Issue date: 07/03/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Speck R
ROGOVIN, HUGE & LENZNER
References
FOIA-84-816 NUDOCS 8508200102
Download: ML20134E244 (1)


Text

- - - _ - - _ _ - -

UNITED STATES f

+*

jo,,

WUCLEAR REGULATORY COMMISSION n

W ASHINGTON, D. C. 20555 p

l

~%*..+/

July 3,1985 l

f f

Randall L. Speck Esquire IN RESPONSE REFER Rogovin, Huge & Lenzner TO F01A-84-816 1730 Rhode Island Avenue, NW Washington, DC '20036

Dear Mr. Speck:

18,1984, in This is in further response to your letter dated October which you requested, pursuant to the Freedom of Information Act (FOIA),

copies of all records related to the Ford Amendment Study.

EncTosed are copies of the July 3,1985, letter and its enclosure provided to Mr. A. Patrick Leighton with regard to his FOIA request (F01A-84-293) regarding the Ford Amendment Study. Mr. Leighton's request was discussed in detail in my,' previous letter to you dated June 14, 1985.

The records identified on the enclosure are now available for public inspection and copying at the fiRC Public Document Room (PDR).

The staff is continuing to review additional records subject to your F0IA We will notify you upon completion of this review.

request.

/

Sinc ely,

~

M.

elton, Director Division of Rules and Records Office of Administration

Enclosures:

As stated 8500200102 850703 PDR skCKB-816

=

~ - - - - - - -. _ __ __.

E

ca es'o, UNITED STATES d'

~%

NUCLEAR REGULATORY COMMISSION i

j WASHINGTON, D. C. 20555

/

July 3, 1985 A. Patrick Leighton, III, Esquire Shaw, Patrick, Potts & Trowbridge 1800 M Street, NW IN RESPONSE REFER Washington, DC 20036 TO FOIA-84-293

Dear Mr. Leighton:

This is in further response to your letter dated April 17, 1984, in which you requested, pursuant to the Freedom of Information Act (F0IA), all records relating to the Ford Amendment Study.

We pFeviously made available documents identified in letters to you dated May 3,1984, May 17,1984, June 13,1984, June 27,1984, August 1,1984, September 4,1984, and June 10, 1985.

The records identified on the enclosed Appendix L are subject to your FOIA request and are now available for public inspection and copying at the NRC Public Document Room in folder F01A-84-293 under your name.

The staff is continuing to review additional records subject to your request.

We will notify you upon completion of this review.

516

rely, M. Felton, Director Division of Rules and Records Office of Administration

Enclosure:

As stated 1

6

j.

I t i

Re: F01A-84-293 APPENDIX L RECORDS IN PDR FILE F01A-84-293 MARBLE HILL DOCUMENTS (Torrey Pines Technology)

Torrey Pines Technology 1.

08/01/83 PFR No. 2485:018, ITEM: Weld Wire, Project No. 2485 (7 pages) 2.

08/01/83 PFR No. 2485:019. ITEM: Lack of ASME Spec. for weld wire Project No. 2485(10pages) 3.

08/01/83 PFR No. 2485:017, ITEM: Maintenance on Feedwater Pump 2AF01PB, ProjectNo.2485(8pages) 4.

07/27/83 PFR No. 2485:013, ITEM: Concrete Wall on Column Line #21 between Lines AA and Z at El. 417' to 433' of Fuel Handling bldg. Project No. 2485 (5 pages) 5.

07/27/83 PFR~No. 2485:010, ITEM: Embedded Plate on Unit #1 Containment Steel Dome, Project No. 2485 (6 pages) 6.

07/27/83 PFR No. 2485:014 ITEM: Tendon Anchor Plates (For Hor.iz.

Tendos) Project No. 2485 (4 pages) 7.

07/26/65 PFR iio. 2485:009 ITEM: Auxiliary Building Roof Structure Steel Framing, Column Beam Connection, Project No. 2485 (3 pages) 8.

07/26/83 PFR No. 2485:016, ITEM: Valve Change Incorporation - Generic ProjectNo.2485(3pages)

~,

9.

07/25/83 PFR No. 2485:011, ITEM: PSI Management Audits, Project No. 2485 (3 pages)

10. 07/25/83 PFR No. 2485:015, ITEM: Motor Operated Gate Valve IRH611 Project No. 2485 (3 pages)
11. 07/22/83 PFR No. 2485:012, ITEM: Fine Aggr6 gate for Concrete, Project No. 2485 (4 pages)
12. 07/22/83 PFR No. 2485:012, ITEM: Fine Aggregate for Concrete Project No. 2485 (4 pages)

+'

APPENDIX L RECORDS IN PDR FILE F01A-84-293 (Continued)

13. 07/21/83 PFR No. 2485:007. ITEM: Pi Project No. 2485 (8 pages)pe Support ICC03052R i

14.

07/21/83 PFR No. 2485:008, ITEM: Auxiliary Building Unit Roof Removable Slab #291F, Project No. 2485 (8 pages)

15. 07/21/83 PFR No. 2485:007, ITEM: Pi Project No. 2485 (4 pages)pe Suppcrt ICC03052R
16. 07/21/83 PFR No. 2485:055, ITEM: Design Control System Project No. 2485 (4 pages)
17. 07/21/83 PFR No. 2485:005, ITEM: Desi Project No. 2485 (10 pages) gn Control System,

t

18. 07/20/83 PFR No. 2485:006, ITEM: 'QA Job / Position Descriptions ProjectNo.2485(7pages)
19. 07/20/83 PFR No. 2485:004, ITEM: External Interfaces.

Project No. 2485 (8 pages)

20. 07/20/83 PFR No. 2485:006, ITEM: QA Job / Position Descriptions ProjectNo.2485(4pages)
21. 07/20/83 PFR No. 2485:004, ITEM: External Interfaces, ProjectNo.2485(4pages)
22. 07/14/83 PFR No. 001, ITEM: Residual Heal Removal System Project No. 2485 (3 pages)
23. 07/14/83 PFR No. 002, ITEM: Auxiliary Feedwater System Project No. 2485 (5 pages)
24. 07/14/83 PFR No. 003, ITEM: Shop Weld Performed at ITT Grinnell, Project No. 2485 (4 pages)

PALO VERDE DOCUMENTS

25. 07/31/74 Letter to: Arizona Public Service Company, ATTN: Mr. T. G.

Woods,~ Jr. from: R. H. Engelken, subject: Project No. 503, (13 pages) 26.

11/18/74 Letter to: Arizona Public Service Company, ATTN: Mr. E. E. Van Brunt, from: R. :1. Engelken, subject: Docket Nos. 50-528, 50-529,50-530,(11pages)

a.

APPENDIX L RECORDS IN PDR FILE F0IA-84-293 (Continued)

27. 07/24/75 Letter to: Arizona Public Service Company, ATTN: H. D.

Thornburg from: G. S. Spencer, subject: Report by R. J. Pate of the Second Preconstruction Pennit QA Inspection, (10 pages)

28. 05/19/76 Letter to: Arizona Public Service Company to G. W. Roy, from:

G. S. Spencer, subject: Report by R. J. Pate of a visit to the subject facility on April 28, 29 and 30, 1976 is forwarded for your information (10 pages)

29. 05/25/76 Region V Public Affairs-Office, to Jim Hanchett, subject:

NRC Staff Issues Constructiop Permits For Three-Unit Palo Verde Nuclear Plant in Arizona (1 page) 30.

12/23/76

Subject:

Dockets No. 50-528, 50-529, 50-530, ATTN:

Mr. E.E. Van Brunt, (23 pages)

~

31. 02/28/77

Subject:

Letter to: Arizona Public Service, ATTN:

Mr. E. E. Van Brunt, from: G. S. Spencer, (25 pages)

32. 06/14/77

Subject:

Inspection on May 9-12,1977(ReportNo. 50-528, 529, 530/77-03) Areas Inspected, Inspectors: R. J. Pate and T. W. Bishop, approved by G. S. Spencer, (19 pages)

33. 07/26/77

Subject:

Dockets Nos. 50-528, 50-529, 50-530, ATTN:

Mr. E. E. Van Brunt, APSC, from: G. S. Spencer, Region IV.

(22pages) 34.

