| Site: | Davis Besse |
| Issue date: | 10/28/1996 |
| From: | Jeffery Wood CENTERIOR ENERGY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20134F183 | List: |
| References | |
| 2403, NUDOCS 9611050015 | |
| Download: ML20134F180 (2) | |
Text
- -
l*
i i
I i
f CENTEREOR i
ENERGY I
C200 Ook Tree Boulevard Moil Address 1
incependence OH PO Bos94661 216-447 3100 Cleveiana OH 441014661 l
Docket Number 50-346 l
License Number NPF-3 Serial Number 2403 October 28, 1996 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
License Amendment Application to Revise Technical Specifications Regarding A.C. Sources and D.C. Distribution for Conversion to a 24 Month Fuel Cycle I
l Ladies and Gentlemen:
l Enclosed is an appl.lcation for an amendment to the Davis-Besse Nuclear Power Station (DBNPS), Unit Number 1 Operating License Number NPF-3, l-Appendix A, Technical Specifications. The proposed changes involve Technical Specifications: 3/4.8.1.1, Electrical Power Systems - A.C.
Sources - Operating; 3/4.8.1.2, Electrical Power Systems - A.C. Sources -
Shutdown; 3/4.8.2.3, Electrical Power Systems - D.C. Distribution -
Operating; 3/L 8.2.4, Electrical Power Systems - D.C. Distribution -
Shutdown; and Bases 3/4.8, Electrical Power Systems.
The proposed changes would modify the prerently specified 18 month surveillance frequencies in Surveillance Requirements 4.8.1.1.1.b, 4.8.1.1.2.d, and 4.8.2.3.2.c,d and f to a new specified frequency of once each refueling interval. Surveillance Requirement 4.8.2.3.2.e would be modified by deletion of the requirement to perform the surveillance "during shutdown." Surveillance Requirements 4.8.1.2 and 4.8.2.4.2 would also be affected as they reference the aforementioned Surveillance Requirements. These changes are in accordance with the NRC guidance provided by Generic Letter 91-04, " Changes in Technical Specification Surveillance Intervals to Accommodate a 24-Month Fuel Cycle," dated April j
2, 1991, and will support conversion of the DBNPS from an 18 month to a j
24 month fuel cycle.
)
Technical Specification Bases 3/4.8, Electrical Power Systems, is also revised to reflect that the change to 24 month surveillance testing would
[
be an exception to the 18 month testing interval guidance specified in Regulatory Guide 1.129, " Maintenance, Testing and Rndacement of Large l
i Lead Storage Batteries for Nuclear Power Plants," dated February 1978, I
and ISEE Standard 450-1980, "IEEE Recommended Practice for Maintenance, Testiner, and Replacement of Large Lead Storage Batteries for Generating i
Staticas and substations."
961x050015 961028 FOX ADOCK 05000346 P
PDR tfift!!UflflQ (,OT11 pull 8W g g Q Q f) 57
. fNveland Dectne InuminatN.J U V ** f Toledo Edison
Dockst Numb r 50-346 Licanas Number NPF-3 Serial Number 2403 Page 2 The DBNPS is comt.encing longer fuel cycles during the current Cycle 11.
This license amendment application is one of several applications which will be submitted in support of the 24 month fuel cycle conversion.
These applications are being submitted to the NRC as a Cost Beneficial Licensing Action. As will be demonstrated in each license amendment application, the proposed changes will not adversely impact safety. The proposed changes will provide an estimated cost savings of $24 mill!.on over the DBNPS's remaining life.
Toledo Edison requests that this amendment be issued by the NRC by April 30, 1997.
ShouJd you have any questions or require additional information, please contact James L. Freels, Manager - Regulatory Affairs, at (419) 321-8466.
Very truly yours, 1
Jo n K. Wood Vice President - Nuclear Davis-Besse Nuclear Power Station DHL/laj Enclosure i
cc:
A. B. Beach, Regional Administrator, NRC Region III A. G. Hansen, NRC/NRR Project Manager S. Stasek, NRC Region III, DB-1 Senior Resident Inspector J. R. Williams, Chief of Staff, Ohio Emergency Management Agency, State of Ohio (NRC Liaison)
Utility Radiological Safety Board
>