ML20134B040
| ML20134B040 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/20/1997 |
| From: | Jeffery Wood CENTERIOR ENERGY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20134B042 | List: |
| References | |
| 2393, NUDOCS 9701290233 | |
| Download: ML20134B040 (2) | |
Text
a -
t CENTEREOR ENERGY 5501 N State Route 2 419-249-2300 John K. Wood O@ Harbor, OH 43449 FAX: 419-3218337 Vce Presideril-Nuclear Davis-Besse Decket Number 50-346 License Number NPF-3 Serial Number 2393 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
Proposed Modification to the Davis-Besse Nuclear Power Station Unit 1 Facility Operating License NPF-3 Appendix A, Technical Specifications for Conversion to a 24 Month Fuel Cycle Ladies and Gentlemen:
Enclosed is an application for an amendment to the Davis-Besse Nucledr Power Station (DBNPS), Unit Number 1, Operating License Number NPF-3, Appendix A, Technical Specifications. The proposed changes involve:
Technical Specification (TS) 3/4.5.2, ECCS Subsystems - T avg > 280'F; TS 3/4.5.3, ECCS Subsystems - T avg < 280*F; TS 3/4.7.1.2, Auxiliary Feedwater System; TS 3/4.7.1.7 Motor Driven Feedwater Pump System; TS 3/4.7.3.1, Component Cooling Water System; and TS 3/4.7.4.1, Service Water System.
The proposed changes would modify the presently specified 18 month surveillance frequencies in TS Surveillance Requirement (SR) 4.5.2.d.2.a, SR 4.5.2.e, SR 4.5.2.g.2, SR 4.5.3, SR 4.7.1.2.1.c, SR 4.7.1.7.d, SR 4.7.3.1.b, and SR 4.7.4.1.b to new specified frequencies of once each Refueling Interval. These changes are in accordance with the NRC guidance provided by Generic Letter 91-04, " Changes in Technical Specification Surveillance Intervals to Accommodate a 24-Month Fuel Cycle," and will support conversion of the DBNPS from an 18 month to a 24 month fuel cycle.
The LL PS is commencing longer fuel cycles during the current cycle 11.
This license amendment application is one of several applications which will be submitted in support of the 24 month fuel cycle conversion. These applications are being submitted to the NRC as a Cost Beneficial Licensing Action. As will be demonstrated in each license amendment application, the proposed changes will not adversely impact safety. The proposed changes will provide an estimated cost savings of $24 million over the DBNPS's I
I l
remaining operating life.
h
/
9701290233 970120 PDR ADOCK 05000346 P
_-,._____.m
.m
~=
s Docket Numbar 50-346 Licansa Number NPF-3 Sarial Number 2393 Page 2 1
1 This amendment application includes a proposed change to Surveillance Requirement (SR) 4.5.2.d.
Several additional license amendment applications scheduled to be submitted to the NRC, License Amendment J
Requests (LAR) 95-0019, 95-0024, and 95-0027, also affect SR 4.5.2.d.
Therefore, Toledo Edison requests that these amendments be issued together by the NRC, by December 5, 1997.
l t
Should you have any questions or require additional information, please contact Mr. James L. Freels, Manager - Regulatory Affairs, at (419) 321-8466.
very truly yours, l b -~~
l} ?bG tt J
K laj f
Enclosure 1
I cc:
A. B. Beach, Regional Administrator, NRC Region III A. G. Hansen, NRC/NRR Project Manager l
S. Stasek, NRC Region III, DB-1 Senior Resident Inspector J. R. Williams, Chief of Staff, Ohio Emergency Management Agency, State of Ohio (NRC Liaison) i Utility Radiological Safety Board
?
?
l l
l l
l 1
I i
i I
l l
l t
1 l
i i
I i
i i
v-w-
r-- - -. -,
-~n m
-v--
9 -. - - - - --
.