ML20134C045
| ML20134C045 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 09/19/1996 |
| From: | Link B WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| VPNPD-96-070, VPNPD-96-70, NUDOCS 9609250113 | |
| Download: ML20134C045 (2) | |
Text
-
t e
Wisconsin Electnc POWER COMPANY 231 W Michgan. PO Bos 2046, Mdwoukee WI 53201-2046 (414)221 2345 VPNPD-96-070 September 19,1996 Document Control Desk US NUCLEAR REGULATORY COMMISSION Mail Station Pl-137 Washington, DC 20555-0001 Ladies / Gentlemen:
i DOCKETS 50-266 AND 50-301 l
SUPPLEMENTAL RESPONSE TO NRC BULLETIN 96-01 CONTROL ROD TEST DATA FROM UNIT 1 OUTAGE UIC23 POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 At the verbal request of NRC's Margaret Chatterton, we submit the following end-of-cycle control rod data from tests conducted during Unit 1 outage UlR23. This data supplements that data submitted May 22,1996, in our letter VPNPD-96-033.
If you have any questions, please contact Bill Hennessy at (414)755-6573.
Sincerely,
/
k Bob Link i
Vice President Nuclear Power GDA Attachment cc:
NRC Resident inspector
- NRC Regional Administrator, Region III Public Service Commission of Wisconsin (Attn: Paul Kitzenbel) fhY)j o
9609250113 960919 PDR ADOCK 05000266 P'
PDR A sukskihyafhvnsm Exqv Ovprvatim
1 Sheeti l
j 6
i POINT BEACH UNIT 1 - CYCLE 23 CORE RCCA F/A EOL ROD l LOCATION ID ID DROP TIMES (sec)
G7 R89 Y11 1.41 K7 0
1.5 C7 R143 ZO9 1.45 G11 R504 Z11 1.36 H8 R108 Z13 1.38 F8 R97 Z24 1.36 H6 R96 Z28 1.38 F6 R125 Z18 1.36 J10 R102 AA25 1.32 i
D10 R136 AA16 1.37 D4 R104 AA15 1.3 J4 R105 AA23 1.35 15 R137 AA13 1.35 19 R131 AA24 1.33 E9 R92 AA18 1.37 E5 R86 AA28 1.31 C9 R129 BB16 1.35 13 R147 BB19 1.44 11 1 R94 BB13 1.34 K5 R99 BB20 1.38 E3 R146 8817 1.33 E11 R124 BB18 1.36
)
C5 R25 BB14 1.29 K9 R101 BB15 1.33 H12 R106 BB21 1.33 B6 R87 BB22 1.3 F12 R91 BB26 1.34 L8 R95 BB23 1.32 F2 R100 BB25 1.31 B8 R140 BB24 1.34 L6 R85 BB28 1.36 H2 R132 BB27 1.32 Page 1