Forwards Revised Review Schedule for Plant Readiness Review Module 3A, Initial Test Program (Preoperational Phase) & Advises of 30-day Extension of Key Interim & Final Reporting Milestones.Comments Requested by C.O.B. 850814
ML20133Q220
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/09/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Gibson A, Grimes B, Thompson H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), Office of Nuclear Reactor Regulation
References
NUDOCS 8511010441
Download: ML20133Q220 (4)


Text

.

0%;rl ~ '

"] (

^

AUG 091985

? -

MEMORANDUM FOR: Hugh L. Thompson, Jr., Director, Division of Licensing, NRR Brian K. Grimes, Director, Division of Quality Assurance, Vendor, and Technical Training Center Programs, IE Albert F. Gibson, Acting Director, Division of Reactor Safety FROM: Roger D. Walker, Director, Division of Reactor Projects .

SUBJECT:

REVISED REVIEW SCHEDULE FOR V0GTLE. READINESS REVIEW MODULE NO. 3A - INITIAL TEST, PROGRAM (PREOFERATIONAL TEST PHASE) s ,-

Subsequent to the Georgia Power Company.(GPC) presentation of the subject module. <

on May 14,1985, Region II technical staff determined upon initial review that <

certain discrepancies existed primarily in Sections 3.4 and 3.5. Based on ,

statements of the licensee the discrepancies were attributed to data processing errors experienced during the reproduction process and were unknown to GPC Readiness Review management at the time of the module presentation.

Our review of the revised pages submitted indicates some additional review will be required althouSh little impact to ongoing review work is anticipated.

Furthermore, the revised submittal apparently does 'not affect the basic module tenclusions. In view of the additional review required however, an extension to the existing schedule is granted. Key interim and final reporting milestones will be extended for approximately 30 days as indicated on Enclosure No. 1, Vogtle Readiness Review Program Review Schedule (Revision 1).

Comments on tne dates identified in these enclosures should be directed to the Vogtle Project Section by COB August 14, 1985.

0 kWI 0 W e lN&

E Roger D. Walker

Enclosure:

Vogtle Readiness Review Program Review Schedule (Revision 1)

'bec w/ enc 1: (See page 2) -

s .

CONTACTS:

M. V. Sinkule

'{2,b 1,

FTS: 242-5506 .

W. H. Rankin FTS: 242-4197 '

0511010441 a50009 PDR ADOCK 05000424 g A PDR I ZEul L, m -

w

f u-Multiple Addressee 2 AUG 091985

?

bec w/ enc 1:

.W. M. Hill,.IE

-T. S. Michaels, NRR M. 'A. Miller, NRR -

E. G. Adensam~ NRR ,

J. - L. Milhoan,- IE-I' O. H. Beckham.-NRR

(' -lW. T. Russell, NRR

D. L. Ziemann, NRR-J. .. A. - Kudrick, NRR j

F' C. Cherny, NRR j

, R.'A.-Becker, NRR W. E. Brach, DEDROGR- j 1

J. .

N.' Grace, RII J i

J..A. Olshinski, RII E A. R. Herdt, RII F. Jape, RII G. A. Schnebli, RII W.' H. Rankin, RII-

-M. V.'Sinkule, RII

.NRC Resident Inspector Document Control Desk State of Georgia.

2 L-

- RIIn -

MX .RIIh $ RII p

WHRankin:jw' MSinkule VLBrownlee 8/8/85. 8/g/85/ S/q/85

7 V

,. AUG 091985 ENCLOSURE MODULE 3A INITIAL PROGRAM (PRE 0PERATIONAL PHASE)

V0GTLE READINESS REVIEW PROGRAM Review Schedule (Revision 1)

ORIGINAL DATE ,,. REVISED DATE TASK COMPLETION 14 MAY 85 -Receipt of Module from Licensee 14'MAY 85 -Meeting of principal reviewers (RII, NRR, IE)

-Identification of technical reviews needed (Office / Division / Branch)

-Identification of review schedule completion dates 21 MAY 85 -Issue confirmation letter of review schedules and assignments

' 17 JUNE 85 -Initial NRR technical review of module complete / Questions for resolution identification in conference with GPC*

17 JUNE 85 -Initial IE technical review complete / Discrepancies for resolution identified to GPC" 1 JULY 85 -Initial RII technical review complete /on-site review activities complete / initial technical review of implementation matrix and program verifications complete / discrepancies for resolution identified to GPC*

23' AUGUST*85 -Interim technical review status report (brief written report) from technical review Branches to Vogtle Project Section. Identify progress made, extent of discrepancies determined, adherence to review schedules.

16 SEPTEMBER 85 -Draft readiness review reports, prepared by all cognizant technical review Branches for their respective areas of primary review responsibility, are provided to the Vogtle Project Section.

P AUG 0919v5 0 tnc losure 2 30 AUGUST S5 30 SEPTEMBER 85 -Draft NRC Letter of Accectance, with Summary Report of Findings, prepared by RII Lead Technical Review Section and Vogtle Project Section.

11 SEPTEMBER S5 18 OCTOBER 85 -NRC Letter of Acceptance, with concurrences, issued to GPC 11 OCTOBER 85 18 NOVEMBER S5 -GPC response to discrepancies evaluated with participation of cognizant technical reviewers as necessary. Unrescived discrepancies will be transferred for followup to the Vogtle Readiness Review Program Outstanding Items List.

  • All discrepancies or findings which are identified during technical review as being potential items of noncompliance should be referred to Region II for a final determination of noncompliance.