Text
. -
GENERAL OFFICE P.O. box 499. COLUMBUS, NEBRASKA 68602@99
{ Nebraska Public Power District
- %"xi3Fas%'"
G. R. HORN Senior Vice President, Energy Supply (402) 563-5518 NLS960201 October 28,1996 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:
Subject:
Response to NRC Generic Letter 96-06 Cooper Nuclear Station, NRC Docket 50-298, DPR-46
Reference:
- 1. NRC Generic Letter 96-06 dated September 30,1996," Assurance of Equipment Operability and Containment Integrity during Design-Basis Accident Conditions" This submittal provides the Nebraska Public Power District's (District's) 30 day response to NRC Generic Letter (GL) 96-06 (Reference 1).
The GL requires each addressee to indicate in the 30 day response:
1) whether or not the actions requested will be completed, 2) whether or not the information requested will be provided to the NRC, and 3) whether or not these actions will be completed within the requested time period.
Accordingly, the District will determine if:
Containment air cooler cooling water systems are susceptible to either waterhammer or two-phase flow conditions during postulated accident conditions.
Piping systems that penetrate the containment are susceptible to thermal expansion of fluid so that overpressurization of piping could occur.
Within 120 days of the <ha of this generic letter, the District will inform the NRC of the conclusions reached as a n:sult of the above determinations. For affected systems, the submittal will describe the specific circumstances involved. In addition to conclusions reached, the District will i.iclude the basis for continued operability of affected systems and components, as applicab13, and a summary of corrective actions taken or planned.
AO'7W I 9610310176 961029 PDR ADOCK 05000298 P
PDR wmcwy r
3 m
y ~y m w ~m w w y
. m y m~wn ykb:m?lp]d$a$hyb?r pr9)s$bh bylAU L az w w w w n.w wwutw t>
l* dkiU u d}.
ma.a g.
9 d
NLS960201 October 28,1996 Page 2 of 3 Should you have any questions concerning this matter, please contact me.
Sincerely, i
}
/
G-~--
G orn nio Vice President, Energy Supply
/crm ec: Regional Administrator USNRC - Region IV 4
Senior Project Manager USNRC - NRR Project Directorate IV-1 Senior Resident Inspector USNRC t
NPG Distribution 1
1 J
e s
l
d NLS960201 October 28,1996 Page 3 of 3 STATE OF NEBRASKA
)
)
PLATTE COUNTY
)
G. R. Horn, being first duly sworn, deposes and says that he is an authorized representative of the Nebraska Public Power District, a public corporation and political subdivision of the M._]
State of Nebraska; that he is duly authorized to submit this correspondence on behalf of Nebraska Public Power District; and that the statements contained herein are true to the best of his knowledge and belief.
U
/, w -
. R. Horn Subscribed in my presence and sworn to before me this M ay of bCOF,1996.
d GENERAL NOTARYState of N:bruka Il RITA L PFLASTERER
@ My Comm. Esp Dec.19,1999 NOTARYYUBLIC
l ATTACHMENT 3 LIST OF NRC COMMITMENTS l
s Correspondence No: NLS960201 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District. They are described to the NRC for the NRC's information and are not regulatory commitments.
Please notify the Licensing Manager at Cooper Nuclear Station of any questions'regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMENT OR OUTAGE The District will determine if containment air cooler cooling water systems are susceptible to either, waterhammer or two-phase flow conditions during postulated accident conditions, and if piping systems None.
that penetrate the containment are susceptible to thermal expansion of fluid so that overpressurization of piping could occur.
Within 120 days of the date of this generic letter, the District will inform the NRC of the conclusions reached as a result of the above determinations.
For affected systems, the submittal will describe the specific circumstances involved.
In addition to conclusions reached, the District will include the basis for January 28, 1997 continued operability of affected systems and components, as applicable, and a summary of corrective actions taken or planned.