0 W$LF CREEK NUCLEAR OPERATING CORPORATION Richard A. Muench Vice President Engineering 4
1 October 25, 1996 ET 96-0083 U.
S. Nuclear Regulatory Commission ATTN:
Document Control Desk Mail Station P1-137 Washington, D.
C. 20555
Reference:
NRC Generic Letter 96-06, dated September 30, 1996
Subject:
Docket No. 50-482:
Initial Response to Generic-Letter 96-06 1
Gentlemen:
j The reference involves NRC concerns wich equipment operability and containment 1
integrity during design-basis accident conditions.
The reference requested Licensees to provide two responses; one within 30 days, and another within 120 days, of the date of the reference.
The reference requested that the 30-day response indicate whether the requested actions will be completed, and whether the requested information will be submitted to the NRC within the requested time period.
This lettsr provides the requested 30-day response for the Wolf Creek Nuclear Operating Corporation (WCNOC).
The requested information is provided below.
The 120-day response requested will be submitted by January 28, 1997.
WCNOC is currently evaluating the reference for applicability to Wolf Creek Generating Station (WCGS), and has initiated actions to address the requests made in the reference.
WCNOC currently intends to complete the requested actions, and submit the requested information with our 120-day response by January 28, 1997.
However, WCNOC is pursuing a joint effort with Union Electric to complete the requested actions for both WCGS and the Callaway plant.
In addition, WCNOC intends to participate in the October 29,
- 1996, Generic Letter 96-06 Workshop, to be held in Dallas, Texas, for Licensee, NRC, and NEI personnel. Any work scope or schedule changes that result from either the joint effort or the workshop will be discussed in our 120-day response.
In the event that we are not able to complete the requested actions prior to January 28, 1997, WCNOC will submit as much of the requested information as we
)
have available at the time, along with a schedule for completion.
In this event, we will also provide in our response any alternative course of action that we intend to take to verify the operability of affected systems and components, including our basis for establishing the acceptability of the proposed alternative course of action and the basis for continued operability of affected systems and, components, as applicable.
9610310028 961025
(( I,
PDR ADOCK 05000482
(/
P PDR vv eu tsox 411/ t$urangton. KS 66839 / Phone; (316) 364 8831
-o An Equa! Opportunity Employer M F <HCVET
i j
1 ET 96-0003.
Page 2 of 2 If you have any questions concerning this response, please contact me at (316) 364-8831, extension 4034, or Mr. Terry S. Morrill at extension 8707.
Very truly yours, Richard A. Muench RAM /jad cc:
L.
J. Callan (NRC)
W.
D. Johnson (NRC)
J.
F.
Ringwald (NRC)
J. C. Stone (NRC) i l
. _ - ~.. ~. -~
i
!: c j
l l
STATE OF KANSAS
)
)
SS COUNTY.OF COFFEY
)
Richard A. Muench', of lawful age, being first duly sworn upon oath says that he is Vice President Engineering of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the content thereof; that he has executed that same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
i I
By Richard A. Muench i
Vice President Engineering l
SUBSCRIBED and sworn to before me this day of b6Eller,1996.