11/10/77

Subject:

File: 77-058-026, ATTN: G. S. Spencer, from:

Mr. E. E. Van Brunt, (28 pages)

35. 02/28/78

Subject:

Control of Low Hydrogen, Covered, Arc-Welding Electrodes File: 78-056-026, ATTN: Mr. R. H. Engelken from: E. E. Van Brunt, (18 pages)

36. 03/01/78

Subject:

PSAR-Chapter 17,QualityAssurance,(60pages)

37. 07/27/78

Subject:

Docket Nos. 50-528, 50-529, 50-530, ATTN:

Mr. E. E. Van Brunt, from: G.S. Spencer,(15pages) 38.

10/18/78

Subject:

Notice of Violation Resulting from NRC Inspection of July 17-21, 1978, ATTN: Mr. E. E. Van Brunt, from:

G. S. Spencer (28 pages)

39. 08/22/80

Subject:

NRC Regional Evaluation of Licensee Perfonnance Palo Verde Units No. 1, 2 and 3. ATTN: Mr. E. E. Van Brunt from: R. H. Engelken, (16 pages)

APPENDIX L RECORDS IN PDR FILE F0IA-84-293 (Continued)

40. 01-02/81

Subject:

Inspection on January 26 - February 5, 1981 (ReportNos. 50-528/81-02, 50-529/81-02 and 50-530/81-02)

Inspectors: R. T. Dodds, L. E. Vorderbruegged, J. H. Eckhardt P. P. Narbut, J. O. Elin, Approved R. T. Dodds, (30 pages)

)

41. 04/06/81

Subject:

NRC Inspection of Palo Verde Units 1, 2 and 3 ATTN: Mr. E. E. Van Brunt, from: B. H. Faulkenberry (32pages) 42.

10/82

Subject:

Independent Quality Assurance Evaluation of Palo Verde Nuclear Generating Station Units 1, 2, and 3, Prepared for: Arizona Public Service Company, (Volumes 1 and 2)

43. 01/15/82

Subject:

NRC Inspection of Palo Verde Units 1, 2, and 3 ATTN: Mr. E. E. Van Brunt, -from: B. H. Faulkenberry (15 pages)

44. 02/05/82

Subject:

50-528, 50-529, 50-530, ATTN: Mr. E. E. Van Brunt from: B. H. Faulkenberry, (16 pages)

45. 07/23/82

Subject:

NRC I&E Inspection of March 29-April 2, 1982 File: 82-019-026, ATTN: Mr. T. W. Bishop, from: E. E. Van Brunt (21pages)

46. 01/83 Article from Electric Power and Light entitled " Good News from Nuclear Construction Projects Reported to AIF," (1 page)
47. 02/25/83

Subject:

Inspection on January 4-7 and 17-21, 1983 (Report No.

~

50-528/83-02), Inspectors: P. P. Narbut, Approved by: T. Young (15pages) l

48. 03/31/83

Subject:

NRC Insi:ction of Palo Verde Units 1, 2, and 3 l

ATTN: Mr. E. E. Van Brunt, from: D.M.Sternberg,(11pages) l

49. 04/25/83

Subject:

NRC Inspection of Palo Verde Units 1, 2, and 3 ATTN: Mr. E. E. Van Brunt, from: D.M.Sternberg,(16.pages)

50. 04/22/83

Subject:

Special NRC Inspection of Palo Verde Units 1, 2, and 3 ATTN: Mr. E. E. Van Brunt, from: J. L. Crews, (14 pages) l l

l

51. 04/22/83

Subject:

File: 83-019-026 ATTN: Mr. D. M. Sternberg, from: E. E. Van Brunt, (14 pages)

52. 05/10/83

Subject:

Systematic Assessment of Licensee Performace ATTN:

Mr. E. E. Van Brunt, from: J. L. Crews, (37 pages) l l

i APPENDIX L RECORDS IN PDR FILE F01A-84-293 (Continued)

53. 07/05/83-08/02/83

Subject:

Morning Report-Region V (8 pages)

54. 08/12/83

Subject:

Nucleonics, (5 pages)

55. 08/18/83

Subject:

Postulated Root Causes of Success, (5 pages)

56. 07/19/83

Subject:

Preliminary Notification, (3 pages)

57. 08/22/83

Subject:

NRC's Quality Assurance Initiatives Special Study of Nuclear Quality Assurance (Congressional Amendment Study)

Briefing Slides for Presentation, Dr. W. D. Altman, Projeci; Manager, (20 pages)

58. 08/26/83

Subject:

Root Causes-Construction, (7 pages)

59. 06/06/83

Subject:

Miscellaneous Charts, (30 pages)

60. Undated Chart from Power Engineering entitled "New Plants by Utilities" (1 page).
61. Undated Pamphlet entitled "Palo Verde Planta de Energia Nuclear" (18 pages)
62. Undated Brochure entitled "Palo Verde Nuclear Generating Station Tours."

SOUTH TEXAS DOCUMENTS 63.

04/30/80 Letter to G. W. Oprea, Jr., HLPC, from Victor Stello, Jr., IE, transmitting IE Inspection Report No. 50-498/79-19; 50-499/17-19 of NRC investigation conducted between November 10, 1979 and February 7,1980(226pages).

~

64. 09/19/80 Transcript and Record of the Public Meeting held on August 19, 1980 at Bay City, Texas, on the South Texas Project (416 pages).

65.

10/16/81 Memorandum for William L. Fisher, NRC, from G. C. Gower, NRC, entitled " South Texas Project and Zimer" (30 pages).

66. Undated Document entitled "Brief Overview-Zimmer" relating Zimmer experience to the South Texas Project (4 pages).

ZIMMER DOCUMENTS

67. 06/10/82

Subject:

Testimony of James G. Keppler Regional Administrator, Region III (Chicago) Office, United States Nuclear Regulatory Commission, Before the Subcommittee on Energy and the Environment of the Committee on Interior and Insular Affairs.

UnitedStatesHouseofRepresentativesWashington,DC(12 pages).

APPENDIX L RECORDS IN PDR FILE F01A-84-293 (Continued)

68. 09/01/82 Memorandum for: Chairman Palladino from William J. Dircks entitled "Zimmer Monthly Status Report to Comission" (36pages).
69. 09/14/82

Subject:

Testimony of James G. Keppler, Regional Administrator, Region II (Chicago) Office, United States Nuclear Regulatory Commission, 8efore the Subcomittee on Errrgy and the Environment of the Committee on Interior M Insular Affairs, United States House of Representatives, Me lington, DC (42pages).

70. 09/14/82

Subject:

Oversight Hearing " Quality Assurance at the Zimer Nuclear Station" Subcomittee on Energy and Environment.

Comittee on Interior and Insular Affairs, UntTEd States House of Representatives (60 pages).

~

71. 08/10-09/17/82

Subject:

Inspection CG&E/ Catalytic, Inc. (CI) (13 pages).

72. 09/20/82

Subject:

News Sumary (1 page) 73.

10/13/82

Subject:

Preliminar

---PN0 III-82-111 (y Notification of Event or Unusual Occurrence 1page) 74.

10/20/82 Newspaper article entitled: "Zimer Quality Control Assailed" The Cincinnati Enquirer (1 page).

75.

10/20/82 Newspaper article entitled "NRC Chides CG&E over Zimer Work "

The Cincinnati Post (1 page).

76.

11/16/82

Subject:

" News Release" NRC Office of Public Affairs (9 pages).

77.

12/06/82 Memorandum for William J. Dircks from James G. Keppler entitled "Zimer-Recommended Plan of Action for Implementing Comission Order" (7 pages).

78.

12/08/82 Memorandum for Chairman Palladino, Comission Gilinsky, Comission Ahearne, Comission Roberts, Comissioner Asselstine, from William J. Dircks, entitled "Section 50.54 (f) " Demand for Information" (September 24,1982) Issued to Cincinnati Gas and Electric" (3 pages).

79. 12/15/82

Subject:

" News Sumary," NRC Office of Public Affairs (1 page).

80. 07/22/83 Memorandum for Chairman Palladino, Comissioner Gilinsky, Comissioner Roberts, Commissioner Asselstine, from William J.

