NSD-NRC-97-4969, Forwards non-proprietary Rev 0 to Final Rept WCAP-14777, Wcobra/Trac Osu Long-Term Cooling Final Validation Rept

From kanterella
(Redirected from ML20134G993)
Jump to navigation Jump to search
Forwards non-proprietary Rev 0 to Final Rept WCAP-14777, Wcobra/Trac Osu Long-Term Cooling Final Validation Rept
ML20134G993
Person / Time
Site: 05200003
Issue date: 01/31/1997
From: Mcintyre B
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Quay T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20134G996 List:
References
NSD-NRC-97-4969, NUDOCS 9702110111
Download: ML20134G993 (1)


Text

b\

(~)

V l

Westinghouse Energy Systems Ba 355 Pmsburgh Pennsylvania 15230 0355 Electric Corpolation l

NSD-NRC-97-4969' DCP/NRC0725 Docket No.: STN-52-003 l

January 31,1997 -

1 Document Control Desk U. S. Nuclear Regulatory Conunission Washington, DC 20555 TO: T.R. QUAY

SUBJECT:

AP600 TOPICAL REPORT, NON-PROPRIETARY COPIES

REFERENCES:

1. WESTINGHOUSE LETTER NSD-NRC-96-4877, "WCOBRA/ TRAC OSU LONG TERM COOLING FINAL VALIDATION REPORT, WCAP-14776",

DATED NOVEMBER 6,1996

Dear Mr. Quay:

Enclosed is a Westinghouse topical report addressing aspects of the AP600 Design Certification Application. The report is a non-proprietary version of a report previously transmitted to the NRC via the reference letter. Enclosed is:

1. WCAP-14777, "WCOBRA/ TRAC OSU Long-Term Cooling Final Validation Report.

Please contact Cindy P ig on (412) 374-4277 if you have any questions concerning this transmittal, b

l7pyl B. A. McIntyre, Manager ..

Advanced Plant Safety and Licensing  ;

/jml enclosure g l

cc: T. Kenyon, NRC (w/o enclosure)

B. Iluffman, NRC N. J. Liparuto, Westinghouse (w/o enclosure) 9702110111 970131

  • PDR ADOCK 05200003 ~

A PDR ,

N.. j