Text
,,h*
~.-._
me soere G org.a rm TrearJ re JO t M4 M' Est 33M ct m,4 ' 4 6t 3MO O
A Georgia Power o.orom, C.',,[$C['#
"n vw-eue" vr;<v Proiec' August 9, 1985 United States Nuclear Regulatory Commission File: X7N00.0-18 Of fice of Inspection and Enforcement X7N17.1 Region II - Suite 2900 X7BC35 101 Marietta Street Log: GN-675 Atlanta, Georgia 30303 Attention:
Mr. J. Nelson Grace, Administrator NRC DOCKET NUMBERS 50-424 AND 50-425
' CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTIE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 APPLICATION FOR OPERATING LICENSES AENDENT NUMBER 18
Dear Mr. Grace:
In accordance with 10 CFR Part 50.30 (b), (c) and Part 50.54, we are submitting three (3) signed originals of Amendment 18 to the Alvin W. Vogtle Nuclear Plant FSAR Chapter 17.1.
In addition, we are submitting sixty (60)
O copies to the Document Control Desk in Washington, D.C.
As described in our letter of December 16, 1983 (Log: GN-291) which transmitted Amendment 2, the Quality Assurance Program addressing the design and construction stage is now documented solely in the FSAR.
This amendment describes changes to the Quality Assurance Program during the design and construction phase. As can be seen from the amendment, the basic Quality Assurance Program has not been significantly changed. The changes are essentially administrative in nature in that certain responsibilities for design activities have been trarsferred from. Bechtel Power Corporation (BPC) to Westinghouse Electric Corporation and.recent organizational changes have been described.
Specifically, Westinghouse will have the technical responsibility for the O
Vogtle-structural analysis mobile unit detailed design services including evaluation and resolution of impacts of piping and pipe support changes on stress analysis.
Bechtel will maintain quality program control over these activities and a Westinghouse project quality assurance engineer will be assigned at the site to ensure proper implementation of the Bechtel procedures. The organization changes reflect added management emphasis as O
described in detail by our letter of July 30, 1985 (Log: GN-667). The changes do not adversely affect the technical or quality centrols or reduce the commitments of the Quality Assurance Program.
\\
O' 100
\\
\\ h) 8508200306 850809 d
PDR ADOCK 05000424
\\
K PDR i
Qccl}
ofo&nd
r-1 United States Nuclear Regulatory Commission-File: X7N00.0-18 O
August 9, 1985 X7N17.1 X7BC35 Log: GN-675 l
Should you have any questions on the enclosed submittals, do not hesitate to contact us.
You truly d
. 6. Fost r O.
DOF/JLL/caa Enclosure xc: NRC Document Control Desk (60)
NRC Senior Resident M. A. Miller D. E. Dutton P. D. Rice
.R. A. Thomas J. A. Bailey
,O.
Batum G. Bockhold, Jr.
H. H. Gregory, III L. T. Gucwa C. W. Hayes O
W. C. Ramsey J. R. Joiner, Esquire B. W. Churchill, Esquire B. Jones, Esquire L. Fowler (LEAF)
T. Johnson (ECPG)
D. C. Teper (GANE)
SWORN AND SUBSCRIBED BEFORE ME, THIS 7t'A DAY OF
//;w,J 1985 cua k No y P6blic, Georgia State at Large MY COMMISSION EXP!RES APRll 11 10" O
O