Dircks, entitled "Zimer Quarterly Status Report" (4 pages)

.s -

1 APPENDIX L RECORDS IN PDR FILE F0IA-84-293 (Continued)

81. 08/83

Subject:

Independent Review of Zimmer Project Management, Final Report, Volumes 1 and 2 - Discussion, Prepared for Cincinnati Gas and Electric Company by Torry Pines Technology (150 pages).

82.

10/03/83

Subject:

Preliminary Notification of Event or Unusual Occurrence-PRO-III-83-90 (1 page)

MIDLAND DOCUMENTS 83.

08/18/82 IE Bulletin No. 82-01, Rev. 1, Supplement 1: " Alteration of Radiographs of Welds in Piping Subassemblies" (5 pages) 84.

10/08/82 NRC News Release entitled "NRC Staff Proposed $90,000 Fine Against Illinois Power Company" (2 pages) 85.

10/20/82 NRC News Sumary (1 page) 86.

10/29/82 Memorandum for Darrell G. Eisenhut, NRR, from R. F. Warnick, Region III, entitled " Report on Midland Design and Construction Problems Their Disposition, and Overall Effectiveness of the Effort to Assure Appropriate Quality" (33pages)

87. 02/08/83 NRC News Release entitled "NRC Staff Proposes $120,000 Fine for Quality Assurance Violations at Midland (2 pages).

R8.

03/91/83 NRCStaffNotesonMidland(6pages)

89. 05/18/83 Letter to James W. Cook, Consumers Power Co., James G.

Keppler, NRC: Region III, and Darrell G. Eisenhut, NRC:NRR, from Howard Levin, TERA Corporation, transmitting revised Engineering Program Plan and Project Quality Assurance -

Plan (428 pages)

90. 06/08/83 "NRC Special Study of Nuclear Quality Assurance Briefing Slides for Presentation" by William Altman, NRC, To QA Case Studies and Preliminary Results (28 pages) pic:
91. 06/08/83 QA Review Group Meeting, June 8-9, 1983 Washington, DC (3 pages)
92. 06/24/83 "NRC Evaluation of Independent Reviews" - Tentative l

Agenda (1page)

93. 07/15/83 Project Instruction 3201-001, Rev. 3. " Engineering Evaluation Preparation and Control" (14 pages)

l APPENDIX L RECORDS IN PDR FILE FOIA-84-293 (Continued)

94. 08/15/83 PFR No. 2485:018, " Weld Wire Heat 57-L in Lines 1W004DB-10-1PC10 and IWO48-10-1PC8" (1 page)
95. 09/07/83 "NRC Special Study of Nuclear Quality Assurance Briefing Slides for Presentation" by William Altman, NRC, Topic:

QA Case Studies (21 pages) 96.

10/10/83 Bechtel Engineering Directive

" Release of Project EngineeringCalculationstotheClient"(2pages)

97. 10/27/83 TERA Corporation Meeting Notice

" Independent Design and Construction Verification pages)(IDCV) Program" to be held October 28,1983(5 98.

10/28/83 Meeting at Bechtel Ann Arbor Office

" Independent Design

~

and Construction Verification (IDCV) Program," list of attendees, agenda, and finding report (62 pages)

99. Undated Tenth Annual National Energy Division Conference, Session H -

Independent Verification of Design and Construction: " Third Party Independent Design and Construction Verification" by Michael G. Dunlap, GA Technologies, Inc. (10 pages) 100. Undated

" Form Amendment Pilot Pro Audit Program" (2 pages) gram - Independent Construction ST. LUCIE DOCUMENTS 1

101. 10/71 AEC Division of Compliance, " Monthly Report for October 1971" regarding quality assurance inspection on September 29-30, 1971(1page) 102. 12/27/71 Memorandum to J. B. Henderson, AEC, from F. J. Long, Region II, transmitting Inspection Report No. 50-389/71-1 covering the Quality Assurance Audit conducted on September 29 -

October 1,1971,forHutchinsonIslandNo.2(8pages) 103. 11/26/73 Inspection Report No. 50-389/73-1 for inspection at St. Lucie 2 on October 29-30, 1973 (9 pages) l 104. 12/03/73 Letter to R. E. Uhrig. FP&L from Norman C. Moseley, 1

AEC: Region II, regarding quality assurance audit on j

October 29-30, 1973 (3 pages) 105. 12/03/73 Memorandum for H. D. Thornburg, AEC, from F. J. Long, AEC:

Region II, transmitting Inspection Report No. 50-389/73-1 (1page) 106. 12/07/73 Letter to Norman C. Moseley, AEC, from Robert E. Uhrig.

FP&L, regarding FP&L proprietary review of Inspection Report No. 50-389/73-1(2pages)

,-.--.-_.---,--._n-

APPENDIX L RECORDS IN PDR FILE F01A-84-293 (Continued) 107. 03/01/74 Letter to Robert E. Uhrig, FP&L, from Norman C. Moseley, AEC: Region II, regarding quality assurance inspection conducted on' February 5-6, 1974, by Messrs. L. E. Foster and W. A. Crossman, Region II (2 pages) 108. 03/01/74 Inspection Report No. 50-389/74-1 for inspection at St. Lucie 2 on February 5-6, 1974 (10 pages) 109. 03/14/74 Letter to Norman C. Moseley, AEC, from Robert E. Uhrig, FP&L, regarding FP&L propriatary review of Inspection Report No. 50-389/74-1 (2 pages) 110. 07/09/74 Letter to Norman C. Moseley, AEC, frorr Robert E. Uhrig, FP&L, regarding change in schedule for revising quality assura0ce manual (2 pages) 111. 04/11/75 PSAR - Chapter 17, " Quality Assurance" (245 pages) 112. 04/24/75 Memorandum for H. D. Thornburg, AEC, from J. C. Bryant, NRC: Region II, regarding deletion of proprietary information from IE Report No. 50-389/75-1(10pages) 113. 04/24/75 Letter to Robert E. Uhrig FP&L, from Norman C. Moseley, Region II, regarding deletion of proprietary information form IE Report No. 50-389/75-1(4pages) 114. 05/09/75 Letter to Robert E. Uhrig. FP&L, from Norman C. Moseley, 1

NRC: Region II, regarding the quality assurance inspection conducted on April 8-10, 1975, by Mr. L. E. Foster, Region II(8pages) 115. 09/15/75 Letter to Robert E. Uhrig, FP&L, from Norman C. Moseley, NRC, regarding the quality assurance inspection conducted on August 11-15, 1975, by Mr. L. E. Foster, Region II (7 pages) 116. 11/20/75 Letter to Robert E. Uhrig, FP&L, from Norman C. Moseley, NRC: Region II, regarding the quality assurance inspection conducted on November 5-7, 1975, by Mr. L. E. Foster, Region II (8 pages) 117. 01/09/76 Letter to Robert E. Uhrig FP&L, from Norman C. Moseley, NRC: Region II, regarding the quality assurance inspection conducted on December 16-18, 1975, by Mr. L. E. Foster, Region II (10 pages) 118. 08/26/76 Letter to Robert E. Uhrig, FP&L, from C. E. Murphy, NRC:

Region II, regarding the quality assurance inspection-conducted on July 28-30, 1976, by Mr. D. H. Danielson, RegionII(11pages)

~'

APPENDIX L RECORDS IN PDR FILE FOIA-84-293 (Continued) 119. 09/08/76 Letter to Norman C. Moseley, NRC, from Robert E. Uhrig.

