February 3, 1997 EA 96-542 EA 97-047 Mr. Lew W. Myers Vice President - Nuclear Centerior Service Company er y, 4d8
]
Subject:
POSTPONEMENT OF PRE-DECISIONAL ENFORCEMENT CONFERENCE REFERENCE CORRESPONDENCE FROM J. M. JACOBSON, NRC RIII TO L. W. MYERS, DATED JANUARY 28, 1997
Dear Mr. Myers:
This letter confirms the February 3.1997, discussion between Mr. J. A. Grobe
'of NRC RIII with Mr. J. P. Stetz and Mr. R. D. Brandt of Centerior Service Company regarding the pre-decisional enforcement conference scheduled for February 5, 1997. That pre-decisional enforcement conference was originally scheduled to discuss the apparent violations involving Technical Specification LCO action requirements which were exceeded (NRC Inspection Report No.
50-440/96017).
During the telephone conversation we agreed to integrate this conference with one for the failure of corrective actions to prevent an inadvertent reactivity addition (NRC Inspection Report No. 50-440/96018), and if necessary, one for Appendix R hot short issues (NRC Inspection Report No 50-440/96017). We will reschedule a conference in the near future.
]
We appreciate your cooperation in this matter.
If you have any questions regarding the rescheduling, please contact me at 630/829-9736.
i Sincerely,
/s/ E. Schweibinz for John M. Jacobson, Chief Reactor Projects Branch 4
)
I( 0 Docket No. 50-440 Docket No. 50-441 rueive a copy of this doctment. indicate in the box "C" = Copy without attach / enc 1 "E" = Copy with attach / encl "N" =
0FFICE RIII E
NAME Jacobson A
DATE 2/T/97 0FFICIAL RECORD COPY 9702100295.970203 PDR ADOCK 05000440 g
PDR w
8 Lew W. Myers.
cc:
J. P. Stetz, Senior Vice President - Nuclear L. W. Worley, Director, Nuclear Services Department H. L. Hegrat, Manager.
Regulatory Affairs W. R. Kanda Director, Perry Nuclear Assurance Department J. J. Powers Director, Perry Nuclear Engineering Dept.
H. Ray Caldwell, General Superintendent Nuclear Operations R. D. Brandt, General Manager Operations Terry J. Lodge, Esq.
State Liaison Officer. State of Ohio Robert E. Owen, Ohio Department of Health C. A. Glazer, State of Ohio, Public Utilities Commission Distribution:
Docket File SRI Perry PUBLIC 4t:Dt DRP OC/LFDCB RIII PRR Project Manager, NRR CAA1 (E-mail)
A. B. Beach, RIII Enf Coordinator W. L. Axelson DRS (3)
TSS w
i