-. _.. _. _ _.. _ _ _.. _... _ _ _ _ -. _.
Q 70-///3
-c:
GENuclear Energy Gewatilettnc Comp 3ny k
PO Ba ibn Wimmgton NCZM32 9106755 goo October 24,1996 i
. Mr. R. C. Pierson Mail Stop T 8-D-14 Licensing Branch, NMSS U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 J
l
Dear Mr. Pierson:
CaF Removal Plan
Subject:
2
References:
- 1) Docket #70-1113, License Number SNM-1097 i
- 2) Letter, JF Klapproth to RC Pierson, Dated 3/24/95
- 3) Submittal, JF Klapproth to RC Pierson, Dated 5/4/95 l
i
- 4) Letter, KK McDaniel to JF Klapproth, Dated 7/6/95
- 5) Letter, JF Klapproth to KK McDaniel, Dated 9/20/95
- 6) Letter, RC Pierson to RJ Reda, Dated 1/5/96
- 7) Letter, KK McDaniel to RJ Reda, Dated 3/20/96
- 8) Submittal, RJ Reda to RC Pierson, Dated 3/27/96 i
- 9) Submittal, RJ Reda to RC Pierson, Dated 9/13/96 i
On October 10,1996, Messrs. S. P. Murray and D. W. Brown of GE's Nuclear Energy
[
Production facility conducted a conference call with Mr. M. A. Lamastra of the NRC licensing.
1 branch. The purpose of the call reas to provide additional information relating to GE's September 13,1996 submittal pursuant to 10 CFR 70.38.
j i
Mr. Lamastra had four questions for which he requested further information. Listed below are the questions and our response:
j If GE does not opt for final closure of the central fluoride area at this I
f
- 1) QUESTION time, when will final closure take place?
f i
t
RESPONSE
GE plans to close this area at the time of plant decommissioning.
~
When will the Calcium Fluoride (CaF > in the central area be removed?
- 2) QUESTION 2
RESPONSE
- The current schedule is for removal of CaF in the central storage area to 2
begin excavation in the first quarter of 1997, and continue through 1997, l
and into 1998, if needed.
I l
AlFC'/
D
' '9611010203 961024 ADOCK0700g3 PDR C
s Mr. R. C. Pierson October 24,1996 s
. Pagp 2 of 2 3-i 3)
QUESTION What will be the approximate contamination levels in the central area after the CaF has been removed?
2 It is estimated that the average contamination levels in the soils
RESPONSE
immediately adjacent (1-2 feet) to the areas where CaF is to be removed 2
will average <200 pCi/gr.
What are the estimated dose rates before and after the CaF removal?
- 4) QUESTION 2
RESPONSE
Current readings of the CaF indicate a range of 0.05 - 0.08 mR/hr at a 2
distance of one meter at several locations within the CaF storage area.
2 Around the immediate boundaiy (at approximately five yards from the edge of the CaF storage area), readings are 0.05 mR/hr at a distance of
{
2 one meter.
After CaF removal, dose rates are estimated to be at background for that 2
area; 0.02 - 0.05 mR/hr at a distance of one meter.
Please contact Dave Brown on (910) 675-6745 or me on (910) 675-5889, if you have any -
questions or would like to discuss this ma'ter further.
Sincerely, l
GE NUCLEAR ENERGY R. J. Reda, Manager Fuels and Facility Licensing -
/zb cc: RJR-96-119 I