ML20133Q312
| ML20133Q312 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/29/1985 |
| From: | Bachmann R NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
| To: | Bloch P, Grossman H, Mccollom K Atomic Safety and Licensing Board Panel |
| References | |
| CON-#485-999 OL-2, NUDOCS 8511010487 | |
| Download: ML20133Q312 (2) | |
Text
8 u,
N L
/
'o UNITED STATES
[O\\
'\\
g
[
g NUCLEAR REGULATORY COMMISSION 5
E WASHINGTON, D. C. 20555 pf 8
\\
/
4'0p
~
- sfql, t.
r D
October 29, 1985 j
'% pt*
Peter B. Bloch, Esq., Chairman Dr. Kenneth A. McCollom Administrative Judge Administrative Judge Atomic Safety and Licensing Board Dean, Division of Engineering, U.S. Nuclear Regulatory Comission Architecture and Technology Washington, DC 20555 Oklahoma State University Stillwater, OK 74078 Herbert Grossman, Alternate Chairman Elizabeth B. Johnson Administrative Judge Administrative Judge Atomic Safety and Licensing Beard Oak Ridge National Laboratory U.S. Nuclear Regulatory Comission P.O. Box X, Building 3500 Washington, DC 20555 Oak Ridge, TN 37830 Dr. Walter H. Jordan Administrative Judge 881 W. Outer Drive Oak Ridge, TN 37830 In the Matter of Texas Utilities Electric Company, et al.
(Corranche Peak Steam Electric Station, UiiTtT1 and 2)
Docket Nos. 50-445 and 50-446 and 50-445/2 and 50-446/2
Dear Administrative Judges:
It has come to my attention that some words were inadvertently omitted t
from a quote contained in the "NRC Staff's Response to Licensing Board Questions Raised During October 15, 1985 Conference Call", filed on October 25, 1985. The quote in question is found on page 8.
The correct reading of the first full senten n on that page should be (omitted words underlined):
It would remain a separate segment of the case even if there was not a separate Licensing Board, but the fact that a separate Board could be i
appointed with no practical difficulties of over-lapping subject matter still existing between f
l 8511010487 851029 PDR ADOCK 05000445 G
-,-,+--,w me--,
,,nw~n..--
eer-.,--<-,n,--,,g,,.,,,,-w--,-
--,,mwn-r-,.,,~,
.me-------,~
~w-,r,ve,,nnen~.m,.
s ;
two Boards demonstrates the lack of connection of the Phase II issues to any non-emergency planning issues.
I apologize for any inconvenience this may have caused.
Sincerely, Richard G. Bachmann Counsel for NRC Staff cc: Service List I