September 17,'1996
.
<
i
Mr. William T. Subalusky, Jr.
,
1
Site Vice President
-
'
LaSalle County Station
.
Commonwealth Edison Company
L
'
2601 North 21st Road
!
Marseilles, IL 61341
.
SUBJECT: NRC INTEGRATED INSPECTION REPORT 50-373/374/96006(DRP) AND
!
,
Dear Mr. Subalusky:
i
From May 25 through June 22, 1996, the NRC performed an integrated team
inspection at your LaSalle facility. The enclosed report presents the results
i
of_that inspection.
i
Based on the results of this inspection, the NRC has determined that one
>
j
violation of NRC requirements occurred. This violation is cited in the
'
i
enclosed Notice of Violation (Notice) and the circumstances surrounding it are
i
described in detail in the enclosed inspection report. This violation was of .
'
concern because. operations department management directed that the containment
i
post-accident hydrogen / oxygen (H,/0,) monitors be routinely operated in a
i
manner not contemplated in, station procedures and not as described in the
!
In' addition, we are concerned that two previous violations also
pertained to operating in a manner different from described in the UFSAR, and
they-likewise lacked a documented basis for determining that the change did
not involve an unreviewed safety question.
You are required to respond to this letteF and should follow the instructions
j
specified in the enclosed Notice when preparing your response. After
'
reviewing your response to this Notice, including your proposed corrective
. actions and the results of future inspections, the NRC will determine whether
further NRC enforcement action is necessary to ensure compliance with NRC
regulatory requirements.
I
1
i
\\
\\
9609270362 960917
\\
ADOCK 05000373
g
-
'
.
.
W. T. Subalusky, Jr.
-2-
In accordance with 10 CFR 2.790 of the NRC':: " Rules of Practices," a copy of
this letter, its enclosure, and your response will be placed in the NRC Public
Document Room (PDR).
Sincerely,
Onginal signed by John A. Grobe
James L. Caldwell, Acting Director
j
Division of Reactor Projects
i
Docket Nos:
50-373; 50-374
)
License Nos:
Enclosures:
,
.
1.
l
2.
Inspection Report
No. 50-373/374/96006
j
!
cc w/ encl:
D. A. Sager, Vice President,
!
Generation Support
,
H. W. Keiser, Chief Nuclear
'
Operating Officer
D. J. Ray, Station Manager
l
J. Burns, Regulatory Assurance
Supervisor
,
D. Farrar, Nuclear Regulatory
,
Services Manager
i
Richard Hubbard
Nathan Schloss, Economist
Office of the Attorney General
4
1
State Liaison Officer
l
Chairman, Illinois Commerce
Commission
Document Control Desk-Licensing
j
Docket File w/ enc 1
DRP w/ encl
PUBLIC IE-01 w/ encl
RIII PRR w/enci
'
OC/LFDCB w/ enc 1
W. L. Axelson, RIII w/ enc 1
.
SRI LaSalle, Dresden,
IPAS (E-Mail) w/enci
!
Quad Cities w/enci
RMB/ FEES w/o enc 1
j
Project Manager, NRR w/ encl
A. B. Beach, w/ encl
l
RACI (E-Mail)
B. L. Burgess, w/enci
!
File
R:
g
.Name:. ,, ., .\\.IN.SPRPTS\\..P.O..W..ERS\\.LASA\\LAS96006 DRP
.
-s .
.
6.
. c - c , .
. .ss mi i
- c.,, . in .tt.enf
i i. -
C-
d
0FFICE
RIII
C
RIII _
RIII
3
NAME
M.McBargeIlN Jorgk$n
Caldwe1Ifq/ hie
f
DATE
09/ 3 /96
09/03/96
09/lb /96 /
3
0FFICIAL RECORD COPY
l
,
j
i
i
o
!
1