Responds to 961010 Telcon RAI Re Submittal Per 10CFR70.38 Re CaF2 Removal Plan
ML20134E571
Person / Time
Site: 07001113
Issue date: 10/24/1996
From: Reda R
GENERAL ELECTRIC CO.
To: Pierson R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 9611010203
Download: ML20134E571 (2)


Text

-. _.. _. _ _.. _ _ _.. _... _ _ _ _ -. _.

Q 70-///3

-c:

GENuclear Energy Gewatilettnc Comp 3ny k

PO Ba ibn Wimmgton NCZM32 9106755 goo October 24,1996 i

. Mr. R. C. Pierson Mail Stop T 8-D-14 Licensing Branch, NMSS U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 J

l

Dear Mr. Pierson:

CaF Removal Plan

Subject:

2

References:

1) Docket #70-1113, License Number SNM-1097 i
2) Letter, JF Klapproth to RC Pierson, Dated 3/24/95
3) Submittal, JF Klapproth to RC Pierson, Dated 5/4/95 l

i

4) Letter, KK McDaniel to JF Klapproth, Dated 7/6/95
5) Letter, JF Klapproth to KK McDaniel, Dated 9/20/95
6) Letter, RC Pierson to RJ Reda, Dated 1/5/96
7) Letter, KK McDaniel to RJ Reda, Dated 3/20/96
8) Submittal, RJ Reda to RC Pierson, Dated 3/27/96 i
9) Submittal, RJ Reda to RC Pierson, Dated 9/13/96 i

On October 10,1996, Messrs. S. P. Murray and D. W. Brown of GE's Nuclear Energy

[

Production facility conducted a conference call with Mr. M. A. Lamastra of the NRC licensing.

1 branch. The purpose of the call reas to provide additional information relating to GE's September 13,1996 submittal pursuant to 10 CFR 70.38.

j i

Mr. Lamastra had four questions for which he requested further information. Listed below are the questions and our response:

j If GE does not opt for final closure of the central fluoride area at this I

f

1) QUESTION time, when will final closure take place?

f i

t

RESPONSE

GE plans to close this area at the time of plant decommissioning.

~

When will the Calcium Fluoride (CaF > in the central area be removed?

2) QUESTION 2

RESPONSE

- The current schedule is for removal of CaF in the central storage area to 2

begin excavation in the first quarter of 1997, and continue through 1997, l

and into 1998, if needed.

I l

AlFC'/

D

' '9611010203 961024 ADOCK0700g3 PDR C

s Mr. R. C. Pierson October 24,1996 s

. Pagp 2 of 2 3-i 3)

QUESTION What will be the approximate contamination levels in the central area after the CaF has been removed?

2 It is estimated that the average contamination levels in the soils

RESPONSE

immediately adjacent (1-2 feet) to the areas where CaF is to be removed 2

will average <200 pCi/gr.

What are the estimated dose rates before and after the CaF removal?

4) QUESTION 2

RESPONSE

Current readings of the CaF indicate a range of 0.05 - 0.08 mR/hr at a 2

distance of one meter at several locations within the CaF storage area.

2 Around the immediate boundaiy (at approximately five yards from the edge of the CaF storage area), readings are 0.05 mR/hr at a distance of

{

2 one meter.

After CaF removal, dose rates are estimated to be at background for that 2

area; 0.02 - 0.05 mR/hr at a distance of one meter.

Please contact Dave Brown on (910) 675-6745 or me on (910) 675-5889, if you have any -

questions or would like to discuss this ma'ter further.

Sincerely, l

GE NUCLEAR ENERGY R. J. Reda, Manager Fuels and Facility Licensing -

/zb cc: RJR-96-119 I