ML20133P944
| ML20133P944 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/15/1997 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| 97-10, NUDOCS 9701270160 | |
| Download: ML20133P944 (3) | |
Text
_
T i
i U.S. NUCLEAR REGULATORY COMMISSION No. 97-10 SPECIAL PROJECTS OFFICE OFFICE OF NUCLEAR REACTOR REGULATION i
NOTICE OF SIGNIFICANT MEETING January 15, 1997 l
Licensee:
Northeast Utilities (NU) j Facility:
Millstone Units 1,2 and 3 l
Docket No.:
50-245, 50-336, 50-423 1
i j-Time and Date:
7:00 p.m., Wednesday February 5,1997 1
i Location:
Wateiford Town Hall 15 Rope Ferry Road j
Waterford, CT
Purpose:
Obtain comments from the public regarding NU's contractor j
selections for the Independent Corrective Action Verification Program (ICAVP) and the Employee Concerns Program. Results will be presented from an independent assessment of the likelihood and consequences of loss of spent fuel pool cooling, j
f NRC Attendees:
A. Cerne, Senior Resident inspector, Special Projects Office (SPO), Nuclear Reactor Regulation (NRR)
J. Durr, Chief, inspections, SPO, NRR a
T. Easlick, Senior Resident inspector, SPO f
G. Imbro, Deputy Director of ICAVP Oversight, SPO, NRR W. Lanning, Deputy Director of Inspections, SPO, NRR
]
P. McKee, Deputy Director of Licensing, SPO, NRR L. Plisco, Chief, VCAVP Oversight, SPO, NRR W. Travers, Director, SPO, NRR D. Beaulieu, Senior Resident inspector, SPO J. Ibarra, Senior F.ngineer, AEOD H. Ornstein, Senior Engineer, AEOD NOTE: This meeting is open for public participation. Attendance by additional NRC personnel or handicapped persons requiring assistance should be made known by February.
3,1996, via telephone call to Jacque Durr, Region I, at (610) 337-5224. Copies of NU correspondence to the NRC regarding these issues have been placed in the Waterford j
Library.
]
270010 p
ORIGINAL SIGNED BY:
D Prepared by:
gh I
Jacque Durr, Chief Inspections, SPO, NRR 9701270160 970115 PDR ADOCK 05000245 P
Distribution:
B. D. Kenyon, President and Chief Executive Officer T. Feigenbaum, Executive Vice President and Chief Nuclear Officer - Northeast Utilities Service Company V. Juliano, Waterford Library J. Buckingham, Dept. of Public Utility Control S. Comley, We the People Representative Terry Concannon Citizens Awareness Network PUBLIC -
State of Connecticut Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI i
Region i Receptionist l
i
)
I L
j
' - - = -
e y
- ew a
a Distribution (Via E-Mail):
L. J. Callan, Executive Director for Operations F. Miraglia, Director, Office of Nuclear Reactor Regulation, NRR H. Thompson, Deputy Executive Director for Regulatory Programs 4
S. Reynolds, Technical Assistant, SPO, NRR G. Imbro, Deputy Director of ICVAP Oversight, SPO, NRR D. B. Matthews, Acting Deputy Director, Division of Reactor Program Management, NRR R. Spessard, Deputy Director, Division of Reactor Controls and Human Factors, NRR J. Lieberman, Director, Office of Enforcement A. Thadani, Associate Director for Technical Review, NRR l
R. Zimmerman, Associate Director for Projects, NRR S. Varga, Director, Division of Reactor Projects - t/11, NRR W. Dean, Regional Coordinator, OEDO N. Green, Jr., ORA, RES D. Screnci, Public Affairs Officer, RI i
N. Sheehan, Field Public Affairs Officer, RI i
C. Gordon, State Agreements Program Officer, ORA D. Chawaga, Regional State Liaison Officer, ORA M. Campion, Secretary, ORA Millstone, Senior Resident inspectors, Units 1,2, and 3 P. McKee, Director, Deputy Director of Licensing, SPO, NRR J. Anderson, PM, SPO, NRR V. Rooney, PM, SPO, NRR D. Mcdonald, SPM, SPO, NRR Q:\\ BRANCH 6\\ NOTICES \\020597PM.Mll To,eceive a copy of this document, indicate in the box: "C' = Copy without attach,nent/ enclosure "E" = Copy with attachment / enclosure "N" = No copy 0FFICE RI/DRP a lt)
Rl/DRP l
l l
NAME RUrban M
JDurr M DATE 01/13 /97 V
01/ g797
/
-