FP&L, regarding proprietary review of Inspection Report Ns. 50-389/76-1 (1 page) 120. 11/02/76 Letter to Robert E. Uhrig, FP&L, from C. E. Murphy, NRC:

Region II, regarding the quality assurance inspection conducted on September 22-24, 1976, by Mr. D. H. Danielson, Region II (9 pages) 121. 11/16/76 Letter to Norman C. Moseley, NRC, from Robert E. Uhrig, FP&L, regarding proprietary review of Inspection Report No. 50-389/76-2 (1 page) 122. 01/12/77 Letter to Robert E. Uhrig, FP&L, from C. E. Murphy, NRC:

Region II, regarding the quality assurance inspection conducted on November 18-19, 1976, by Mr. D. H. Danielson, Region II (8 pages) 123. 03/14/77 Letter to Norman C. Moseley, NRC, from Robert E. Uhrig, FP&L, regarding proprietary review of Inspection Report No. 50-389/76-3 (1 page) 124. 06/15/78 Letter to Robert E. Uhrig, FP&L, from C. E. Murphy, NRC:

Region II, regarding the quality assurance inspection conducted on May 15-18, 1978, by Messrs. B. R. Crowley and R. W. Wright, Region II (18 pages) 125. 08/29/78 Letter to Robert E. Uhrig, FP&L, from Charles E. Murphy, NRC, regarding the quality assurance inspection conducted on July 18-21, 1978, by Mr. B. R. Crowley, Region II (9 pages) 126. 08/31/78 Letter to Roger S. Boyd, NRR, from Robert E. Uhrig, FP&L, regarding FSAR and ER submittal schedule for St. Lucie 2 (1page) 127. 09/11/78 Letter to Charles E. Murphy, NRC, from Robert E. Uhrig FP&L, regarding proprietary review of Inspection Report No.

50-389/78-7(1page) 128. 12/06/78 Letter to Robert L. Baer, NRR, from Robert E. Uhrig, FP&L, regarding revised cost estimate for St. Lucie 2 (1 page) 129. 06/21/79 Letter.to Robert E. Uhrig, FP&L, from Charles E. Murphy, NRC: Region II, regarding inspection conducted on May 30-June 1,1979, by Mr. John R. Harris, Region II (6 pages) 130. 06/29/79 Letter to James P. O'Reilly, NRC: Region II, from Robert E.

Uhrig, FP&L, regarding revised construction schedule update (revision 5)(3pages) l i

APPENDIX L RECORDS IN PDR FILE F0IA-84-293 (Continued) 131. 07/13/79 Letter to Charles E. Murphy, NRC, from Robert E. Uhrig, FP&L, regarding proprietary review of Inspection Report No.50-389/79-08(2pages) 132. 07/30/79 Letter to Robert E. Uhrig. FP&L, from Charles E. Murphy, NRC: Region II, regarding measures FP&L has taken to correct item of noncompliance in Inspection Report No. 50-389/79-08 (1page) 133. 11/05/79 Letter to Robert E. Uhrig. FP&L, from Charles E. Murphy, NRC: Region II, regarding inspection conducted on October 9-12, 1979, byJ.J.Lenahan,RegionII(8pages) 134. 11/21/79 Letter to James P. O'Reilly, NRC: Region II, from Robert E.

Uhrig, FP&L. regarding proprietary review of Inspection Report No. 50-389/79-18 (3 pages) 135. 12/05/79-Letter to Robert E. Uhrig. FP&L, from Charles E. Murphy, NRC: Region II, regarding FP&L's supplemental response to NRC's Notice of Violation dated November 5,1979(1page) 136. 06/09/80~ Letter to Robert E. Uhrig, FP&L, from James P. O'Reilly, 1

NRC: Region II, regarding investigation conducted at St. Lucie i

on April 8 and April 21-24, 1980, by P. K. VanDoorn, Region II, with attached Notice of Violation and IE Investigation Report No. 50-389/80-05(9pages) 137. 06/27/80 Letter to James P. O'Reilly, NRC, from Robert E. Uhrig, FP&L, regarding FP&L proprietary review of IE Invatigation Report No. 50-389/80-05 (2 pages) 138. 07/21/80 Letter to Robert E. Uhrig, FP&L from Charles E. Murphy; NRC, regarding FP&L letter of July 7,1980, concerning FP&L corrective actions (1 page) 139. 08/05/30 Letter to Robert E. Uhrig, FP&L, from Charles E. Murphy, NRC, regarding inspection conducted at St. Lucie on July 15-18, 1980, by P. K. VanDoorn, Region II, with attached Inspection Report No. 50-335/80-23 and 50-389/

80-09 (8 pages) 140. 08/26/80 Letter to Darrell G. Eisenhut, NRR, from Robert E. Uhrig.

FP&L, regarding construction schedule update (15 pages) r

.A

APPENDIX L RECORDS IN PDR FILE F0IA-84-293 (Continued) 141. 10/03/80 Letter to Darrell G. Eisenhut, NRR, from Robert E. Uhrig, FP&L, regarding September 13, 1980 meeting in Bethesda, MD, concerning the operating license review for St. Lucie 2 (9 pages) 142. 10/10/80 Letter to Robert E. Uhrig, FP&L, from Charles E. Murphy, NRC, regarding inspection conducted at St. Lucie on September 17-19, 1980, by W. P. Kleinsorge, Region II, with attached NRC Notice of Violation and Inspection Report No. 50-335/80-31and50-389/80-13(8pages) 143. 11/07/80 Letter to James P. O'Reilly, NRC, from Robert E. Uhrig, FP&L, regarding proprietary review of Inspecti15E Report No. 50-389/80-13 (3 pages)

~

144. 11/26/80 Letter to Robert E. Uhrig, FP&L, from Charles E. Murphy, NRC, regarding FP&L's letter of November 7, 1980 concerning FP&L's corrective actions on items of noncompliance (1page) 145. 01/21/81 Memorandum for Chairman, SALP Review Group, IE, from i

James P. O'Reilly, Region II, entitled "SALP Board 9

ResultsforFloridaPowerandLightCompany"(17pages) 146. 02/20/81 Letter to Robert E. Uhrig, FP&L, from Charles E. Murphy, Region II, regarding inspection conducted at St. Lucie on January 20-23, 1981, by W. P. Kleinsorge, Region II, with attached Notice of Violation and Report Nos. 50-335/

81-03 and 50-389/81-02 (14 pages) 147. 03/18/81 Letter to James P. O'Reilly, NRC, from Robert E. Uhrig, No.50-389/81-02(4 pages)y review of Inspection Report FP&L, regarding proprietar 148. 04/03/81 Letter to James P. O'Reilly, NRC, from Robert E. Uhrig.

corrective action (plementary response to address FP&L, regarding sup

(

1page) 149. 04/06/81 Letter to Robert E. Uhrig FP&L, from R. C. Lewis, Region II, regarding FP&L letter of March 18,1981(1page) 150. 04/15/81 Letter to Robert E. Uhrig FP&L, from Richard C. Lewis, Region II, regarding special safety inspection conducted at.St. Lucie 2' on March 9-10, 1981, by J. C. Bryant, et al., Region II, with attached Notice of Violation and Tiispeiction Report No. 50-389/81-04(31pages) l

APPENDIX L RECORDS IN PDR FILE F01A-84-293 (Continued) 151. 05/11/81 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig, FP&L, regarding proprietar No.50-389/81-04(9 pages)y review of Inspection Report 152. 05/11/81 Memorandum for Darrell G. Eisenhut, NRR, from Christian C.

Nelson, NRR, entitled "SALP Input for St. Lucie, Unit No.1" (6pages) 153. 06/01/81 Letter to Robert E. Uhrig, FP&L, from Richard C. Lewis, Region II, regarding FP&L letter of May 11, 1981, concerning correctiveactions(1page) 154. 06/03/81 Letter to Robert E. Uhrig FP&L, from Richard C. Lewis, Region II, regarding special safety inspection conducted at St. Lucie on May 4-7, 1981, by Mr. J. J. Lenahan, Region II,

~

with attached Notice of Violation and Inspection Report Nos. 50-335/81-10 and 50-389/81-06 (12 pages) 155. 06/09/81 Letter to Robert E. Uhrig, FP&L, from Richard C. Lewis, Region II, regarding routine safety inspection at St. Lucie on May 12-15, 1981, by Mr. B. R. Crowley, Region II, with attached Notice of Violation and Inspection Report No. 50-389/81-07 (13 pages) 156. 06/16/81 Letter to Robert E. Uhrig. FP&L, from Richard C. Lewis, Regien II, regarding special safety inspection conducted at St. Lucie 2 on May 12-15, 1981, by Mr. T. D. Gibbons, Region II, with attached Notice of Violation and Inspection Report No. 50-389/81-09(6pages) 157. 06/29/81 Letter to James P. O'Reilly, NRC, from Robert E. Uhrtg..

