Informs That Util Will Provide Written Summary Describing Actions Taken by 970128,120 Days from Issuance of GL 96-06
ML20134E581
Person / Time
Site: Vogtle  
Issue date: 10/24/1996
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-96-06, GL-96-6, LCV-0897, LCV-897, NUDOCS 9611010210
Download: ML20134E581 (2)


Text

_. -

Georgis Powtr Company 40 invtrness Cantir Parkway Post Office Box 129s Birmingharn, Alabama 35201

, Telephone 205 992-7122 Georgia Power P s dent, Nuclear October 24, 1996 vogtle Pro %ct LCV-0897 Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C, 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLAbrf 30-DAY RESPONSE TO GENERIC LETTER 96-06 On September 30,1996, the Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 96-06, " Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions." The GL requires a 30 day initial response and requests within 120 days a written summary addressing the requested actions and requested information contained in the letter.

The 30 day response requires the following information:

1) whether or not the requested actions will be completed.

i 2) whether or not the requested information will be submitted.

3) whether or not the requested information will be submitted within the requested time period (e.g.120 days).

. Georgia Power Company will provide a written summary describing the actions taken and the requested information by January 28,1997, which is 120 days from the date of GL 96-06.

Sincerely, 0.W C. K. McCoy Sworn to and subscribed before me this A day of do2LLA.

,1996.

h % th d b

' N6tary Public 6

[g ' Ol My Commission Expires: N% 9

/79 7

(

9611010210 961024 PDR ADOCK 05000424 P

PDR

. ~.

l...

l L

Georgia 90wer1 l

l l

. U. S. Nuclear Regulatory Commission Page 2 l

CKM/HWM/gmb l

cc: ' fggr.gia Power Company l

Mr. J. B. Beasley,' Jr.

l Mr. M. Sheibani l

NORMS j

U. S. Nuclear Regulatory Commission l

Mr. S. D. Ebneter, Regional Administrator i

Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle 1

State of Georgia Mr. L. C. Barrett, Commissioner, Department of Natural Resources i

l I

I-i LCV-0897 l

--