ML20134D464

From kanterella
Jump to navigation Jump to search
Forwards Predecisional Enforcement Conference Repts 50-373/96-15 & 50-374/96-15 on 960717-0820
ML20134D464
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/09/1996
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Subalusky W
COMMONWEALTH EDISON CO.
Shared Package
ML20134D467 List:
References
EA-96-325, NUDOCS 9610220272
Download: ML20134D464 (2)


See also: IR 05000373/1996015

Text

October 9, 1996

'

'

'LE-oI

EA 96-325

'

i

Mr. W. T. Subalusky

Site Vice President

LaSalle County Station

Commonwealth Edison Company

2601 North 21st Road

Marseilles, IL 61341

i

i

SUBJECT:

NRC PREDECISIONAL ENFORCEMENT CONFERENCE (REPORT NOS.

50-373; 50-374/96015 (DRP))

,

?

!

Dear Mr. Subalusky:

i

This refers to a Predecisional Enforcement Conference conducted by

Mr. A. Bill Beach, Regional Administrator, and other members of the Region III

,

t

staff on September 27, 1996. The subject of this conference was the

activities at your LaSalle County Nuclear Generating Station pertaining to the

potential common mode failure of the essential service water system due to

4

foam sealant injection into the service water tunnel. The activities

'

discussed included those related to apparent failure to:

(1) adequately

implement the maintenance program; (2) take adequate corrective actions (3)

perform adequate operability evaluations; (4) perform safety evaluations in

'

!

accordance with 10 CFR 50.59 for previously existing conditions; and (5)

j

maintain quality assurance records. This conference was closed to the public.

We have enclosed a report summarizing the discussion.

I

You will be notified by separate correspondence of our decision regarding the

enforcement action based on the information presented and discussed at the

,

i

conference. No response is required until you are notified of the proposed

enforcement action.

'

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

,

this letter and enclosed inspection report will be placed in the NRC Public

Document Room.

I

We will gladly discuss any questions you have concerning this conference.

?

Sincerely,

.

/s/ John A. Grobe for

James L. Caldwell, Acting Director

Division of Reactor Projects

Docket Nos:

50-373; 50-374

Enclosure:

Predecisional Enforcement Conference

'

Reports: 50-373; 50-374/96015 (DRP)

\\

See Attached for Distribution

l

FILE NAME: R:\\INSPRPTS\\ POWERS \\LASA\\LAS96015.DRP

See attached concurrences

To reestve e sepy of thle emessamet, indicate in the boa 'C' = Copy without attach / enc 1

"E' = Copy with attach /enet

  • N*

=

WFICE

DAP

DAP e

04P n

_

(IC o

/

. ..., 4tt hu

4....E

e.UE.

M4

I

-

c.

10/I/96

to/b

to/k/96

to/h/94

l

enir

0 0 4 i>,

0FFICIAL RECORD COPY

'

9610220272 961009

PDR

ADOCK 05000373

G

PDR

i

-

-

"

.

.

_ .

. - .

--

-

.

- - - -

.

.

..

. __ .__.

-

'

.

W. T. Subalusky

-2-

DISTRIBUTION

cc w/ encl:

D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear

Operating Officer

D. J. Ray, Station Manager

J. Burns, Regulatory Assurance

Supervisor

I. Johnson, Acting Nuclear

Regulatory Services Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce

Commission

Document Control Desk-Licensing

Distribution:

Docket File w/ encl

DRP w/enci

PUBLIC IE-01 w/ encl

RIII PRR w/enci

,

OC/LFDCB w/ encl

SRI LaSalle, Dresden,

CAAl w/ encl (E-mail)

Quad Cities w/ enc 1

Project Manager, NRR w/ encl

A. B. Beach, w/ enc 1

RACI (E-Mail)

W. L. Axelson, w/ encl

B. L. Burgess, w/ encl

J. Lieberman, OE w/ encl

J. Goldberg, 0GC w/ encl

R. Zimmerman, NRR w/ encl