FP&L with response to Inspection Report 50-389/81-06 and proprietary review (3 pages) 158. 07/07/81 Letter to Darrell G. Eisenhut, NRR, from Robert E. Uhrig, FP&L, regarding construction completion schedule for St. Lucie 2 (16 pages) 159. 07/08/81 Letter to James P. O'Reilly, NRC, from Robert E. Uhrig, FP&L, with response to Inspection Report 50-389/81-07 and proprietary review (3 pages) 160. 07/13/81 Letter to Robert E. Uhrig. FP&L, from P. J. Kellogg, j

Region II, regarding FP&L letter of June 29,1981(1page)

e APPENDIX L RECORDS IN PDR FILE F0IA-84-293 (Continued) 161. 07/15/81 Letter to James P. O'Reilly, NRC, from Robert E. Uhrig, FP&L, regarding proprietar No.50-389/81-09(3 pages)y review of Inspection Report 162. 07/23/81 Letter to Robert E. Uhrig, FP&L, from P. J. Kellogg, Region II, regarding FP&L letter of July 8,1981(1page) 163. 07/31/81 Letter to Robert E. Uhrig. FP&L, from P. J. Kellogg, NRC: Region II, regarding FP&L letter of July 15, 1981 (1page) i 164. 05/27/81 Letter to Robert E. Uhrig FP&L, from Richard C. Lewis, Region II, regarding routine safety inspectio jnonducted at St. Lucie on April 28-May 1,1981, by Mr. B. K. Crowley, Region II, with attached Notice of Violation and Inspection Report No. 50-389/81-05'(20pages) 165. 06/19/81 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig, FP&L, stating response to Inspection Report No. 50-389/81-05 will be submitted (1 page) 166. 06/29/81 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig, FP&L, with attached FP&L response to Inspection Report No. 50-389/81-05 (7 pages) 167. 08/31/81 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig, FP&L. with supplementary response to Inspection Report No. 50-389/81-05 (3 pages) 168. 09/14/81 Letter to Robert E. Uhrig. FP&L, from Paul J. Kellog, Region II, regarding routine safety inspection conducted at St. Lucie on August 18-21, 1981, by W. P. Kleinsorge, Region II, with attached Notice of Violation and Ins Report Nos. 50-335/81-20 and 50-389/81-16 (19 pages)pection 169. 09/18/81 Letter to Robert E. Uhrig. FP&L, from Paul J. Kellogg, Region II, acknowledging (receipt of response to Inspection Report No. 50-389/81-05 1 page) 170. 10/13/81 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig, FP&L, with response to Inspection Report No. 50-389/81-16 (6pages)

I 171. 10/22/81 Letter to Robert E. Uhrig. FP&L, from Paul J. Kellogg, Region II, regarding routine safety inspection at St. Lucie conducted on September 29-October 2, 1981, by Mr. E. H.

Girard, Region II, with attached Inspection Report No.

50-389/81-19 (10 pages)

6 APPENDIX L RECORDS IN PDR FILE F01A-84-293 (Ceni.1nued) 172. 10/18/81 Letter to Robert E. Uhrig, FP&L from Richard C. Lewis, Region II, concerning FP&L letter of October 13, 1981, in response to Inspection Report Nos. 50-335/31-20 and 50-389/81-16(1page) 173. 12/02/81 Letter to Robert E. Uhrig, FP&L, from Paul Kellogg, Region, II, regarding routine safety inspection conducted at St. Lucie on October 21-23, 1981, by Mr. J. J. Lenahan, Region II, with attached Inspection Report No. 50-335/81-27 and50-389/81-20(9pages) 174. 12/09/81 Letter to Robert E. Uhrig. F)&L, from James P. O'Reilly, Report Nos. 50-335/81-28and50-389/81-22(8 pages) pection Region II, with attached Notice of Violation and Ins 175. 12/14/81 Letter to Robert E. Uhrig. FP&L, from Paul J. Kellogg, l~

Region ~II, regarding routine safety inspection conducted on November 23-25, 1981, by Mr. W. P. Ang, Region II, with attached Notice of Violation and Inspection Report No.

50-335/81-31and50-389/81-24(9pages) 176. 12/28/81 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig, FP&L, with supplemental response to Inspection Report 50-389/81-05(2pages) 177. 01/08/82 Letter to J. P. O'Reilly, Region II, from R. E. Uhrig', FP&L, regarding proprietary review of Inspection Report 50-389/

81-22 (3 pages) 178. 01/18/82 Letter to R. E. Uhrig. FP&L, from Paul J. Kellogg, Region II, regarding FP&L, from Paul J. Kello28,1981(gg,RegionII,regarding i

FP&L letter of December 1 page)

~

l 179. 01/19/82 Letter to R. E. Uhrig. FP&L, from James P. O'Reilly, Region II, i

regarding routine safety inspection conducted on December 14-17, 1981, by Mr. W. P. Kleinsorge, Region II, with attached Notice of Violation and Inspection Report 50-389/

81-25(14pages) 180. 02/12/81 " Flexible Control Tools Promote Success" by George B.

Bradshaw, Raymond E. Schweikart, and Gerald M. Smith, FP&L, presentation at 1982 Winter Symposium, American AssociationofCostEngineers(27pages) 181. 02/18/82 Letter to Robert E. Uhrig, FP&L, from Frank J. Long, Region II, regarding routine safety inspection conducted at St. Lucie on December 11, 1981 - January 10, 1982, by Mr. S. A. Elrod, Region-II, with attached Notice of Violation and Inspection Report Nos. 50-335/81-35 and 50-389/81-26 (10pages) l l

APPENDIX L RECORDS IN PDR FILE FOIA-84-293 (Continued) 182. 02/25/82 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig, j

FP&L, with FP&L response to Inspection Report No. 50-389/

81-25(7.pages) 183. 03/18/82 Letter to Robert E. Uhrig, FP&L, from Frank J. Long, Regicn II, regarding FP&L letters of January 8 and February 19, 1982 in response to Inspection Report No. 50-389/81-22(1page) 184. 03/22/82 Letter to J. P. O'Reilly, Region II, from Robert E. Uhrig, FP&L, regarding proprietary review of IE Inspection Report 81-35 and 81-26 (3 pages) 185. 03/26/82 Letter to Robert E. Uhrig. FP&L, from Frank J. Tong, Region II regarding safety inspectiori conducted at St. Lucie on February 16-19, 1982, by Mr. B. R. Crowley, Region II, with attached Notice of Violation and Inspection Report 50-389/

82-07(20pages) 186. 03/29/82 Letter to R. E. Uhrig, FP&L, from F. J. Long, Region II, regarding FP&L response to Inspection Report No. 50-389/

81-25 (5 pages) 187. 03/30/82 Letter to R. E. Uhrig, FP&L, from F. J. Long, Region II, regarding FP&L response to Inspection Report Nos. 50-335/

81-35 and 50-389/81-36 (1 page) 188. 03/30/82 Letter to R. E. Uhrig, FP&L, from F. J. Long, Region II, regarding routine safety inspection conducted at St. Lucie on March 9-12, 1982 by Mr. A. B. Ruff, Region II, with attached Notice of Violation and Inspection Report No.

50-389/82-10 (8 pages) 189. 04/20/82 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig, FP&L, with FP&L response to Inspection Report No. 50-389/

82-07 (5 pages) 190. 04/21/82 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig, FP&L, with FP&L response to Inspection Report No. 50-389/

82-10(2pages) i 191. 04/27/82 " Quality Performance Review", St. Lucie 2. Florida Power &

i LightCo.(47pages) l 192. 04/28/82 Letter to R. E. Uhrig FP&L, from H. C. Dance, Region II, regarding routine safety inspection at St. Lucie conducted by Mr. 8. R. Crowley on March 29-April 2, 1982, with attached Notice of Violation and Inspection Report No.

