ML20134C727

From kanterella
Jump to navigation Jump to search
Ltr Contract:Mod 3 to Task Order 1, Workshop on Radioactive Matls Regulation, Under Contract NRC-02-96-002
ML20134C727
Person / Time
Issue date: 01/30/1997
From: Mearse S
NRC OFFICE OF ADMINISTRATION (ADM)
To: Steve Ruffin
External (Affiliation Not Assigned)
References
CON-FIN-R-9309, CON-FIN-R-94096, CON-FIN-R-944096, CON-FIN-R-9509, CON-NRC-02-96-002, CON-NRC-2-96-2 NUDOCS 9702040021
Download: ML20134C727 (2)


Text

7 _

M

$@ RECy

/

UNITED STATES x

4 E

NUCLEAR REGULATORY COMMISSION o-If WASHINGTON. D.C. 20555-0001

\\.***

January-30. 1997 l

Enercorp Federal Services Corporation l

ATTN: Steve Ruffin President 414 Hungerford Drive. Suite 212 Rockville. MD 20850

Dear Mr. Ruf fin:

L l

Subject:

Modification No. 3 to Task Order No.1 - Incremental Funding Modification to Fully Fund Subtask 1.4. Entitled " Workshop on Radioactive Materials Regulation" Under Contract No. NRC-02-96-002 i

In accordance with Section G.4. Task Order Procedures, of the subject i

contract, this modification hereby obligates $24.883 to fully fund Subtask 1.4 and consequently Task Order No.1.

The total cost ceiling for the subject task order _ is $194.883. Of the

$194.883 cost ceiling. the amount of $180.448 represents the reimbursable costs. and the amount of $14.435 represents the fixed fee.

l l

The total amount obligated is hereby increased by $24.883 from $170.000 to

$194.883. Of the $194.883 obligated. $180.448 represents the reimbursable costs, and the amount of $14.435 represents the fixed fee.

A summary of funds obligated to date, including this modification is as -

follows:

Basic T.O. #1 Mod. 1 to T.O. #1 Mod.' 2 to T.O. #1 i

Subtasks 1.1 and 1.2 Subtask 1.3 Subtasks 1.3 and 1.4 B&R No.*

67F ~'-700-000 67M-50-700-000 77M-60-817-202 FIN No..

R9 R944096 R9309 APPN No.

31LO. 67M 31X0200.67M 31X0200 FFS:

5096R036 5096R036 5097R017 OBLIGATED:

578.574

$21.426

$70,000 Mod. 3 to T.O. #1 Subtask 1.4 Ob($

B&R No.

77M-40-022-000 FIN No..

R9509 V

r APPN No.

31X0200 i

FFS:

5097R028 i

l OBLIGATED:

$24.883 TOTAL OBLIGATED:

$194.883 i

9702040021 970130 i

PDR CONTR j

NRC-02-96-OO2 PDR j 040001

y 7 -

Enercorp l The obligated amount will cover performance of work under Task Order No.1 through its expiration date of February 18. 1997.

All other terms and conditions under this Task Order remain unchanged.

Sincerely.

ls

/

f,2hb _

'((/, m%

[haron D. Mearse. Contracting Officer Technical Acquisition Branch No. 1 Division of Contracts l

Office of Administration

!