ML20134C718

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 70-1257/97-01 Conducted 970106-10 & Notice of Violation
ML20134C718
Person / Time
Site: Framatome ANP Richland
Issue date: 01/30/1997
From: Scarano R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Femreite B
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
Shared Package
ML20134C722 List:
References
NUDOCS 9702040018
Download: ML20134C718 (3)


Text

'

[O pt># %g UNITED STATES

.,D

  • It NUCLEAR REGULATORY COMMISSION REGloN IV k*4

\ p 611 RYAN PLAZA drive. SulTE 400 AR LINGToN, TEXAS 760118064 9*****+0 January 30, 1997 B. N. Femreite, Vice President Engineering and Manufacturing Siemens Power Corporation 2101 Horn Rapids Road P.O. Box 130 Richland, Washington 99352-0130 SUBJEC'i: NRC INSPECTION REPORT 70-1257/97-01 AND NOTICE OF VIOLATION

Dear Mr. Femreite:

An NRC inspection was conducted January 6-10,1997, at your Siemens Power Corporation facility. The enclosed report presents the scope and results of that inspection.

During the inspection, your conduct of activities at the Siemens facility was generally characterized by implementation of effective programs in the areas of management organization and controls, operator training and qualification, and operations. However, one violation was identified involving the failure to follow the engineering change notice process for a fieh modification. This matter is of concern because the field change resulted in an air sampling system being unable to perform its intended function during a loss of normal electrical power.

This violation is characteristic of one of the challenges identified by the NRC in the Licensee Performance Review documented in a letter to you dated May 23,1996,and discussed la 3 meeting on June 18,1996. This challenge recognized the need for

" continued management emphasis to assure proper implementation of the engineering change notice (ECN) process...." Further, our review of your incident investigation Board report on the fire at the test f acility identified a missed opportunity for the incident Investigation Board to have identified the violation. Specifically, although your investigation identified that the controller for the air sampling vacuum pumps was not connected to the emergency power system as envisioned, the root cause of this matter was not surfaced. We bring these matters to your attention to emphasize the need for l continued management oversight of the ECN process and to urge full exposition of all issues identified during your incident Investigation Board deliberations.

The violation is cited in the enclosed Notice of Vio!ation (Notice) and the circumstances surrounding this violation are described in detailin the enclosed report. Please note that you are required to respund to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. The NRC will use your response, in part, to determine whether further enforcement action is necessary to ensure compliance with f regulatory requirements. l

\

9702040018 970130 PDR C

ADOCK 07001257 PDR /N /

j

.- -. __- _ - . . ~. - - . . .._ -_ . .___. . . . - . . _ . .- .._.

a .

Siemens Power Corporation January 30, 1997 i

l I

in accordance with 10 CFR 2.790 of the NRC's ' Rules of Practice," a copy of this lette.r, l

, its enclosures, and your response will be placed in the NRC Public Document Room (PDR).

l To the extent possible, your response should not include any personal privacy, proprietary, j

or safeguards information so that it can be placed in the PDR without redaction.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, Ross A. Scarano, Director Division of Nuclear Materials Safety Docket No.: 70-1257 License No.: SNM-1227

Enclosures:

1. Notice of Violation
2. NRC Inspection Report 70-1257/97-01 cc w/ enclosures:

L. J. Maas, Manager Regulatory Compliance .

Siemens Power Corporation

2101 Horn Rapids Road P.O. Box 130 Richland, Washington 99352-0130 State of Washington r

1 Siemens Power Corporation -3 January 30, 1997 Distribution w/ encl:

2 DMB (IE07)

DJWeiss, OC/LFDCB (T-9E10)

LJCallan RAScarano CLCain

LLHowell

. KEPerkins l 'CAHooker i

  • MIS System 4 *WCFO File
NMI&FC/DB DMCollins, Ril l GLShear, Rill l MFWeber, FCLB/NMSS (8D3)
KJHardin, FCLB/NMSS (8A3) j PTing, FCOB, NMSS (8A13)
  • w/lFS Form

}

i i

i 4

1 1

7 ,

4 1 I

a I

fe

' l DOCUMENT NAME: G:\SPC9701.CAH  !

To receive copy of doeurynt, indicate in box: "C" = Copy without enclosures "E" = Copy wdh enclosure,s,"N" = No copy RIV:WCFO:MBJ .- RIV:WCFO:MBl @ ADD:DNMS l D,: D N M S' ,g l 4 CAHooker (Jfv FAWenslawski geW CLCain / RAScararetT"' l j 1/J0/97 1/3097 1/ /97f 1/A/97 OFFICIAL RECORITCOPY 4

l

.