ML20134F055
| ML20134F055 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear, Waterford |
| Issue date: | 02/04/1997 |
| From: | Gaudet T ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| W3F1-97-0009, W3F1-97-9, NUDOCS 9702070243 | |
| Download: ML20134F055 (2) | |
Text
_.
& Entergy gaa~"u"* '" -
Operations
-u=
Tc 50?739M50 J
W3F1-97-0009 A4.05 4
PR February 4,1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Waterford 3 Power Uprate Schedule Change Arkansas Nuclear One Unit 2 Docket No. 50-368 License No. NPF-6 NRC Review of the SBLOCA Evaluation Model Revision i
Gentlemen:
1 The purpose of this letter is to advise the NRC of a change to the schedule for the
)
Waterford 3 Power Uprate (uprate) license amendment submittal. In previous correspondence dated July 16,1996, the NRC was requested to commit resources for the review of the uprate license amendment, which was scheduled to be submitted in April,1997. In light of current Waterford 3 improvement initiativet, which are ongoing as part of the Waterford 3 Focus Plan and conversion to the improved Standard Technical Specifications (NUREG 1432), Entergy management has elected to postpone the uprate one fuel cycle. Therefore, the Waterford 3 license amendment request is now scheduled for October,1998.
The uprate, which is now scheduled to be implemented in April,2000, will be based on an eight percent licensed thermal power increase. In that the parameters and analyses associated with the uprate will not change, the previously discussed level of NRC support is requested, involving a review cycle of 12 months with NRC approval of the uprate in October,1999.
I 1
9702070NG 970204 PDR N'Gc. 05000368 P
PDR g
4 Waterford 3 Power Uprate Schedule Change W3F1-97-0009 Page 2 February 4,1997 Although the uprate implementation schedule has been delayed, there is the need l
to continue with the NRC review of the Evaluation Model Revision for SBLOCA.
This model revision is needed in the short term for ANO Unit 2 and ultimately will be the model used for the uprate SBLOCA analysis.
Should you have any questions regarding this matter, please contact me at 1
(504) 739-6666 or Roy Prados at (504) 739-6632.
Very truly yours, 4
T.J. Gaudet Acting - Director Nuclear Safety & Regulatory Affairs TJG/RWP/ssf cc: