Requests Summary Description of GL 96-05 Program at 180 Days After Issuance of GL Unless Licensee Specifically Requests Extended Schedule
ML20134B383
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/24/1997
From: Dromerick A
NRC (Affiliation Not Assigned)
To: Cruse C
BALTIMORE GAS & ELECTRIC CO.
References
GL-96-05, GL-96-5, TAC-M97028, TAC-M97029, NUDOCS 9701300067
Download: ML20134B383 (3)


Text

y y;

U E

4.

January 24, 1997

.(,

a Mr.iCharles H. Cruse' Vice President;. Nuclear Energy.

Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant 1650 Calvert-Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

180-DAY.

SUMMARY

DESCRIPTION RESPONSE TO GENERIC LETTER 96-05,

'" PERIODIC VERIFICATION OF DESIGN BASIS CAPABILITY OF SAFETY-RELATED MOTOR-0PERATED VALVES (TAC NOS. M97028 AND M97029)

Dear.Mr. Cruse:

By letter dated November 15,.1996, you advised that your program which periodically verifies that safety-related motor-operated valves are capable of performing-their safety and current licensing basis functions is currently being revised.

You further stated that the revised program will meet the

-requested actions of Generic Letter (GL) 96-05, and will ensure that changes in required performance resulting from degradation (such as those. caused by

age) can be properly identified and accounted for. Baltimore Gas and Electric Company (BGE) currently expects to implement this program by March 17, 1997.

'It is not clear that a 180-day response to GL 96-05 would include the 4

requested summary of your periodic verification program. The staff requests l

that BGE provide a summary description of your GL 96-05 program at 180 days after issuance of the GL unless BGE specifically requests an extended schedule.

e

[i.

Sincerely, jgj JAlexander W. Dromerick, Senior Project Manager

(

Project Directorate I-1 Division of Reactor Projects - I/II

~

r i i

(Office lof Nuclear Reactor Regulation y

Docket Nos. 50-317-

[

.and 50-318 i i

s.

cc:

See next page p

^

DISTRIBUTION:t

a L

' Docket / File ;' s SBajwa LDoerflein, RI PUBLIC-

/

Slittle.

AHanson

$h % hhh hf l

PDI-l Reading /

ADromerick l

(

'f SVarga.

0GCo -'

1'ACRS

  • See' previous concurrence DFOI i o JZwolinskii
DOCUMENT NAME
-CCM97028.LTR' To receive a copy of.this document, indli:at's.in the box:

"C" - Copy without attachment / enclosure

("E" - Copy,with attachment / enclosure "N" - No copy 0FFICE PN M I 1_./ f'/. IE LA: POI 1 M )

l NER/DE/EMEB*

l D:P0!ai

,,A l

l mAME esd.iKkidir atittietAJ '

aw n

seeJwe //oF C DATE 01 M L97 01//h/97 01/24/97 01/ f(y97 01/ /97 Official Record Copy I

9701300067 970124 PDR ADOCK 05000317 P

PDR

~ -- -.-

p*CEto p

UNITED STATES T

4 S

NUCLEAR REOULATORY CCMMISSION O

WASHINGTON, D.C. SoseH001 k.....

January 24, 1997

~

Mr. Charles H. Cruse Vice President - Nuclear Energy Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant i

1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

180-DAY SIMiARY DESCRIPTION RESPONSE TO GENERIC LETTER 96-05,

" PERIODIC VERIFICATION OF DESIGN BASIS CAPABILITY OF SAFETY-RELATED MOTOR-0PERATED VALVES (TAC NOS. M97028 AND M97029)

(

Dear Mr. Cruse:

By letter-dated November 15, 1996, you advised that your program which periodically verifies that safety-related motor-operated valves are capable of performing their safety and current licensing basis functions is currently i

being revised.

You further stated that the revised program will meet the.

requested actions of Generic Letter (GL) 96-05, and will ensure that changes i

in required performance resulting from degradation (such as those caused by age) can be properly identified and accounted for. Baltimore Gas and Electric Company (BGE) currently expects to implement this program by March 17, 1997.

1 It is not clear that a 180-day response to GL 96-05 would include the i

requested summary of your periodic verification program.

The staff requests that BGE provide a summary description of your GL 96-05 program at 180 days after issuance of-the GL unless BGE specifically requests an extended i

schedule.

Sincerely, Y

0*%8M Alexan er W. Dromerick, Senior Project Manager Project Directorate I-l Division of Reactor Projects - I/II j

Office of Nuclear Raactor Regulation Docket Nos. 50-317 i

i and 50-318 cc:

See next page 2

4*

1 Mr. Charles H. Cruse Calvert Cliffs Nuclear Power Plant U

Calvert Cliffs Nuclear Power Plant Unit Nos. I and 2 cc:

i President Mr. Joseph H. Walter, Chief Engineer Calvert County Board of Public Service Commission of Commissioners Maryland 175 Main Street Engineering Division Prince Frederick, MD 20678 6 St. Paul Centre Baltimore, MD 21202-6806

)

D. A. Brune, Esquire General Counsel Kristen A. Burger, Esquire Baltimore Gas and Electric Company Maryland People's Counsel P.O. Box 1475 6 St. Paul Centre Baltimore, MD 21203 Suite 2102 Baltimore, MD 21202-1631 Jay E. Silberg, Esquire Shaw, Pittman, Potts, and Trowbridge Patricia T. Birnie, Esquire 2300 N Street, NW Co-Director Washington, DC 20037 Maryland Safe Energy Coalition P.O. Box 33111 Mr. Terrence J. Camilleri, Director, Baltimore, MD 21218 NRM Calvert Cliffs Nuclear Power Plant Mr. Larry Bell 1650 Calvert Cliffs Parkway

. NRC Technical Training Center Lusby, MD 20657-47027 5700 Brainerd Road Chattanooga, TN 37411-4017 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 287 St. Leonard, MD 20685 Mr. Richard I. McLean Administrator - Radioecology Dapartment of Natural Resources 580 Taylor Avenue Tawes State Office Building, B3 Annapolis, MD 21401 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

_ _., _