ML20134F892

From kanterella
Jump to navigation Jump to search
Mod 3,providing Funding for CY85 & Changing Appropriation Number,To Radiation Monitoring Program Requirements
ML20134F892
Person / Time
Issue date: 07/24/1985
From: Edgeworth P, Maclean R
NRC OFFICE OF ADMINISTRATION (ADM), TEXAS, STATE OF
To:
Shared Package
ML20134F890 List:
References
CON-FIN-B-8504, CON-NRC-31-83-671 NUDOCS 8508210305
Download: ML20134F892 (2)


Text

s c oN i At. t e b r oET.

TAGL or e r.c Ls 1

e j

M/.ENDl?.ENT OF SOLICITATION / MODIFICATION OF CONTRACT 1

l 2

a. Authout rug fuCDie iC Ai eon Ns.

3.LeaeCTsvt 041C

e. Rt 0U:5 1 eONfeUR CH AS L R4 c. NO.

S. PHOJL C1 NO. (ff tppliesble) j

/ /7 y/gf RG4-83-671 dtd 11/29/84 3

_s. s>5Ut O my

/

/

7. ADuiNiSTtRco By (fjother than se, es CODE!

U. S. Nuclear Regulatory Comission Division of Contracts Washington, DC 20555

e. N AME AND ADD R ESS OF CON T R AC10 R (No.. ettert. coun ty, State and 2JP Code) g 9A. AMENDMENT OF SOLtCIT AT TON NO.

Texas Department of Health 1100 West 49th Street

,B. DATED,5EEsrshi n)

Austin, TX 78756 2 0A MODIF sC ATION OF CONT R AC1f0R DE,jt NO.

X NRC-31-83-671 J oe. DAT LO (SEE ITEht 23)

CODE lF ACILITY CODE 3/7/83

11. THIS ITEM ONLY APPLIES TO AMENDMENTS.OF SOLICITATIONS The tbove num6eied solicitation is amended as set forth in item 14. The hour and date specified f or racsipt of Offers is extended, is not as-tended.

OfIIrs must acknowledge receipt of this amendtnent prior to the hour and date specified in the solicitation or as amended.by one of the following methods (e) By completing items 8 and 15. and teturning copies of the amendrnent: (b) By acknowledging eaceipt of this anendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. F ALLURE OF YOUR ACKNOWLEDG.

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OF FER. If by virtue of this amendment you desire to change an offer already submitted.such change may be rnade by teleram or t.tter.provided each telegram or letter snakes reference to the solicitation and this amendtnent and is veceived prior to the opening hour and date specified.

3 2. ACCOUNilNG AND APPROPRI AT ION DAT A (if regusred) 94-19-30-20-1 B8504 31X02.00.945 114.900.nn

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTR ACT/ ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS C H ANGE OR DE R 15155UEO PUR$UANT TO: (Specify authority) THE CHANGES SET F OR TH IN IT EM 3 a ARE M ADE IN T HE CCN-g T R ACT OR DE R NO. IN IT EM 3 0A.

2. THE ABOVE NUMBE RED CONT A ACT/ORDE R IS MODIFIED TO REFLECT THE ADMINest R A TIVE CHANGES (such as chor pes in payint offsee, especpriafu>n date. etc.) SET FOR T H IN IT E M 3 4. PURSU AN1 TO THE AUTHORITY OF F' A R 43.103(b).

C.1Ht$ SUPPLt MENTAL AG AL L ME N1 e5 E NT E REO INTO PURSU ANT TO AUTHORITY OF s C

Mutual agreement of the parties 8508210305 8507U U. 01 HLie (Specsly type of unodsfacesson and authorsty) gg NRC-31-83-671 PDR E. IMPORTANT: Contractor O is not.

x is tenuit.o to sion inis oocument ene teiotn 2

Con;e5 1o ine issuin,oitice.

u. OL50RnPi eon Or AMLNoMLNisuOunF eCAt eon torsanued nry ucT aecsson he adense. snetudsns eat *ce na t*onic on scoc s
  • u lu* ct '"* *'*' wh*'c f* **'**' l 1.

In Article V - Consideration and Payment, Paragraph A., Consideration, the following change is made:

Subparagraph 3 is deleted in its entirety and th.e following new Subparagraph 3 is substituted thereof:.

3.

The amount obligated by the Commission in this Modification No. 3 is $14,900.00.

The total amount obligated under this cooperative agreement since its inception is $37,850.00.

Ee a as p.ovided herein, all terms and conditions of the document referenced in item. A or 10A. as heretofore thant,.d. semains unchan oc and in f ull f orce 3 S A. N AML A'vD TIT LL OF SIGNE R (Type or print) 3 6 A. N AME AND T IT LE OF CON 1 R AC11NG Of FICE R (Type or pnnt)

Robert A. MacLean, M.D.

Paul J. Edgeworth

._ _ _ D puty_ Commissioner I S ).

41 G T OR/Of' F F 3 SC. D A1 L SIG N LD 3 6 8. U STATf5 A L RIC A 3 6C. D A TL StGN FD BY nature of n treetont Off.ere)

ILgnature ol person euthorked to sign) j y

N5N 754341152 8070 3o 305 ST AND AHD F ORM 30 IRLv. 30 as)

--- lhnnMQBCG PSL@SC

~

Modification No. 3 Contract No. NRC-31-83-671 Pige 2 of 2 2.

The Appropriation No. 31X0200.944 cited in Block No.10 " Accounting and Appropriation Data" is changed to Appropriation No. 31X0200.945.

3.

In Attachment A, Paragraph II, General Requirements, Subparagraph B, add the following site for TLD monitoring:

" South Texas Project - TLD Monitoring" i

1

_ _. _