ML20134E049
| ML20134E049 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 10/24/1996 |
| From: | Wadley M NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9610310215 | |
| Download: ML20134E049 (1) | |
Text
)
[
Northern States Power Company Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch, Minnesota 55089 October 24,1996 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 72-10 SNM-2506 Change to NRC Distribution Lists for the Prairie Island Nuclear Generatina Plant Northern States Power (NSP) requests that distribution and service lists utilized by NRC personnel for transmittal of correspondence to NSP be modified. Due to organization changes, the position of Site General Manager at the Prairie Island Nuclear Generating Plant has been eliminated and the duties previously assigned to this position have been transferred to the Plant Manager.
To ensure proper dissemination of the necessary information internal to NSP, please replace " Site General Manager" with Plant Manager" on all applicable NRC distribution and service lists pertaining to the Prairie Island Nuclear Generating Plant and Independent Spent Fuel Storage Installation. Only the addressee need be changed, no change in the street address is required.
We appreciate your assistance in this manner. This letter contains no new NRC commitments. Please contact Gene Eckholt (612-388-1121) if you require any additional information.
m,uld &MC-Michael D Wadley 4g g
Plant Manager
/
Prairie Island Nuclear Generating Plant 310049 c: NRR Project Manager, NRC 9610310215 961024 PDR ADOCK 05000282 H
-