ML20134G523

From kanterella
Jump to navigation Jump to search
Forwards LER 96-013-00.Reactor Recirculation Pump Motor Power Instrument Loop Will Be Added to Configuration Mgt Sys & Associated Calibr Instruction Will Be Revised
Date released: 05/27/2020 Download: ML20134G523


:on 961004,determined Nonconservative Bias Existed for Calculating Core Thermal Power Due to Reactor Recirculation Pump Power Computer Point Scaling Error. Discrepancy Corrected
ML20134G537
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/04/1996
From: Peterson N
DETROIT EDISON CO.
To:
References
Download: ML20134G537 (4)
Forwards LER 96-013-00.Reactor Recirculation Pump Motor Power Instrument Loop Will Be Added to Configuration Mgt Sys & Associated Calibr Instruction Will Be Revised
ML20134G520
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/04/1996
From: Gipson D
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-96-0093, CON-NRC-96-93
Download: ML20134G520 (2)