ML20134G442

From kanterella
Jump to navigation Jump to search
Forwards Draft ORNL/NOAC-228, Review of Operating Experience History Through 1984 of Millstone 1 for NRC Integrated Safety Assessment Program, for Review for Factual Correctness.Comments Requested by 850913
ML20134G442
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/19/1985
From: Charemagne Grimes
Office of Nuclear Reactor Regulation
To: Kacich R
NORTHEAST UTILITIES
Shared Package
ML20134G445 List:
References
NUDOCS 8508260256
Download: ML20134G442 (1)


Text

.__

t.

A7M August 19, 1985 Docket No.: 50-245 Mr. Richard Kacich Northeast Utilities Post Office Box 270 Hartford, Connecticut 06141

Dear Mr. Kacich:

SUBJECT:

MILLSTONE 1 - ISAP REVIEW 0F OPERATING EXPERIENCE Enclosed is a draft report, prepared by NRC contractors, on operating experience of Millstone Unit 1.

You are requested to review this report for factual correctness; comments are requested by September 13, 1985.

Please provide a copy of your response directly to Mr. A. Kimins, NOAC, Building 9201-3, Mail Stop 5, Post Office Box Y, Oak Ridge, Tennessee 37831.

Sincerely, ORIGINAL SIGNED BY E. 11CKENNA FOR C. GRIMES I

Christopher Grimes, Chief Systematic Evaluation Program Branch Division of Licensing 4

Enclosure:

As stated cc w/ enclosure: See next page DISTRIBUTION

" Docket;Filey NRC PDR LPDR ORB #5 Reading HThompson OELD EJordan CGrimes JPartlow Project Manager l

Licensing Assistant ACRS (10)

SEPB: h M SEPB:Df)UM EMcKenna:mn CGrimes % '

8//7/85 8/17 /85 egge2ggggg$$8s 3

P

-