ML20134D005

From kanterella
Jump to navigation Jump to search
Forwards Rev 14 to Training & Qualification (T&Q) Plan, Incorporating Corrections to Errors Found During Last NRC Security Insp as Well as Changing Classification of Training & Qualification Plan.Encl Withheld (Ref 10CFR2.790)
ML20134D005
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 01/30/1997
From: Wadley M
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9702040231
Download: ML20134D005 (2)


Text

_

~

Northern States Power Company Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch, Minnesota 55089 January 30,1997 10 CFR Part 50 Section 50.54(p)

U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 72-10 SNM-2506 Submission of Revision 14 to the PINGP Training & Qualification Plan Pursuant to 10 CFR Part 50, Section 50.54(p), we are submitting four copies of Revision 14 to the Prairie Island Training & Qualification (T&Q) Plan. This revision incorporates corrections to errors found during the last NRC Security inspection as weli as changing the classification of the T&Q Plan from " Safeguards" to "10CFR2.790".

d This letter also serves as an application to " withhold from public disclosure this T&Q Plan as described in 10CFR2.790(b)(1). This request is based on 10CFR2.790(d)(1) as this plan is associated with the security of the facility but is not safeguards.

Because this plan has been considered safeguards, and the NRC has not had an opportunity to review this application for 10CFR2.790 status, the attached document is marked as safeguards material and must be treated as such until downgraded. We plan to downgrade the plan to 10CFR2.790 on June 1,1997, therefore we request approval of this application by that time. At that time you will be sent a new copy of this

When Separated from Enclosure, Handle as Decontrolledi 970E040231 970130

~

p h.

PDR ADOCK 05000282 i

F PDR f

n i

e

USNRC NORTHERN STATES POWER COMPANY

=

January 30,1997 Page 2 plan for your records, without the safeguards markings, and you will be asked to destroy this copy.

i Until the application discussed above is approved, this Plan shall be considered to contain Safeguards Information as identified by the Commission in 10 CFR Part 73, Section 73.21. This Plan should not be made available for insoection and should not be olaced in the oublic document room.

Please contact Mike Sleigh (612-388-1121, Ext. 4069) if you have any questions related to this letter, kt Michael D Wadley

(~

Plant Manager

(

Prairie Island Nuclear Generating Plant c: Regional Administrator o gion 111, NRC (w/2 copies) e Senior Resident inspector, MRC (transmittal letter only)

NRR Project Manager, NRC (transmittal letter only)

J E Silberg (transmittal letter only)

Enclosure:

Prairie Island Training & Qualification Plan Revision 14

^ 1NVhen Separated from Enclosure,' Handle asLDecontrolled'-

!