ML20133P027
| ML20133P027 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 01/17/1997 |
| From: | Dyer J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gambhir S OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20133P031 | List: |
| References | |
| NUDOCS 9701240062 | |
| Download: ML20133P027 (4) | |
See also: IR 05000285/1996016
Text
- -
-. . - .
- - . --.
_ . . - - -
._
.
.
- . .
, _ _ _ _
e
[f "' %,,S
UNIT E D ST ATES
NUCLEAR REGULATORY COMMISSION
-
h
-
- $
REGION IV
- 't
't
S%
'
611 RY AN PL AZA DRIVE. Suf7E 400
h
%
.P
AR LINGTON. T E X AS 76011 8064
9 **..*
JAN I T 1997
S. K. Gambhir, Division Manager
Production Engineering
Omaha Public Power District
. Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399, Hwy. 75 - North of Fort Calhoun
Fort Calhoun, Nebraska 68023-0399
SUBJECT: NRC INSPECTION REPORT 50-285/96-16
Dear Mr. Gambhir:
An NRC inspection was conducted November 17 through December 28,1996, at your Fort
Calhoun Station reactor facility. The enclosed report presents the scope and results of that
,
inspection.
i
During the 6-week period covered by this inspection period, your conduct of activities at
i
the Fort Calhoun Station was generally characterized by safety-conscious operations,
sound engineering and maintenance practices, and careful radiological work controls.
However, regionalinspectors did identify an unresolved item regarding Section lll 0 of
Appendix R to 10 CFR Part 50, specifically, the adequacy of your reactor coolant pump
lubrication oil collection system. Section 02.1 of the enclosed report details the NRC's
observations in this area and includes questions which need to be ar6wered in order to
resolve this matter. Please provide a response to the three questions posed in
..,
,
Attachment 2 of the enclosed report within 30 days of the issue date of the report.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosure, and your response will be placed in the NRC Public Document Room. To the
j
extent possible, your response should not include any personal privacy, proprietary, or
'
safeguards information so that it can be placed in the Public Document Room without
redaction.
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
i
Sincerely,
u
1e J. E.
yer, Director
) Division of Reactor Projects
Docket No.: 50-285
License Nc,.: DPR-40
9701240062 970117
ADOCK 05000285
G
pop
-_
--
.
.
-
.
_ _ . .
.
'
,
i
1
'
Omaha Public Power District
-2-
4
.
i
Enclosure:
NRC Inspection Report
i
50-285/96-16
cc w/ enclosure:
James W. Tills, Manager
J
Nuclear Licensing
Omaha Public Power District
i
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399
'
4
Hwy. 75 - North of Fort Calhoun
]
Fort Calhoun, Nebraska 68023-0399
i
James W. Chase, Manager
'
4
Fort Calhoun Station
P.O. Box 399
,
Fort Calhoun, Nebraska 68023
Perry D. Robinson, Esq.
Winston & Strawn
1400 L. Street, N.W.
Washington, D.C. 20005-3502
]
Chairman
Washington County Board of Supervisors
Blair, Nebraska 68008
]
Cheryl Rogers, LLRW Program Manager
Environmental Protection Section
.
Nebraska Department of Health
301 Centennial Mall, South
P.O. Box 95007
I
Lincoln, Nebraska 68509-5007
1
Y
a
.
.
JAN I 7 I997
Omaha Public Power District
-3-
E-Mail report to Tom Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Ronald Frahm, Jr, (RKF)
E-Mail report to Richard Correia (RPC)
bec to DMB (IE01)
bec distrib. by RIV:
L. J. Callan
DRS-PSB
DRP Director
MIS System
,
Branch Chief (DRP/B)
RIV File
,
Project Engineer (DRP/B)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
Branch Chief (DRP/TSS)
l
Resident Inspector
,
'
DRS Director
{
DRS Deputy Director
'
.
Branch Chief (DRS/EB)
4
,
!
,
DOCUMENT NAME: R:\\_FC\\FC616RP.WCW
To receive copy of document, indicate in box: "C" = Copy without ene sures "E" = Copy with enclosures "N" = No copy
RIV:SRl:DR(/$ ,l
C:DRP/B/ )l
DD:DRS l k
D:DRP [M
l
WCWalker:rg M
WDJohpson
KEBrcjckmanQ l JEDyer"
1 / 10 /9 7 V
1//4 /97
1/ $97
1/ () /97
\\
~
~
OFFICIAL RfCORD COPY
~
\\
240003
l
.
. ~ . . . - . - .
.. .
. . _ - - . .
_ _ . . . . . _ . - . . . . _ .
_
...-.. -_ - . .
.
_.-. .
j
.
JAN I 7 Ibb7
Omaha Public Power District
-3-
E-Mail report to Tom Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Ronald Frahm, Jr. (RKF)
E-Mail report to Richard Correia (RPC)
,
bec to DMB (IE01)
bec distrib. by RIV:
l
L. J. Callan
DRS-PSB
I
DRP Director
MIS System
!
Branch Chief (DRP/B)
RIV File
Project Engineer (DRP/B)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
Branch Chief (DRP/TSS)
Resident Inspector
DRS Director
DRS Deputy Director
Branch Chief (DRS/EB)
l
l
l
l
l
l
l
l
1
l
DOCUMENT NAME: R:\\_FC\\FC616RP.WCW
g
l
To receive copy of document. Indicate in box: "C" = Copy without enc $sures
"E" = Copy with enclosures "N" = No copy
l
RIV:SRl:DRF(/$ ,
C:DRP/B/ /
DD:DRS
1
D:DRP[jy
WCWalker:# ftA
WDJoh jlon
KEBr9ckmarhj j JEDyer*
l
1 / 10 /9 7 V
1//4 /97
1/ $ 97
1/ p /97
$
OFFICIAL RECORD COPY
l
?
I
!
I
'
i
I
,_
._
,