Summary of 851016-17 Meetings W/Util,Ebasco,Southern Co Svcs,Troutman,Sanders,Lockerman & Ashmore,Comex & S&W in Bethesda,Md Re Emergency Plan & Emergency Action Levels.List of Participants Encl
ML20134A505
Person / Time
Site: Vogtle  
Issue date: 10/28/1985
From: Mark Miller
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8511070159
Download: ML20134A505 (5)


Text

.

October 28, 1985 Docket Nos: 50-424 and 50-425 APPLICANT: Georgia Power Company FACILITY:

Vogtle, Units 1 and 2

SUBJECT:

SUMMARY

OF MEETINGS ON EMERGENCY PLANNING HELD OCTOBER 16 AND 17, 1985 On October 16 and 17, 1985, the staff met in Bethesda with the applicant and its representatives to discuss the Vogtle Emergency Plan and the emergency action levels (EAls). Participants for both meetings are listed in the enclosure.

The applicant stated at the outset of the meeting that it considers emergency planning to be the critical path item toward licensing of Vogtle Unit 1.

The applicant further indicated that this necessitates maintaining May 1, 1986, as the emergency preparedness exercise date. The applicant stated that a preassesscent meeting is scheduled for the week of November 18, 1985 in Region II. The full assessment is scheduled for 2 weeks beginning January 27, 1986.

October 16 was spent discussing the applicant's proposed responses to each coment in the staff's draft evaluation transmitted to the applicant by letter dated July 29, 1985. The staff provided feedback to the applicant as to the acceptability or shortcomings of each response.

In discussing the emergency response brochure, the applicant stated that a copy would be provided to the staff for review by October 18, 1985, along with sample advertisements and posters. The applicant requested that these materials be approved by both the staff and the Federal Emergency Management Agency (FEMA) by January 1986 to allow concurrent brochure and weather radio distribution.

On October 16, the staff and applicant also briefly discussed the emergency planning contentions admitted for litigation.

The applicant comitted to providing the staff with responses to approximately 90% of its coments by November 15, 1985, with the remainder following as soon as possible.

On October 17, the staff and applicant discussed the Vogtle emergency action levels with the staff's consultant. The applicant also studied the Shearon Harris scheme which the staff has found acceptable. The staff consultant pointed out that enough information and clarification is not included for the l

l 8511070159 851029 DR ADOCK O 4

l

~

, reviewer to come to the same determination as the applicant on a number of classifications. The applicant indicated that it planned to respond to staff comments on the EALs by December 1, 1985.

/5/

Melanie A. Miller, Project Manager i-Licensing Branch No. 4 Division of Licensing I

Enclosure:

As stated cc: See next page i

i s

i a

T i

i i

j j

1 i

i

  • b D
  1. 4 I_ r/hmc EAde am 10/JV85 10

/85 4

Oc tober 28, 1985 MEETING

SUMMARY

DISTRIBUTION

, Docket:Filem50-424/425.~

NRC PDR Local PDR PRC System NSIC LB #4 r/f Attorney, OELD EAdensam Project Manager M. Milige MDuncan NRC PARTICIPANTS M. Miller R. VanNiel E. Williams

8. Bordenick bec: Applicant & Service List

?

Mr. Donald Foster Georgia Power Company Vogtle Electric Generating Plant CC:

Mr. L. T. Gucwa Resident inspector Chief Nuclear Engineer Nuclear Regulatory Conraisi Dm Georgia Power Company P. 0. Box 572 P.O. Box 4545 Waynesboro, Georgia 3t U9 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Deppish Kirkland. Ilf, 'Jr u o se l Vice President - L.<.ensing Office of the Consumers' Hiilin Vogtle Project Council Georgia Powe.' Company /

Suite 225 Southern Company Services, Inc.

32 Peachtrea Street, N.W P.O. Box 2625 Atlanta, Georgia 20303 Birmingham, Alabama 35202 l

James E. Jciner Mr. R. E. Conway Troutman, Sanders, t,:kerman, t

Senior Vice President - Nuclear

& Ashmore Power Candler Building t

Georgia Power Company 127 Peachtree Street, N.E.

P.O. Box 4545 Atlanta, Georgia 30303 Atlanta, Georgia 30302 Douglas C. Teper Mr. J. A. Bailey Georgiar.s Against "uclear Energy Project Licensing Manager 1253 Leros Circle Southern Company Services, Inc.

Atlanta, Gaorgia 303n6 P.O. Box 2625 Birmingham, Alabama 35702 Laurie Fowler, Esq.

218 Flora Avenue, N.4 Ernest L. Blake, Jr.

Atlanta, Gecrgia 30ad' Bruce W. Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge Tim Johns r.

1800 M Street, N.W.

Execu tiu i rector I

Washington, D. C.

20036 Edt.cational L ir9aign f or a Prosperous Georgia Mr. G. Bockhold, Jr.

1093 Austin Avenue, N.E.

Vogtle Plant Manager Atlanta, Georgia 30107 Georofa Power Company Route 2, Box 299-A 6tilie Pirner Girde Waynesboro, Georgia 30830 Citizens Clir.ic. tretter Government Accoun'abilit/ Prolect Regional Administrator, Region !!

303 'Oth Street U.S. Nuclear Regulattry Commission Aucusta, Georgia 10001 101 Marietta Street, N.W.,

Suite 2900 Atlanta, Georgia 30323 i

l l

l e

-,,----e..

-p,-

- + -.

+ -

-,----r

.s--c

. ~. _ _

T I

i Enclos'.re 1

1 i

Participants

'1 6

h NRC Southern Comaanv Services MNiller*

RTheras RVanfliel JRailey EWilliamt*

B30rdenick**

Troutman, Sanders Georoia Power C(mpany HDavenport 0Altman J0iluzio SEwald Cemex ADesrosiers e

VPofnter 03cnultz*

i Ebasco Stone and Webster MFarr RSmith i

f i

  • Attended both October 16 and l' meetings.
    • Attended only a portion of the October 16 neeting.

'** Participated in October 17 teiecon only.

b I

I L

4