ML20134E512

From kanterella
Jump to navigation Jump to search
Updates Util 850722 Ltr Re post-accident Sampling Sys.Sys Inoperable Due to Persistent Valve Leakage Problems.Boron Analyzer Repaired & Calibr.Pending Resolution of RCS Isolation Valve Leakage,Sys Should Be Operable by 850813
Date released: 05/27/2020 Download: ML20134E512


Ro:On 850305,main Vent wide-range Noble Gas Effluent Monitor Declared Inoperable.Initially Reported on 850404.Caused by Failed Ga Technologies RM-23 Keyboard Module Used to Control Radiation Detection Sensors.Repairs Completed on 850723
ML20134E520
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 08/07/1985
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To: MURLEY T E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20134E520 (2)
Updates Util 850722 Ltr Re post-accident Sampling Sys.Sys Inoperable Due to Persistent Valve Leakage Problems.Boron Analyzer Repaired & Calibr.Pending Resolution of RCS Isolation Valve Leakage,Sys Should Be Operable by 850813
ML20134E510
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 08/08/1985
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To: MURLEY T E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20134E510 (1)