50-389/82-13 (19 pages) l l

APPENDIX L RECORDS IN PDR FILE FOIA-84-293 (Continued) 193. 04/29/82 Letter to R. E. Uhrig. FP&L, from H. C. Dance, Region II, regarding FP&L response dated April 21, 1982, to NRC Inspection Report No. 50-389/82-10(1page) 194. 05/04/82 Letter to Darrell G. Eisenhut, NRR, from Robert E. Uhrig, FP&L, regarding outstanding work items at St. Lucie 2 (9pages) 195. 05/28/82 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig),

FP&L, with FP&L response to Seport No. 50-389/82-13 (2 pages 196. 06/01/82 Letter to R. E. Uhrig. FP&L, from James P. O'Reilly, Region II, i

regarding inspection at St. Lucie 2 on May 10-13, 1982, by Mr. W. J. Tobin, Region II, with attached Inspection Report No.50-389/82-22(5pages) 197. 06/15/82 Letter to R. E. Uhrig FP&L, from H. C. Dance, Region II, regarding FP&L response to Inspection Report 50-389/82-13 (1page)

I 198. 06/16/82 Letter to Walter P. Haass, NRR, from Robert E. Uhrig, FP&L, submitting for NRC evaluation revision 5 to the Topical 4

Quality Assurance Report (131 pages)

~

199. 06/23/82 Letter to R. E. Uhrig FP&L, from H. C. Dance, Region II, reoarding routine safety inspection conducted by Mr. J. L.

Coley, Region II, on May 11-14, 1982, with attached Notice of Violation and Inspection Report No. 50-389/82-20 (12 pages) 200. 06/25/82 Letter to R. E. Uhrig, FP&L, from R. C. Lewis, Region II, regarding routine safety inspection at St. Lucie 2 on May 25-28, 1982, by Mr. W. H. Miller, Jr., with attached Notice of Deviation and Inspection Report No. 50-389/82-23 (6 pages) 201. 06/30/82 " Systematic Assessment of Licensee Performance 30ard Report,"

Florida Power & Light Company Inspection Report Numbers 50-250/82-33, 50-251/82-33, 50-335/82-37, and 50-389/82-56 (50pages) 202. 07/16/82 Letter to R. E. Uhrig. FP&L, from H. C. Dance, Region II, regarding routine safety inspection at St. Lucie 2 on June 21-25, 1982, by Mr. M. D. Hunt, Region II, with attached Inspection Report No. 50-389/82-29(7pages) a

i:

APPENDIX L RECORDS IN PDR FILE F01A-84-293 (Continued) i 203. 07/22/82 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig, i

FP&L with FP&L response to Inspection Report No. 50-389/82-23 (2pages) 204. 07/22/82 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig, FP&L, with FP&L response to Inspection Report No. 50-389/82-20 i

(3 pages) t 205. 08/02/82 Letter to Robert E. Uhrig. FP&L, from Walter P. Haass, NRR, regarding NRC acceptance of FP&L's Quality Assurance Topical Report (3 pages) 206. 08/02/82 Letter to R. E. Uhrig FP&L from R. C. Lewis, Region II, regarding FP&L corrective measures in response to Inspection Report 50-389/82-23(1page)

~

207. 08/03/82 Letter to R. E. Uhrig, FP&L, from R. C. Lewis, Region II, j

regarding the routine safety inspection at St. Lucie 2 on June 21-25, 1982, by Mr. J. W. York, Region II, with attached Notice of Violation and Inspection Report No.

50-389/82-28(10pages) 208. 08/13/82 Letter to Darrell G. Eisenhut, NRR, from T. H. Blodgett, Engineering Verification Task Force, Ebasco Services l

Incorporated, regarding St. Lucie 2 Engineering Verification i

Program, Program Procedure No. EVP-001/SL-2, Rev.1 (14 pages) 1 4

209. 08/13/82 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig, FP&L, with response to Inspection Report No. 50-389/82-29 (3 pages) 210. 08/24/82 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig.

FP&L, with response to Inspection Report No. 50-389/82-28

~

i (5pages) 211. 08/26/82 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig, FP&L, with response to Inspection Report No. 50-389/82-20 (2pages) 212. 08/31/82 Letter to Darrell G. Eisenhut. NRR, from T. H. Blodgett.

Engineering Verification Task Force, Ebasco Services Incorporated, regarding St. Lucie'2 Engineering Verification Program, Task Force Independence - Interim Report (2 pages) 213. 09/02/82 Letter to R. E. Uhrig, FP&L from H. C. Dance, Re'gion II, No.50-389/82-29(1 page) ponse by FP&L to Inspection Report regarding supplemental res i

214. 09/03/82 Letter to R. E. Uhrig. FP&L from H. C. Dance, Region II, regarding FP&L response to Inspection Report No. 59-389/

r 82-20(1page)

l APPENDIX L RECORDS IN PDR FILE FOIA-84-293 (Continued) 215. 09/08/82 Letter to R. E. Uhrig, FP&L, from H. C. Dance, Region II, regarding FP&L response to Inspection Report No. 50-389/

82-28(1page) 216. 09/29/82 Letter to R. E. Uhrig, FP&L, from R. C. Lewis, Region II',

regarding routine inspection at St. Lucie 2 on September 7-10, 1982, by Mr. B. R. Crowley, Region II, with attached Notice of Violation and Inspection Report No. 50-389/82-43 (13pages) 217. 11/08/82 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig.

FP&L, regarding response to Inspection Report No. 50-389/

82-43(6pages) i 218. 11/09/82 Letter to R. E. Uhrig, FP&L, from R. C. Lewis, Region II, regarding routine safety inspection at St. Lucie 2 on October 4-8, 1982, by Mr. R. W. Wright, Region II, with attached Inspection Report No. 50-389/82-45(20pages) 219. 12/13/82 Letter to Mr. James P. O'Reilly, FP&L. from Robert E. Uhrig, FP&L, with response to Inspection Report No. 50-389/82-43 (1page) 220. 12/14/82 Letter to R. E. Uhrig. FP&L, from R. C. Lewis, Region II, regardinginspectiononNovember 15-19, 1982, by Mr..G. A.

heisle, with attached Notice of Violation and Inspection Report Nos. 50-335/82-38and50-389/85-57(21pages) 221. 12/29/82 Letter to R. E. Uhrig. FP&L, from H. C. Dance, Region II, regarding FP&L response to Inspection Report No. 50-3,89/

82-43(1page) 222. 01/03/83 Letter to R. E. Uhrig, FP&L from H. C. Dance, Region II, regarding inspection on December 6-9, 1982, with Inspection Report No. 50-389/82-66(6pages) 223. 01/12/83 Letter to R. E. Uhrig. FP&L, from R. C. Lewis, Region II, regarding inspection on November 16-19, 1982, by Mr. W. P.

Kleinsorge, with attached Notice of Violation and Inspection Report No. 50-289/82-60(10pages) 224. 01/13/83 Letter to R. E. Uhrig. FP&L, from R. C. Lewis, Region II, regarding inspection on December 6-9, 1981, with attached Notice of Violation and Inspection Report No. 59-389/82-71 (9pages)

APPENDIX L RECORDS IN PDR FILE F01A-84-293 (Continued) 225. 01/14/83 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig, FP&L, with response to Inspection Report No. 50-389/82-57 (3 pages) 226. 01/18/83 Letter to R. E. Uhrig, FP&L, from James P. O'Reilly, Region II, regarding " Systematic Assessment of Licensee Performance" (2 pages) with attached letter dated November 12, 1982, to R. E. Uhrig from R. C. Lewis, Region II (4 pages) 227. 01/31/83 Chart entitled " Scope Comparison" (25 pages) 228. 02/83 FP&L Organizational Charts (4 pages) 229. 02/83 FP&L Organizational Charts (3 pages) 230. 02/11/83 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig, FP&L, with response to Inspection Report No. 50-389/82-71 (3 pages) 231. 02/17/83 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig, FP&L, with response to Inspection Report No. 50-389/82-57 (2pages) 232. 03/10/83 Letter to James P. O'Reilly, Region II, from Robert E. Uhrig, FP&L with response to Inspection Report No. 50-389/82-71 (1page).

