Text
<
b O(C Commonwe:lth Edison Drssden Nuclur Power Ststion "ge R.R. #1 Morris, lilinois 60450 Telephone 815/942-2920 PRIagy77 ECUTING
- ~
tjW ie ~.,
October 18, 1985 mr r
WQ'il n,
DJS LTR:
85-987 fit Q Mr. James G. Keppler Regional Administrator f O Directorate of Regulatory Operations Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Keppler:
As part of the Unit 3 preoutage work, a Secondary Cont.ainment Leak Rate Test (SCLRT) was performed on the Unit 2/3 Reactor Building.
According to Section 4.7.C.1.c of the Dresden 2/3 Technical Specifi-cations, the secondary containment must be capable of maintaining.25 inch of water vacuum with the Reactor Building ventilation system isolated and one Standby Gas Treatment train in operation.
On October 3, 1985, the test was performed in accordance with statien procedures. The result was.255 inch of water negative pressure in the secondary containment with respect to the atmosphere, which meets j
the Technical Specification Requirement. This report is submitted in I
accordance with the requirements of Section 6.6.C.3 and Table 6.6.1 item j of the Unit 3 Technical Specifications.
i l
Sincerely, I
h' D
D. J. Scott Station Manager Dresden Nuclear Power Station l
DJS:BM:hjb cc:
R. Flessner J. Wojnarowski J. Kotowski T. Ciesla J. Achterberg J. Brunner R. Stachniak B. McCabe File /NRC File / Numerical gO310133 851018 9h N i
p ADOCK 05000249
()U g e