Text
o
r.
'
s
Septenber 16, 1996
.
Georgia Power Com)any
!
ATfN: Mr. C. K.
icCoy
Vice President
Vogtle Electric Generating Plant
P. O. Box 1295
i
Birmingham, AL 35201
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-424/96-09, 50-425/96-09
j
!
Dear Mr. McCoy:
On August.17. 1996, the NRC completed an inspection at your Vogtle Units 1 and
2 reactor facilities.
The enclosed report presents the results of that
inspection.
During the six-week period covered by this inspection report, your conduct of
activities at the Vogtle facility was generally characterized by safety-
conscious operations, sound engineering and maintenance practices, and
appropriate radiological work controls.
However, two violations were
identi fied. We are concerned with the violation involving an impro)erly
positioned containment isolation valve.
Though the valve was operaale, the
issue represents'another example of configuration control problems.
Additional management focus in this area is warranted.
These violations are cited in the enclosed Notice of Violation (Notice): and
the circumstances surrounding the violations are described in detail in the
enclosed report.
Please note that you are required to respond to this letter
and should follow the instructions specified in the enclosed Notice when
preparing your. response. The NRC will use your response, in part, to
determine whether further enfo. ' ment action is necessary to ensure compliance
j
with regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of
this letter, its enclosures, and any reply will be placed in the NRC Public
Document Room.
i
Sincerely,
1
(Original signed by Pierce H.-Skinner)
'
Pierce H. Skinner. Chief
r
9609270267 960916
Reactor Projects Branch 2.
4
ADOCK 0500
4
$DR
Division of Reactor Projects
l-
I
Docket Nos.
50-424 and 50-425
6
4
License Nos. NPF-68 and NPF-81
V
\\
Enclosures: Notice of Violation
Inspection Report 50-424/96-09. 50-425/96-09
cc w/encls:
(See page 2)
g8 Ol
.
. .k
GPC
2
cc w/encls-
J. D. Woodard
Senior Vice President
Georgia Power Company
P. O. Box 1295
Birmingham, AL 35201
J. B. Beasley
General Manager, Plant Vogtle
Georgia Power Company
P. O. Box 1600
Waynesboro, GA 30830
J. A. Bailey
Manager-Licensing
,
Georgia Power Company
P. O. Box 1295
Birmingham, AL 35201
Jim Hurt, Director
Consumers' Utility Counsel Division
Governor's Office of Consumer Affairs
2 M. L. King, Jr. Drive
Plaza Level - East: Suite 356
Atlanta, GA 30334-4600
Office of Planning and Budget
Room 615B
270 Washington Street, SW
Atlanta, GA 30334
Office of the County Commissioner
Burke County Commission
Waynesboro, GA 30830
Harold Reheis. Director
Department of Natural Resources
205 Butler Street, SE, Suite 1252
Atlanta, GA 30334
Thomas Hill, Manager
Radioactive Materials Program
Department of Natural Resources
4244 International Parkway
Suite 114
Atlanta, GA 30354
cc w/encls cont'd:
(See page 3)
1
.
,,i
-
GPC
3
cc w/encls:
Continued
Attorney General
Law Department
132 Judicial Building
Atlanta, GA 30334
Thomas P. Mozingo
,
Manager of Nuclear Operations
'
Oglethor)e Power Corporation
2100 E.
Exchange Place
Tucker GA 30085-1349
Charles A. Patrizia. Esq.
Paul. Hastings, Janofsky & Walker
10th Floor
1299 Pennsylvania Avenue
Washington. D. C.
20004-9500
Distribution w/encls:
P. Skinner. RII
R. Wright. RII
W. P. Kleinsorge. RII
G. Hallstrom. RII
,
L. Wheeler. NRR
PUBLIC
NRC Senior Resident Inspector
U.S. Nuclear Regulatory Commission
8805 River Road
Waynesboro. GA 30830
1
1
0FFICE
Pff-DDS
a
Pff DD9
Rff DDP
Dif DDP
pff DDP
Rf!h00P
h
M
$1GNATURE
NAME
einsorge:dka{pffC>ou
Carrion
MWi$iann
C0gle
RWrigt h
DATE
09 / / 3 / 96
09 / / I
y / G5
09 /
/ 96
09 /
/ 96
09 / h / 96
/ 96
09 / f'f
f
COPY?
YES
NO
YES
NO
YES
(N0/
YES
NO
YES
NO
/t5)
NO
off-Oppb
OFFirE
SIGNATURE
NAME
PSkir n
\\
DATE
fN
/ 96
09 /
/ 96
09 /
/ 96
09 /
/ 96
09 /
/ 96
09 /
/ 96
COPY?
{ kES}
NO
YES
NO
YES
' NO
YES
NO
YES
NO
YES
NO
OrrICIAL istLund COP (
00CUMthI NAMt: A:\\V96-09
i
i
i
_
.______.m_____.__..._.
. _ . . _ . _
_ . _ . .
. _ _ _ _ _ _ _
_ _ _ _
09-16-199G 00 35AM
USNRC UGGTLE SITE
706 554 9548
P.01
j
.
i
l
1
.z. i
!
3
)
I
w/encls: Continued
7
ttorney General
"
.
l
Law Department
..
I
132 Judicial Building
l
Atlanta. GA 30334
-- -
~- -
l
CPTGAL FQRW M (f 90)
l
Thomas P. Mozingo
FAX TR AN!IMITTAL
e e p.e
{
.
"
'
.
Manafer of Nuclear Operations
MR/M
- MM
f
i
7
l
1e hor m Power Corporation
,
l
b5
u e
,,
, ,
>
t.
I
Charles A. Patrizia, Esq.
'* ~-* ' re
sa$-*
- = = = = = * =
~
l
Paul. Hastings, Janofsky & Walker
--
10th Floor
73
t
l
1299 Perinsylvania Avenue
.'t
l
Washington, D. C.
20004-9500
.,
'
list- bution w/encis:
l
). Sc nner, RII
'i
i
R. Wright. RII
1
-
'
W. P. Kleinsorge. RII
G. Ha11strom. RII
.
'
L. Wheeler, NRR
l
PUBLIC
, .;
,
l
NRC Senior Resident Inspector
1
i
U.S. Nuc1 car Regulatory Comission
-
!
8805-River Road
-Qc
!
Waynesboro, GA 30830
$
l
h
.
S
'
l
Grftri
aff sat
af f tiet
ktt na
at t .h k
af tenas
/,att,nas
e
h
SlallAfWRf
A
-"
?'
l
W
.
.
'E
m.i,0,
...
e.,,
M*t
09 /
/ 96
09 /
/ 96
CD /
/N
Ok/hN
09 //3 /Ji
09 I
IW
'
erster
tit nar
l
_$1GIATUIE
tipeg
P5kimer
l
Mt
1%
HI
1%
NI
IN
HI
IN
09 1
IN
%/
IN
{
CUPYi
YE5
No
YL5
no
Yt3
2
YE5
No
Yt3
up
713
E
-
i
UFF10L L HLLUMI) LurY
DOU,rt.El IW .'. A:\\VM-09
,-
l
)
j
.
<
'
!
)
h
i
(
[
TOTAL P.01
]
j
"
__.
_
__