Motion for Extension of Time Until 850830 to File Response to Applicant 850718 Motion for Summary Disposition of Contention 10.7.Extension Needed to Review Westinghouse Model B Recombiner Testing Data.Certificate of Svc Encl
ML20133P462
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/07/1985
From: Perlis R
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To:
Atomic Safety and Licensing Board Panel
References
CON-#385-224 OL, NUDOCS 8508140330
Download: ML20133P462 (4)


Text

>&

August 7, 1985 I/

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION CCCEETED usnRC BEFORE THE ATOMIC SAFETY AND LICENSING BOAD AUS 13 A10:25 In the Matter of

)

CFFIC OF $E C.M fM '

)

00CKETING A SEFv!

GEORGIA POWER COMPANY

)

Docket Nos. 50-454ANCH et al.

)

50-425

)

(0L)

(Vogtle Electric Generating Plant, )

Units 1 and 2)

)

NRC STAF.F REQUEST FOR EXTENSION OF TIME TO FILE RESPONSE TO APPLICANTS' MOTION FOR

SUMMARY

DISPOSITION OF CONTENTION 10.7 On July 18, 1985, Applicants filed a Motion for Summary Disposition of Joint Intervenors' Contention 10.7.

That contention challenges the adequacy of the environmental qualification of the hydrogen recombiners used at tSe Vogtle facility.

In their Motion, Applicants indicate that they will be using Westinghouse Model B recombiners at Vogtle. Applicants' conclusions on the adequacy of the qualification of the Model B recombiners are based upon testing of both the Model B and (similar) Model A Westinghouse recombiners.

The NRC Staff has previously reviewed the Westinghouse testing program for the Model A recombiners. The Staff has only recently received the testing data for the Model B recombiners and has not yet had a chance to fully review this material.

8508140330 e50B07 DR ADOCK 050 4

b30

In order to respond adequately to Applicants' Motion, the Staff needs to complete its review of the Model B testing data and compare that inforniation with the results of the Model A testing program. The Staff anticipates that this review can be finished in a matter of weeks, but it can not be completed before the Staff's response to Applicants' Motion is due (August 12,1985). The Staff therefore requests that its time within which to respond to Applicants' Motion be extended until August 30, 1985.

Staff counsel has discussed this requested extension with representatives of both Joint Intervenors and Applicants; neither party ob,jects to grant of the request.

~

For the reasons presented above, the Staff respectfully requests that its request for an extension of time until August 30, 1985 to respond to Applicants' Motion for Summary Disposition of Contention 10.7 be granted.

Respectfully submitted,

/

Robert G. Perlis Counsel for NRC Staff Dated at Bethesda, Maryland this1th day of August,1985

Y UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 00thETEf:

USNRC BEFORE THE ATOMIC SAFETY AND LICENSING BOARD 85 AUG 13 A10:27 In the Matter of

)

0FFICE OF SECRLi A:

)

00CKETING 4 SEFv;ry.

GEORGIA POWER COMPANY,

)

Docket Nos. 50-424 BRANCH

--et al.

)

50-425

)

(0L)

(Vogtle Electric Generating Plant, )

Units 1 and 2)

)

. CERTIFICATE OF SERVICE I hereby certify that copies c' "NRC STAFF REQUEST FOR EXTENSION OF TIME TO FILE RESPONSE TO APPLICANTS' MOTION FOR

SUMMARY

DISPOSITION OF CONTENTION 10.7" in the above-captioned proceeding have been served on the following by deposit in the United Sti.tes mail, first class or, as indicated by on asterisk, through deposit in the Nuclear Regulatory Commission's internal mail system, this 7th day of August,1985.

Morton B. Margulies, Esq., Chairman

  • Mr. Gustave A. Linenberger, Jr.*

Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board Panel Panel U.S. Nuclear Regulatory Comission U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Washington, D.C.

20555 Dr. Oscar H. Paris

Administrative Judge Region 1 Counsel Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Panel Suite 3100 U.S. Nuclear Regulatory Commission 101 Marietta Street Washington, D.C.

20555 Atlanta, GA 30303 Bruce W. Churchill, Esq.

Douglas C. Teper David R. Lewis, Esq.

1253 Lenox Circle Shaw, Pittman, Potts & Trowbridge Atlanta, GA 30306 1800 M Street, N.W.

Washington, D.C.

20036

l Atomic Safety and Licensing Laurie Fowler, Esq.

Board Panel

  • 218 Flora Ave. NE U.S. Nuclear Regulatory Commission Atlanta, GA 30307 Washington, D.C.

20555 Docketing and Service Section*

Atomic Safety and Licensing Office of the Secretary Appeal Board Panel

  • U.S. Nuclear Regulartory Commission U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Washington, D.C.

20555 James E. Joiner, Esq.

Ruble A. Thomas Troutman, Sanders, Lockerman, Southern Company Services, Inc.

& Ashmore P.O. Box 2625 127 Peachtree Street, N.E.

Birmingham, AL 35202 Candler Building, Suite 1400 Atlanta, GA 30043 Tim Johnson Executive Director Campaign for a Prosperous Georgia 175 Trinity Avenue, S.W.

Atlanta, GA 30303

.e t,

Robert G. Perlis Counsel for NRC Staff

,