NPDES Noncompliance Notification:On 970108,util Informed NRC That PA Dept of Environ Protection Granted Approval for Temporary Discharge at Lgs,Per 961219
ML20134G324
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 01/31/1997
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9702100365
Download: ML20134G324 (4)


Text

. -

1 Etation Eupport Depsrtment

^

EPP 3.2 v

PECO NUCLEAR mco m c-e, A Unit of PECO Energy wa N P$ N N

  • January 31,1997 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 NPDES Permit No. PA0051926 1

l U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Limerick Generating Station, Units 1 and 2 National Pollutant Discharge Elimination System Permit Revision to Waste Water Temporary Discharge Approval j

Gentlemen:

j By letter dated January 8,1997, PECO Energy informed the NRC that the Pennsylvania Department of Environmental Protection (PA DEP) granted its approval for a Temporary Discharge at Limerick Generating Station (LGS) as documented in a letter dated December 19, 1996. This Temporary Discharge involved releasing waste water from the LGS holding pond, which contained approximately 100 gallons of raw sewage, to the Schuylkill River. This Temporary Discharge is not considered a change / revision to the approved LGS National Pollutant Discharge Elimination System (NPDES) Permit No. PA0051926.

The PA DEP subsequently amended one of the conditions associated with the approval for this Temporary Discharge as documented in a letter dated January 8,1997. Specifically, the allowable fecal coliform limit was revised from 200/100ml as a geometric mean to 2000/100ml as a geometric mean, while the other conditions of the approval remained unchanged.

The LGS, Units 1 and 2, Environmental Protection Plan (EPP) Section 3.2, stipulates that the NRC shall be notified within 30 days following the date of approval of a change to the LGS NPDES permit. Although this Temporary Discharge does not constitute a change / revision to the LGS NPDES permit, PECO Energy considers it appropriate to provide this notification in accordance with the requirements of Section 3.2 of the LGS, Units 1 and 2, EPP. A copy of the January 8,1997, PA DEP letter approving the Temporary Discharge amendment is attached.

9702100365 970131 PDR ADDCK 05000352 S

PDR

l January 31,1997 Page 2 If you have any questions or require additional information, please do not hesitate to contact us.

I Very truly yours,

/td

,b.

G. A. Hunger, Jr.

Director - Licensing Attachment i

cc:

H. J. Mller, Administrator, Region I, USNRC (w/ attachment)

N. S. Perry, USNRC Senior Resident inspector, LGS (w/ attachment) s b

e l

l l

l l

a

j Pennsylvania Department of Environmental Protection Lee Park, Suite 6010 555 North Lane Conshohocken, PA 19428 January 8,1997 l

Southeast Regional Office 610-832-6130 Fax 63.0-832 6133 Mr. Robert M. Matty, Jr.

4 Engineer, Environmental Affairs PECO Energy Company 2301 Market Street P.O. Box 8699 Philadelphia, PA 19101-8699 Re:

WQ -IW Correspondence PECO Energy Company J

Limerick Generating Station NPDES PA0051926

. Limerick Township Montgomery County

Dear Mr. Matty:

This is in reference to our December 19,1996 letter which approved a temporary discharge from 4

the holding pond through Monitoring Point 201 and ultimately to the Schuylkill River via Outfall 001 at PECO's Limerick Generating Station.

Condition No. 2 of the above referenced approval letter should be revised as follows:

2.

Monitoring Point 201 shall be sampled at the start of the temporary discharge and at 2-hour intervals during the duration of the temporary discharge and analyzed for fecal coliforms using EPA approved test methods. These sample results shall not be greater than 2,000/100 ml of fecal coliform organisms as a geometric mean value based on all sample results obtained during the duration of the temporary discharge.

All other conditions specified in the above referenced approval letter remain applicable.

_ - = -.. -.... - -. _ - -,

{

Mr. Robert M. Matty, Jr.

2-January 8,1997 i,

If you have any questions, please contact Mr. Steve O'Neil of the Operations Section or myself.

Sincerely, i

AEa.s Joseph A. Feola Regional Manager Water Management cc:

Mr. O'Neil Mr. Maneval Limerick Township Re 30 (SMC)8-1 i

j

.:6 2

e ll f

m

-