Summary of 960904 Meeting W/Licensee & NRC to Discuss Status of & Issues Re License Renewal
ML20134C170
Person / Time
Site: Framatome ANP Richland
Issue date: 09/19/1996
From: Adams M
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Pierson R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 9609250318
Download: ML20134C170 (3)


Text

. -

f ". %

g t

UNITED STATES s

j NUCLEAR REGULATORY COMMISSION

^

2 WASHINGTON, D.C. enana anni

\\,,,g /

September 19, 1996 MEMORANDUM TO:

Robert C. Pierson, Chief i

Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS THRU:

Michael Tokar, Section Chief i

Licensing Section 2 A

i Licensing Branch Division of Fuel Cycle Safety and Safeguards, MSS LicensingSection2gi h

FROM:

Mary Adams 0///f[7h j

Licensing Branch Division of Fuel Cycle Safety l

and Safeguards, NMSS i

l

SUBJECT:

MEETING SUMARY, SEPTEMBER 4,1996, WITH JIM EDGAR OF SIEMENS POWER CORPORATION.

l i

3 i

Mr. James Edgar, Staff Engineer, Licensing, from Siemens Power Corporation

)

j (SPC) met with Licensing Branch staff Mary Adams, Mike Lamastra, and Ed Flack to discuss the status of and issues related to the license renewal.

Items l

discussed included the following:

1.

SPC anticipates being able to relinquish possession of 35 drums of plutonium waste, which has been in storage at the Richland plant for l

i several years, to the Department of Energy for disposal on the Hanford i

Reservation. NRC staff discussed what amendments to the license would 1

be necessary to perform the removal operations and to remove the authorization to possess plutonium waste from the license. No schedule was predicted for submittal of an amendment application, because the agreement with DOE is not finalized yet.

i

2..

The Lagoon Uranium Recovery and Solids Processing Facility (LUR/SPF) i amendment application has been received, but NRC staff do not believe that the amendment can be completed in time to include with the license renewal. Mr. Edgar indicated that it would be acceptable to SPC to process the amendment after the license is renewed.

3.

The modular extraction / recovery facility (MERF) amendment application has also been received, but, like the LUR/SPF amendment, it will not be reviewed until after the license is renewed.

This is also acceptable to j

SPC.

flFC6'fo on

~v003u, hh 9609250318 960919 i

PDR ADOCK 07001257 C

PDR

o Robert C. Pierson 2

4.

SPC will reprint the renewal application with one date on all pages, and submit it sometime in September. Then the renewed license can refer to a renewal application with one date.

5.

NRC staff discussed NRC's opposition to the use of new ICRP models for determining compliance with 10 CFR Part 20 ALI and DAC limits.

SPC uses the models on which 10 CFR Part 20 is based, but was anticipating using new ICRP models as soon as the industry develops applicable computer software. NRC staff stated that a rule change or other generic NRC policy statement was necessary before licensees could change to new models. NRC staff also suggested that the fuel industry petition for a rulemaking to allow use of the new models.

6.

NRC staff also discussed proposed license conditions that have been recommended by staff in the draft Safety Evaluation Report. Mr. Edgar agreed to make several changes in the renewal application that may make the license conditions unnecessary, such as removing the authorization to possess uranium compounds at greater that 5 weight percent enrichment and other references to greater enrichment, removing the authorization to adjust DACs based upon model changes, and committing to submit the remainder of the criticality safety analysis (CSA) summaries on a schedule.

Docket 70-1257 License SNM-1227 cc:

Mr. L. J. Maas Manager, Regulatory Compliance Siemens Power Corporation 2101 Horn Rapids Road Richland, Washington 99352-0130 Distribution Docekt 70-1257 PUBLIC NRC File Center FCSS R/F FCLB R/F NHSS R/F Region IV CHooker, RIV

[G:\\ sept 4 meet.mta]

0 C

0FC FCLB

(

FCLB FCLB,,

FCLB C.

hilB NAME MAdamsl'I@

PShea

/}'/M$Larla's'tra Nk MTM7 DATE 9//h/96 9/ /h9d 9/r( /96 9/ /? 96 9/

/96

/

C = COVER E = COVER & ENCLOSURE N = NO COPY 0FFICIAL RECORD COPY l

d Robert C. Pierson i

4.

SPC will reprint the renewal application with one date on all pages, and submit it sometime in September.

Then the renewed license can refer to a renewal application with one date.

5.

NRC staff discussed NRC's opposition to the use of new ICRP models for determining c g liance with 10 CFR Part 20 ALI and DAC limits.

SPC uses the models on dich 10 CFR Part 20 is based, but was anticipating using new ICRP models as soon as the industry develops applicable computer software. NRC staff stated that a rule change or other generic NRC policy statement was necessary before licensees could change to new models. NRC staff also suggested that the fuel industry petition for a rulemaking to allow use of the new models.

6.

NRC staff also discussed proposed license conditions that have been recommended by staff in the draft Safety Evaluation Report. Mr. Edgar agreed to make several changes in the renewal application that may make the license conditions unnecessary, such as removing the authorization to possess uranium compounds at greater that 5 weight percent enrichment and other references to greater enrichment, removing the authorization to adjust DACs based upon model changes, and committing to submit the remainder of the criticality safety _ analysis (CSA) summaries on a schedule.

Docket 70-1257 License SNM-1227 l

cc: