ML20134E581
| ML20134E581 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/24/1996 |
| From: | Mccoy C GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-96-06, GL-96-6, LCV-0897, LCV-897, NUDOCS 9611010210 | |
| Download: ML20134E581 (2) | |
Text
_. -
Georgis Powtr Company 40 invtrness Cantir Parkway Post Office Box 129s Birmingharn, Alabama 35201
, Telephone 205 992-7122 Georgia Power P s dent, Nuclear October 24, 1996 vogtle Pro %ct LCV-0897 Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C, 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLAbrf 30-DAY RESPONSE TO GENERIC LETTER 96-06 On September 30,1996, the Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 96-06, " Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions." The GL requires a 30 day initial response and requests within 120 days a written summary addressing the requested actions and requested information contained in the letter.
The 30 day response requires the following information:
1) whether or not the requested actions will be completed.
i 2) whether or not the requested information will be submitted.
3) whether or not the requested information will be submitted within the requested time period (e.g.120 days).
. Georgia Power Company will provide a written summary describing the actions taken and the requested information by January 28,1997, which is 120 days from the date of GL 96-06.
Sincerely, 0.W C. K. McCoy Sworn to and subscribed before me this A day of do2LLA.
,1996.
h % th d b
' N6tary Public 6
[g ' Ol My Commission Expires: N% 9
/79 7
(
9611010210 961024 PDR ADOCK 05000424 P
. ~.
l...
l L
Georgia 90wer1 l
l l
. U. S. Nuclear Regulatory Commission Page 2 l
CKM/HWM/gmb l
cc: ' fggr.gia Power Company l
Mr. J. B. Beasley,' Jr.
l Mr. M. Sheibani l
NORMS j
U. S. Nuclear Regulatory Commission l
Mr. S. D. Ebneter, Regional Administrator i
Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle 1
State of Georgia Mr. L. C. Barrett, Commissioner, Department of Natural Resources i
l I
I-i LCV-0897 l
--