ML20133P472

From kanterella
Jump to navigation Jump to search
Informs That Staff from Various NRR Ofc Will Be Holding Steam Generator Workshop Scheduled for 970225 at Anl in Argonne,Il
ML20133P472
Person / Time
Issue date: 01/22/1997
From: Lainas G
NRC (Affiliation Not Assigned)
To: Welty C
ELECTRIC POWER RESEARCH INSTITUTE
References
NUDOCS 9701240265
Download: ML20133P472 (2)


Text

_

January 22, 1997 i

Chuck Welty l

Manager, Steam Generator Program Electric Power Research Institute 3412 Hillview Avenue.

Post Office Box 10412 Palo Alto,' CA 94303

Dear Mr. Welty:

As you are aware, we will be holding a steam generator workshop attended by staff from various NRR offices. This workshop is scheduled for February 25 -

27, 1997 at Argonne National Laboratories (ANL) in Argonne, Illinois.

Based on discussions with Ted Sullivan, I understand that you, and several colleagues, have agreed to participate in the workshop and present information on industry initiatives and various EPRI Guidelines.

I have been informed l

that the topics you plan to discuss are as described in the enclosure to this letter.

Your presentation has been scheduled for February 27 from 12:15 -

l 3:15 p.m..

The NRC Research Office is scheduled for presentations and ANL laboratory tours the morning of February 27 (8:00 - 11:00 a.m.).

They will present information on research activities related to steam generator degradation and the new steam generator rulemaking.

I would like to reiterate the invitation for you and your colleagues to attend this morning session.

I appreciate your participation in the steam generator workshop.

I think it will be beneficial to all participants.to gain information on industry activities directly from the industry.

If you have any questions, please contact Ted Sullivan [(301) 415-3266].

)

i Sincerely, l

Oll!G1Md. SIGNED BY Gus C. Lainas, Acting Director Division of Engineering

_ n l

31) 2 f)I '

I

Enclosure:

As stated cc: B. Sheron 1

j Distributios l

l

.Ientral Files Public CBeardslee i

EMCB R/F ESu11ivan

'N DOCUMENT NAME:

G:\\BEARDSLE\\EPRI TV.WRK To receive a copy' of this document, indicateln the box C= Copy w/o attachment / enclosure E= Copy with l

attachment /enclospre,W=No copy-S, Elick:4Y-DE:AN DE:AD o m Cr i N man JStrodider GidInas D q-Ad uw

/ // 97 l /lf 97

/ / h97 7,Q DATE 0FFICIAL FILE COPY gg l

N 9 d1'240265 9f0122 bb hhhf PDR ORG EXIE pg

1 EPRI PRESENTATION Status of steam generator operations - plots of tubes plugged due to various degradation mechanisms Short overview of EPRI Program supporting the steam generator rule Discussion on the NDE qualification of two techniques for sizing circumferential cracks Discussion of the issue of removing two eddy current technique qualifications from EPRI Appendix H - why it was done and the protocol used Updating of ISI Guidelines Leak Monitoring Guidelines

- What's been learned from utilities using them over the past 2 years

- Forthcoming changes in support of the new steam generator rule Update on the status of sleeving repairs and the Sleeving Assessment Document l

l l

l 4