233. 03/18/83 Letter to R. E. Uhrig. FP&L, from R. C. Lewis, Region II, regarding FP&L response to Inspection Report No. 50-389/

82-71 (1 page) 234. 04/05/83 Letter to R. E. Uhrig, FP&L, from R. C. Lewis, Region II, in response to Report Nos. 50-335/82-38 and 50-389/82-57 (1page) 235. 06/13/83 NRC News Release entitled "NRC Authorizes Full Power l

OperationofFloridaNuclearPowerPlant"(1page) 236. 06/27/83 "NRC's Quality Assurance Initiatives Special Study of Nuclear Quality Assurance (Congressional Amendment Study),"

Briefing slides for presentation, W. D. Altman, Project Manager (24 pages) l 237. 06/27/83 "St. Lucie #2 Site Visit, June 27-July 1,1983" (109 pages) 238. 04/84

" Quality Assurance Case Study Working Paper - Case E" 1

(79pages) l i

APPENDIX L RECORDS IN PDR FILE FOIA-84-293 (Continued) 239. Undated "The Construction Licensing Process" (17 pages) 240. Undated

" Justification of Increase in Indirect Costs" (18 pages) 241. Undated Handwritten lists of St. Lucie Files (5 pages)

MISCELLANEOUS DOCUMENTS 242. 11/22/83 Letter to JW Cook, CPC, JG Keppler, RIII, DG Eisenhut, NRR, from HA Levin, TERA

Subject:

Discussion and Status of s

Confirmed Items, Finding, and Findings Resolution (5 pages) 243. 09/30/83 Letter to JW Cook, CPC, JG Keppler, RIII, DG Eisenhut, NRR, fromHALevin, Midland (8pages) 244. 09/30/83 Letter to Cook, Keppler, and Eisenhut, from Howard Levin,

~

~

TERA,transmittingresumesforIDVP(8pages) 245. 09/19/83 Letter to G. Gower, NRC from FS Ople, Project Manager

Subject:

Independent Construction Review of Marble Hill NGS Units 1 and 2 (4 pages) 246. 09/19/83 Letter to JA Christensen from FW Albaugh

Subject:

Coments Following Review Group Meeting #2 (76 pages)

?47, 09/15/R3 Memorandum for DS Hood, NRR, from JM Taylor, QASIP,

Subject:

Docket Nos. 50-329/330, Midland IDCV Program TERA (1 page)

White Paper on Options 240. 09/13/83 Letter to SW Shields, ND, from FS Ople, Project Manager (5 pages) 249. 09/07/83 Letter to JW Cook, CPC, JG Keppler, RIII, DG Eisenhut, NRR from HA Levin, Project Manager (10 pages) 250. 09/06/83 Letter to JW Cook, CPC, JG Keppler, RIII, DG Eisenhut, NRR i

fromHALevin(estimate 150) 251. 08/30/83 Letter to SW Shields from FS Ople, Project Manager (5 pages) 252. 08/19/83 Letter to WH Dickhoner, CG&EC from AJ Neylan, Project Manager (2pages) 253. 08/16/83 Letter to SW Shields from FS Ople, Project Manager (5 pages) 254. 08/15/83 Letter to Findings Review Comittee from FS Ople,

Subject:

Project 2485-ProcessingofPFRS(2pages) i l

4 APPENDIX L RECORDS IN PDR FILE F01A-84-293 (Continued) 255. 08/02/83 Letter to SW Shields from FS Ople, Project Manager (6 pages) 256. 07/20/83 Letter to JM Taylor, QASIP from FS Ople, Project Manager

Subject:

Independent Construction Review of Marble Hill NGS Units 1 and 2 (7 pages) 257. 07/05/83 Letter to SW Shields from FS Ople, Project Manager (5 pages) 258. 06/20/83 Letter to SW Shields from FS Ople, Project Manager (4 pages) 259. 10/04/82 South Texas

" Notes from NRC's Proposed Opinion, Findings of Fact, Conclusions of Law and Order in Form.af Partial Initial Decision" (4 pages) 260. 04/08/83 South Texas

" Tentative Root Causes" (15 pages) e,-

261. 06/83 Marble Hill

" Program Plan - Independent Construction Review of Marble Hill Nuclear Generating Station, Units 1 and 2,"

prepared for Public Service Indiana by Torrey Pines Technology (42 pages) 262. 08/83 Zimer

" Independent Review of Zimer Project Management, Final Report, Volume 1 - Executive Summary," prepared for Cincinnati Gas and Electric Company by Torrey Pines Technology (54pages) 263. 06/05/83 Marole Hill

" Project 2485, Independent Construction Review of Marble Hill Nuclear Generating Station, Units 1 and 2, Summary Report. Ta d A - Evaluation of QA Organization and T.R.Colandrea(14pages)QualityAssurance"by Management Policies Toward 264. 02/29/84 " Quality Assurance Case Study Working Paper Case D" (27pages) 265. 03/84

" Quality Assurance Case Study Working Paper - Case F,"

prepared for NRC by Pacific Northwest Laboratory, Richland, Washington (42pages) 266. 08/75 Article entitled "On Some Statistical Aids Toward Economic Production" by W. Edward Deming, Interfaces, Vol 5, No. 4 (16pages) 267. 12/80 Article entitled " Quality Control: The Human Factor" by Alan Field, Tradepia International, Winter, 1980(10pages)

. _. _ _ -.. - ~ _

,.____m.

..~ _ _. _ -. _ ___,,

Re: F01A-84-293 APPENDIX L RECORDS IN PDR FILE FOIA-84-293 (Continued) 268. 08/20/82 Memorandum for NRC Office Directors from Jack W. Roe, OEDO, entitled "EDO Program Guidance" (28 pages).

269; 09/20/82 ASLB, " Proposed Finding of Fact and Conclusions of Law" by CitizensConcernedAboutNuclearPower,Inc.(CCANP),

Larry Alan Sinkin, Counsel for CCANP (140 pages).

270. 09/23/82 Memorandum for the Commission from William J. Dircks, EDO, entitled "' Clarification of SECY-82-352" (1 page).

s 271. 09/28/82 Memorandum for Commissioners from John E. Zerbe, OPE, entitled

" Assurance of Quality (SECY-82-352)" (9 pages).

272. 09/29/82 " Briefing on Quality Assurance - SECY-82-352, Public Meeting" before' Commission (87pages).

273. 09/29/82 " Slides for Commission Briefing on Quality Assurance Initiatives"(21pages).

274. 10/08/82 Letter to Harold Harty, PNL, from Willard D. Altman, NRC, enclosing documents to support PNL long-term review of quality assurance (2 pages) with enclosure 1. " Format of Quality AssuranceCaseStudyReport"(11pages).

275. 10/08/82 Letter to Harley Kirschenmann, EG&G Idaho, from Willard D.

Altman, NRC, transmitting documents to support EG&G and PNL long-term review of quality assurance (2 pages).

276. 10/14/82 Memorandum for Terry L. Harpster IE, from Bill Altman,(IE,1page).

entitled " Resumes of Key Participants from PNL in LTR" 277. 11/15/82 Memorandum for the Commissioners from John E. Zerbe, OPE, entitled " Regulatory Review and Associated Hold Points During Nuclear Power Plant Construction and Testing" (24pages).

278. 12/21/82 Memorandum for the Commissioners from William J. Dircks EDO, entitled " Staff Requirements - Briefing on Quality Assurance, September 29,1982"(4pages).

279. 02/17/83 Memorandum for Mark H. Williams, NRR, from Gus C. Lainas, NRR, entitled " Review of Commission Infcrmation Report, Certification of Licensee Quality.tssurance Programs and Rule of Designated Representatives" (6 pages).

Re: F01A-84-293 APPENDIX L RECORDS IN PDR FILE F01A-84-293 (Continued) 280. 03/03/83 Letter to J. Lynn Helms, Administrator, FAA, from Nunzio J.

Palladino, NRC, regarding FAA regulation of design, construction and operation of aircraft and allocation of safety responsibilities among designers, manufacturers, and operators (1page).

281. 03/17/83 Letter to Nunzio J. Palladino, NRC, from J. Lynn Helms, Administrator, FAA, regarding briefing by M. Craig Beard, FAA, to Commission on April 5,1983(1page).

282. 03/28/83 Letter to Lars Nordstrom, Stater.s Karnkraftinspektion, Sweden, from Joseph D. LaFleur, Jr.

IP, regarding NRC study of quality assurance (2pages).

~

283. 05/12/83 Memorandum for Chairman Palladino from Frederick Forscher, IE, entitled "QA Policy: Reliability and Public Confidence" (3pages).

284. 05/20/83 Note for Jim Christensen, PNL,(from Bill Altman, NRC, entitled

" Review Group Briefing Book " 2pages).

