ML20134G821
| ML20134G821 | |
| Person / Time | |
|---|---|
| Site: | 05200003 |
| Issue date: | 11/07/1996 |
| From: | Diane Jackson NRC (Affiliation Not Assigned) |
| To: | Quay T NRC (Affiliation Not Assigned) |
| References | |
| NUDOCS 9611130376 | |
| Download: ML20134G821 (5) | |
Text
-
November 7, 1996 MEMORANDUM T0: Theodore R. Quay, Director Standardization Project Directorate Division of Reactor Program Management, NRR FROM:
Diane T. Jackson, Project Manager original signed by:
Standardization Project Directorate Division of Reactor Program Management, NRR
SUBJECT:
NOTICE OF MEETING WITH WESTINGHOUSE TO DISCUSS LEAK-BEFORE-BREAK (LBB) ANALYSIS AND OTHER ITEMS FOR THE AP600 REACTOR DESIGN DATE AND TIME:
December 4 through 6, 1996 - 8 a.m. - 5 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Rockville, Maryland 20852 T-10 C2 and Al PURPOSE:
The purpose of this meeting is to discuss the Westinghouse AP600 LBB and high energy line break analyses and other items in the Civil Engineering and Geosciences Branch review areas.
A draft agenda is attached.
PARTICIPANTS *:
NRG Westinahouse G. Bagchi E. Johnson S. Hou D. Bhowmick J. Brammer D. Lindgren D. Jackson P. Strauch, et al.
P. Chen (Consultant), et al.
Docket No.52-003
Attachment:
As stated cc w/ attachment:
See next page
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to the " Commission Policy Statement on Staff Meetings Open to the Public," 59 Federal Reaister 48344, 9/20/94.
- However, portions of this staff meeting may be closed to protect Westinghouse propri-etary information. Members of the public who wish to attend should contact m
Diane Jackson (NRC) at (301) 415-8548, or Don Lindgren (Westinghouse) at yV (412) 374-4856.
j DISTRIBUTION:
See next page
}
I 9611130376 961107 PDR ADOCK 05200003 l
A PDR DOCUMENT NAME: A:ECG12 4.N0T (9J AP600 DISK)
Ta seceive a copy of this document,ineceTe in the bes: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy 0FFICE PM:PDST:DRPM D:PDST:DRPM l
NAME DTJackson TRQuay -rno DATE 11/6/96 11/ g/96 0FFICIAL RECORD COPY
Westinghouse Electric Corporation Docket No.52-003 cc: Mr. Nicholas J. Liparulo, Manager Mr. Frank A. Ross Nuclear Safety and Regulatory Analysis U.S. Department of Energy, NE-42 i
Nuclear and Advanced Technology Division Office of LWR Safety and Technology Westinghouse Electric Corporation 19901 Germantown Road P.O. Box 355 Germantown, MD 20874 Pittsburgh, PA 15230 Mr. Ronald Simard, Director Mr. B. A. McIntyre Advanced Reactor Program Advanced Plent Safety & Licensing Nuclear Energy Institute Westinghouse Electric Corporation 1776 Eye Street, N.W.
Energy Systems Business Unit Suite 300 Box 355 Washington, DC 20006-3706 Pittsburgh, PA 15230 Ms. Lynn Connor l
Mr. John C. Butler Doc-Search Associates i
Advanced Plant Safety & Licensing Post Office Box 34 i
Westinghouse Electric Corporation Cabin John, MD 20818 Energy Systems Business Unit Box 355 Mr. James E. Quinn, Projects Manager Pittsburgh, PA 15230 LMR and SBWR Programs GE Nuclear Energy Mr. M. D. Beaumont 175 Curtner Avenue, M/C 165 Nuclear and Advanced Technology Division San Jose, CA 95125 Westinghouse Electric Corporation 1
One Montrose Metro Mr. Robert H. Buchholz 11921 Rockville Pike GE Nuclear Energy Suite 350 175 Curtner Avenue, MC-781 1
Rockville, MD 20852 San Jose, CA 95125 Mr. Sterling Franks Barton Z. Cowan, Esq.
U.S. Department of Energy Eckert Seamans Cherin & Mellott NE-50 600 Grant Street 42nd Floor 19901 Germantown Road Pittsburgh, PA 15219 Germantown, MD 20874 Mr. Ed Rodwell, Manager Mr. S. M. Modro PWR Design Certification l
Nuclear Systems Analysis Technologies Electric Power Research Institute l
Lockheed Idaho Technologies Company 3412 Hillview Avenue l
Post Office Box 1625 Palo Alto, CA 94303 Idaho' Falls, ID 83415 Mr. Charles Thompson, Nuclear Engineer AP600 Certification NE-50 19901 Germantown Road Germantown, MD 20874 i
)
i
e 6
l AP600 DESIGN REVIEW NEETING AGENDA l
LEAK-BEFORE-BREAK /HIGH-ENERGY-LINE-BREAK / PIPING DECEMBER 4 THROUGH 6, 1996 ROCKVILLE, MARYLAND l
December 4 Room T-10 Al i
l I.
Introduction 8:00 - 8:30 II.
Leak-before-break (LBB) e Feedwater LBB applicability 8:30 - 10:00 l
l Direct vessel injection A/B (Accumulator lines) 10:15 - 10:45 e
- Code Class and inspection requirements e Show how bounding curves meet LBB criteria 10:45 - 12:00 o Verification of LBB computer codes 1:00 - 2:30 e Resolution of remaining LBB open items 2:30 - 5:00 December 5 (BNL review of Westinghouse calculations on Room T-10 C2 i
thermal cycling and thermal stratification) 8:00 - 5:00 II.
Leak-before-break (Continue)
Room T-10 C4 l
e Review LBB Calculations 8:00 - 12:00 Main Steam A 1:00 - 2:30 i
Main Feedwater A l
Surgeline
- PRHR Supply
- CMT-B Pressurizer Spray III.
Resolution of high-energy-line-break open items 2:30 - 5:00 i
Attachment
o
, 4 1
4 December 6 (ETEC to complete review of Westinghouse LBB Room T-10 C2 calculations)
IV.
Piping Design Room T-10 Al 8:00 - 10:00
- Functional capability limits l
- OITS# 832.5.b-d, 838, and 847 e Thermal cycling and stratification OITS# 836 and 837 j
e Resolution of open items in piping design V.
Other mechanical topics 10:15 - 12:00 e CRDM seismic qualification (0ITS# 785) l e Fuel assembly damping value e Resolution of mechanical open items in SSAR 3.2, 3.9 and 3.10 VI.
Overview of open item resolution
- in mechanical areas (SSAR 3.0) 1:00 - 2:00 VII.
Summary and Conclusions 2:00 - 3:00
e
)ISTRIBUTION: Memorandum'to Theodore R. Quay. Dated: November 7. 1946
!!)ocket;Filey PUBLIC PDST R/F FMiraglia/AThadani, 0-12 G18 RPZimmerman, 0-12 G18 BSheron, 0-12 G18 TMartin DMatthews TJKenyon DTJackson WCHuffman JMSebrosky l
WDean, 0-17 G21 l
JMoore, 0-15 B18 l
EJordan, T-4 D18 ACRS (11)
GBagchi, 0-7 HIS Shou, 0-7 HIS l
JBrammer, 0-7 HIS 1
PMNS (e-mail)
OPA (e-mail) l l
l l
t t
I
.