2:

reactor facilities. The enclosed report presents the results of that

inspection.

During this eight-week inspection period, your staff's performance was

characterized by recurrent events caused by personnel errors, lack of a

questioning attitude, the failure to follow procedures, and. inadequate

procedures. Of particular concern was the identification by NRC inspectors of

several safety-related component material condition deficiencies. In several i

instances, your staff did not evaluate the impact of the degraded conditions

on equipment operability in a timely manner. The material condition problems

also reflected poor attention to detail during post-maintenance restoration

activities and system engineering walkdowns.

(

We are also concerned about five violations of NRC requirements that were

identified. The first violation involves a failure to follow site procedures

governing the control of out-of-service equipment. The second violation

pertains to the failure to perform Technical Specification-required actions-

for an inoperable emergency diesel generator. The third violation relates to

inadequate corrective actions for your staff's failure to ensure o)erability

of a safety-related battery exhaust ventilation system. The fourti violation

involves six examples of the failure to follow procedures. The fifth

violation involves three examples of inadequate maintenance procedures.

These violations are cited in the enclosed Notice of Violation, and the

circumstances surrounding the violations are described in detail in the

enclosed re) ort. Although your staff identified the violation pertaining to

the inoperaale emergency diesel generator, some examples of the failure to

follow procedures, and examples of inadequate procedures, these licensee

identified issues are included in the cited violations because they stem from

previously identified performance problems which your staff has not yet

effectively addressed.

Please note that you are required to respond to this letter and should follow

the instructions specified in the enclosed Notice when preparing your

9702110138 970203

DR ADOcK0500g5 3 \

- ._. _

_ _ - - . -- ._.

- -. -_

!

1 .

J. H. Mueller -2-

e

l response. The NRC will use your response, in part, to determine whether I

further enforcement action is necessary to ensure compliance with regulatory

requirements. In accordance with 10 CFR 2.790 of the NRC's " Rules of

l

'

Practice." a copy of this letter, its enclosure, and your response will be

placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely, l

l

l /s/ J. A. Grobe for

J. L. Caldwell. Director

Division of Reactor Projects

l Docket Nos. 50-295: 50-304

i License Nos. DPR-39 DPR-48

l Enclosures: 1) Notice of Violation

2) Inspection Report

l No. 50-295/96-17: 50-304/96-17

l

l

,

I

l

l

l DOCUMENT NAME: R:\INSPRPTS\ POWERS \ ZION \ZIO96017.DRP

To receive a copy of this document. indicate in the box "C" = Copy without attach / encl T = Copy with attach / encl "N" =

No copy

0FFICE RIII 6 RIII [ RIII,,rh

NAME Hills /co D d Dapas///M Ca[dhk

DATE 2/3/97 2/_L/97 2/ 3/97

0FFICIAL RECORD COPY

r

l

. _ . .__ - .. _ . - - - .-

.

. .

'

J. H. Mueller -3-

0

<

cc w/ encl: T. J. Maiman, Senior Vice President l

Nuclear Operations Division '

D. A. Sager, Vice President,

Generation Support

, H. W. Keiser, Chief Nuclear

Operating Officer

G. K. Schwartz, Station Manager

4

W. Stone Regulatory Assurance

4

Supervisor

I. Johnson, Acting Nuclear  ;

,

Regulatory Services Manager l

' Richard Hubbard  !

Nathan Schloss Economist  !

Office of the Attorney General

! Mayor, City of Zion '

State Liaison Officer, Wisconsin

J

State Liaison Officer

Chairman, Illinois Commerce

.

!

Commission

Document Control Desk-Licensing

,

! Distribution:

4

Docket File w/ encl Project Manager. NRR w/ enc 1

PUBLIC IE-01 w/ enc 1 DRP w/ encl

-

OC/LFDCB w/ encl RIII PRR w/ enc 1

SRI Byron, Braidwood, CAA1 w/ encl (E-mail)

Zion w/ encl W. L. Axelson, w/ encl

A. B. Beach, w/ encl RAC1 (E-Mail)

H. B. Clayton, w/ encl