285. 06/15/83 Letter to Henry Raleigh, Oak Ridge Technical Information Center, from E. William Brach, IE, enclosing list from Energy Data Base System concerning nuclear quality assurance (15pages).

286. 06/16/83 Letter to Nunzio J. Palladino, NRC, from J. J. Ray, ACRS, entitled " Comments on the NRC Safety Research Program Budget for Fiscal Years 1985 and 1986" (20 pages).

287. 08/08/83 Note to John Heidenreich, KIST & Associates, from Bill Brach.

IE, entitled " Papers for NRC Review" (1 page)

~

288. 09/23/83 Memorandum for James Taylor,(IE, from Darrell G. Eisenhut, NRR, entitled "QA Draft Reports" 1 page).

289,12/05/83 CommissionInformationPaper(PolicyIssue),SECY-83-499,

" Status Report on Study of Designated Representatives" (16 pages).

290. 01/03/84 Note to Bili Altman and Jim Kennedy (, IE, from Bill Brach, IE, entitled "Outside Program Reports" 1page).

291. 01/06/84 Note to Bill Altman, IE, from Bill Brach IE, entitled

" Comments on Kist Report-Executive Summary and Chapter 2.0, Summary and Conclusions" (5 pages).

v e

Re:~FOIA-84-293 APPENDIX L RECORDS IN PDR FILE FOIA-84-293 (Continued) 292. 01/06/84 Memorandum for Richard C. DeYoung, IE, et al., from G. Ted Ankrum, IE, entitled " Schedule for Report to Congress and Review of Draft Report" (3 pages).

293. 01/30/84 Memorandum for W. J. Dircks, et al., from Richard C. DeYoung, IE, entitled " Report to Congress on Improving QA" (3 pages).

294. 03/21/84 Letter for Samuel J. Chilk, Secretary, from R. F. Fraley, ACRS, entitled " Proposed Federal Register Meeting Notice for the 288th ACRS Meeting - April 5-7,1984"(7pages).

295. 03/21/84 Letter to Nunzio J. Palladino, NRC, from Jesse C. Ebersole,

~

ACRS, entitled "ACRS Report on Draft NRC Report to Congress on Improving Quality and the Assurance of Quality in the Design and Construction of Commercial Nuclear Power Plants" (5pages).

296. 04/02/84 Memorandum for the Commission from John E. Zerbe, OPE, entitled "0PE Comments on SECY-84-124, ' Report to the Congress on Improving Quality and the Assurance of Quality in the Design and Construction of Commercial Nuclear Power Plants' (Ford Amendment Study)" (9 pages).

297. Undated ASLB, " Testimony on Behalf of Houston Lighting & Power Company, at al., of Mr. George W. Opera, Jr., Mr. Joseph W. Briskan, Rr.~ Richard A. Frazar, Mr. John M. Amaral, on the Experience of Houston Lighting & Power Company in the Construction of the South Texas Project and the Actions Taken as a Result of the NRC Order to Show Cause," Docket Nos. 50-498 OL and 50-499OL(127pages).

298. Undated ASLB, " Testimony on Behalf of Houston Lighting & Power Company, s

et al., of Dr. Knox M. Broom, Jr., Mr. Raymond J. Vurpillat on HIR Ranagement and STP QA Program." Docket Nos. 50-498 OL and50-499OL(57pages).

299. Undated ASLB, " Testimony on Behalf of Houston Lighting & Power Company et al., of Mr. C. Bernt Petterson, Mr. Timothy K. Logan, FE. Charles S. Hedges Mr. W. Stephen McKay on the Structural Backfill Program at STP," Docket Nos. 50-498 OL and 50-499 OL (33pages).

300. Undated ASLB, " Testimony on Behalf of Houston Lighting & Power Company, et al., of Mr. Jerome H. Goldberg, Mr. Richard A. Frazar on Riuston Lighting & Power Company's Current Management of the South Texas Project," Docket Nos. 50-498 OL and 50-499 OL (37pages).

l Re: FOIA-84-293 APPENDIX L RECORDS IN PDR FILE F01A-84-293 (Continued) 301. Undated ASLB, " Testimony on Behalf of Houston Lighting & Power Company, et al., of Mr. Don D. Jordan," Docket Nos. 50-498 OL and 3U-T99 OL (28 pages).

I e

a L AW OFFICES I

ROGOVIN, HUGE & LENZNER A paortssioN AL CORPOmATION JAMES F. NE AL 873o RHoDE IsL AND AVENUE, N. W.

MITCHELL ROGOVIN WASHINGTON, D. C. 20o36 FERRY F.LENINER GEORGE T. FR AM PTON, JR.

JONATH AN 0.5CMILLER (20 0 466 6464 david R. BOYD RONNA LEC BECK TELEcopiER EUGENE J.COMEY vlCKl C.JACN50N (202) 466 6420 RRi$fA M.FOGLEMAN

$USAN L. CARNEY SAUL B. GOODM AN RANDALL LEE SPECn MICH AEL D. Lo*C Octcber 18, 1984 f,*3,',",',"[n[5 JEFFREY M. BL ATINER JAMES E.PFANDER Mr. J. M. Felton, Director g

EM Division of Rules and Records ACI REQUESI Office of Adminstration F DIA -v 4-%

United States Nuclear Regulatory d

h h k OS 7 Commission Washington, D.C.

20555 Re:

Freedom of Information Request

Dear Mr. Felton:

Pursuant to the Freedom of Information 5 U.S.C. 5522 and 10 C.F.R. Part 9, I hereby

Act, request copies of all records relating to the Ford Amendment Study performed by the Nuclear Regulatory Commisssion ("NRC") and by others at the behest of the NRC pursuant to the NRC Authorization Act for fiscal years 1982-83 (Public Law 97-415), Section 13 (the " Ford Amdendment").

This request encompasses, but is not limited to (1) all records of meetings, correspondence, notes, memoranda, investigations, observations and interviews relating in any way to authorization, investigation, data compilation, preparation, organization and presentation of the Ford Amendment Study Report; (2) all records of meetings, correspondence, notes, investigations, obervations and interviews memoranda, relating in any way to " case studies" of commercial nuclear power plant projects performed in preparation of the Ford Amendment Study Report; (3) all records of meetings, correspondence, notes, memboranda, investigations, observations and interviews arising out of the NRC " pilot program" performed pursuant to Section 13 (c) of the Ford Amendment, (4) all

[db f5 N N

i:

Mr. J. M. Felton, Director October 18, 1984 j

Page Two y

records of meetings, correspondence, notes, memoranda, investigations, observations, and interviews arising out of the NRC analysis of audits of nuclear power plant construction performed pursuant to Section d

13(b) of the Ford Amendment; (5) all records of meetings, correspondence, notes, memoranda, investiations, observations and interviews arising out of of the NRC analysis of the feasibility and benefits of a more prescriptive approach for defining principal architectural and engineering criteria performed pursuant to Section 13 (b) (1) of the Ford Amendment; (6) all records of meetings, correspondence, notes, memoranda, investiations, observations and interviews arising out of the review and analysis of the.NRC's organization, methods, and programs-for quality assurance performed pursuant to Section 13 (b) of the Ford Amendment; 17) all records of meetings, correspondence, notes, memoranda, investiations, observations and interviews arising out of the analysis of project, organizational and institutional issues associated with quality in i

nuclear power plant design and construction performed by Battelle Memorial Institute's Human Affairs Research Center; (8) all records of meetings, correspondence, notes, memoranda, investiations, observations and interviews arising out of a review I

of other selected programs for the assurance of quality performed using Pacific Northwest Laboratory I

as lead contractor; (9) all records of meetings, correspondence, notes, memoranda, investiations, observations and interviews arising out of the Advisory Committee on Reactor Safeguards, Associations of professionals and any others performed in preparation of the Ford Amendment Study Report; and (10) all records of meetings, correspondence, notes, memoranda, investiations, observations and interviews arising I

out of the establishment of a group of outside senior and expert consultants to provide individual comments i

on Ford Amendment. Study activities and findings.

l l

Y '.

Mr. J. M. Felton, Director October 18, 1984 Page Three I agree to pay the prescribed fees for locating and copying the records sought by this request.

Do not hesitate to contact me if you have any questions or~ comments.

Sincerely, 7

Randall L. Speck, Esq.

RSpeck: des