Forwards Revised SALP Rept 50-412/85-99,per Util & 850619 Mgt Meeting.Rev Reflects Updated Info Re Completion Status of Cable Pulling,Scheduling for RCS & Steam Generator Hydrostatic Tests & Engineering Confirmation Program
ML20134E570
Person / Time
Site: Beaver Valley
Issue date: 08/13/1985
From: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Carey J
DUQUESNE LIGHT CO.
Shared Package
ML20134E574 List:
References
NUDOCS 8508200331
Download: ML20134E570 (2)


See also: IR 05000412/1985099

Text

p

.?

.

o

-t

.,

AUG 131985

i

Docket No. 50-412

Duquesne Light Company

ATTN:

Mr. J. J. Carey

Vice President

Nuclear Group

Post Office Box 4

Shippingport, Pennsylvania 15077

Gentlemen:

Subject:

Systematic Assessment of Licensee Performance (SALP) Report No. 50-412/

85-99 and Your Reply Letter 2NRC-5-105 Dated July 19, 1985.

Thank you for your reply to SALP Report 50-412/85-99.

In your letter, you summar-

ized actions taken or planned to address the concerns identified in our letter of

June 7, 1985.

Based on our discussions with you at the June 19, 1985 management meeting, we have

revised the subject SALP Report to update information provided to us at that time

concerning completion status of cable pulling, scheduling for the reactor coolant

system and steam generator hydrostatic tests, and revised scheduling for the "En-

gineering Confirmation Program." This updated information is reflected in the re-

vised SALP Report (Enclosure 1), but does not affect our assessment.

With regard to the current status of construction, we acknowledge the improving

trends in those areas in which weaknesses were identified in the previous SALP Re-

port.

The initiatives that were implemented during this assessment period were

effective, but I feel additional attention is required for problems identified in

the electrical / instrumentation area.

Region I staff has discussed these problems

with you at a site meeting on July 12, 1985, and feels that the remaining electri-

cal / instrumentation tasks have been properly addressed and scheduled for action.

I urge you to provide the necessary management attention to assure that the reso-

lution of these problems in the electrical / instrumentation area is expedited.

Your cooperation with us is appreciated.

Sincerely,

.

OPfitfhal gfgggggy

'

2hemes E. Akrhey

' , '

.

Thomas E. Murley

Regional Administrator

Enclosures:

1.

NRC Systematic Assessment of Licensee Performance (SALP)

Report No. 50-412/85-99, June 7, 1985

2.

NRC Letter, T. E. Murley to J. J. Carey, June 7, 1985

3.

SALP Management Meeting Attendees, June 19, 1985

'

4.

Duquesne Light Company Response Letter, 2NRC-5-105, July 19, 1985

!

'

0*'N$

jYYO

3

t

_ - _ _ _ _ _ _ _ _ _ _ _ _

,'

C

Duquesne Light Company

2

MG 131985

cc w/encis:

E.-J. Woolever, Vice President, Nuclear Construction Division

E. Ewing, Quality Assurance Manager

R. J. Swiderski, Manager, Startup Group

R. E. Martin, Manager, Engineering

E. F. Kurtz, Jr. , Manager, Regulatory Af fairs

P. RaySircar, Stone and Webster Engineering Corporation

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

Chairman Palladino

Commissioner Roberts

,

Commissioner Asselstine

Commissioner Bernthal

Commissioner Zech

bec w/ encl:

Region I Docket Room (with concurrences)

DRP Section Chief

T. Rebelowski, SRI, Millstone 3

SALP Meeting Attendees

K. Abraham (2 copies)

T. Murley, RI

D. Holody, RI

J. Taylor, IE

f(:DRP

/W

/

F

P

RI:DRP

HI:RA

-

ew

Johnson /meo

ipp

Wenzin,ger

a

J lan

TM ley

{q yki

8///185

8/

/85

8/1/85

[

gg,

i

0FFICIAL RECORD COPY

_