ML20134C929

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-155/96-01 on 961019-1129 & Notice of Violation
Date released: 05/27/2020 Download: ML20134C929


Insp Rept 50-155/96-01 on 961019-1129.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support
ML20134C948
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 01/29/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
Download: ML20134C948 (21)
Notice of Violation from Insp on 961019-1129.Violations noted:961108 Operators Closed EC Number 1 Loop Inlet Valve (MO-7062) Making Number 1 EC Loop Inoperable & Operability Test Number 2 EC Loop Outlet Valve Not Performed within 1 H
ML20134C942
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 01/29/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
Download: ML20134C942 (3)
Forwards Insp Rept 50-155/96-01 on 961019-1129 & Notice of Violation
ML20134C927
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 01/29/1997
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: DONNELLY P M
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
Download: ML20134C927 (4)