EDISON DRIVE l

MAIRE HARHEE ATOMICPOWERComPARUe nuousrx. us,ne o<sas g,

(207) 623-3521 e

October 28, 1985 MN-85-166 GDW-85-243 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Mr. Edward J. Butcher, Jr.

Acting Branch Chief Operating Reactors Branch No. 3 Division of Licensing

References:

(a) License No. OPR-36 (Docket No. 50-309)

(b) WAPCo Letter to USNRC dated January 25, 1985 (MN-85-14) -

Additional Information Regarding Generic Letter 83-28 (c) WAPCo Letter to USNRC dated June 7,1985 (MN-85-110 -

Generic Letter 83-28, Item 4.5.2 and 4.5.3 (d) NRC Letter to MYAPCo dated August 7,1985 - Reactor Trip System Reliability - Items 4.2.1 and 4.2.2 of Generic Letter 83-28

Subject:

Reactor Trip Breaker Testing and Maintenance Gentlemen:

In Reference (d), the NRC Staff transmitted to Maine Yankee a Safety Evaluation of our Testing and Maintenance Program for our Reactor Trip Breakers. In that letter, you noted that the NRC guidance recommends testing and maintenance at six-month intervals and that presently Maine Yankee is engaged in a quarterly testing maintenance program.

In both References (b) and (c), Maine Yankee indicated that we would reevaluate the frequency of our testing and maintenance on the reactor trip breakers based upon our experience during the Cycle 8 operation. The trip breakers have performed well, as expected, and we have altered our testing and maintenance program commencing with the Cycle 9 startup as follows:

We will continue to perform preventive maintenance and time testing as previously outlined on all reactor trip breakers prior to startup from a refueling outage.

We will conduct undervoltage device time testing on a semi-annual basis during Cycle 9 and following, prior to any preventive maintenance or intentional cycling of the trip breakers.

We will conduct preventive maintenance on a semi-annual basis as 05g conditioned in the item above.

8511040183 851028 6412L-FWS PDR ADOCK 0500 9

MAINE YANKEE ATOMIC POWER COMPANY t

Uriited States Nuclear Regulatory Commission Page Two Attention: Dr. Thomas E. Murely, Regional Adninistrator 7N-85-166 We believe that this modification of our Maintenance and Testing Program is consistent with the NRC Staff guidance, good engineering, and prudent management. As the data base develops for refurbished breakers lubricated

-with Mobil 28, it may be appropriate to once again evaluate the preventive maintenance interval at the end of the upcoming fuel cycle.

If you have additional questions of this matter, please feel free to

-contact us.

Very truly yours, PMINE YANKEE ATOMIC POWER C0f4'ANY J W.

fw G. D. Whittier, Manager Nuclear Engineering & Licensing GDW/bjp cc: Dr. Thomas E. Murley Mr. Cornelius F. Holden Mr. C. D. Frizzle