Special Rept Spr 85-008:on 850606,three Discrepancies Discovered During App R Audit,Including Unsealed Seismic Opening in Intermediate Bldg Floor.Cause Unknown.Repair to Be Completed During Next Outage.Part 21 Related
ML20133N778
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/03/1985
From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-85-360-000 PT21-85-360, PT21-85-360-000, SPR-85-008, SPR-85-8, NUDOCS 8508130624
Download: ML20133N778 (2)


Text

- __

I SOUTH CAROLINA ELECTRIC & GAS COMPANY CO Post OFFICE 764 CoLuusiA. South CAnoLINA 29218 hc' l l O. W. Demon. JR. p

( v.Ce pas sio'"'

NuCLEAn OPEmatioNS Ju1y 3, 1985 co Dr.-J. Nelson Grace LO Regional Administrator 00 U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street, NW Atlanta, Georgia 30323 l

L

SUBJECT:

Virgil C. Summer Nuclear Station l Docket No. 50/395 Operating License No. N P F- 12 l Special Report (SPR 85-008) l l

Dear Dr. Grace:

l Attached is a Special Report for the Virgil C. Summer Muclear Station. This Special Report is submitted pursuant to the requirements of Section 6 of the Technical Specifications.

Sh ou ld there be any questions, please call us at your convenience.

l Very tru ly you rs ,

O. W. Di on r.

l l RJB:0WD/ led Attachment ec: V. C. Summer K. E. Nodland T. C. Nichole, Jr./0. W. Dixon, Jr. R. A. Stough E. H. Crews, Jr. G. Pe r c iv a l E. C. Roberts C. W. Hehl l W. A. Williams, Jr. J. B. Knotts, Jr.

l D. A. Nauman S. D. Hogge l Group Managers I&E Washington

0. S. Bradham Document Managemen t i C. A. Price Br anch l S. R. Hunt INPO Records Center

! J. F. Heilman ANI Lib r a r y C. L. Ligon (NSRC) NPCF File 8508130624 850703 PDR ADOCK 05000395 S

PDR ffl]

y i

Dr. J. Nelson Grace SPR 85-008 Page Two July 3, 1985 EVENT DESCRIPTION On June 6, 1985, while performing an Appendix R Audit, three (3) discrepancies were id e n t i f ie d .

1) A seismic opening in the floor of the Intermediate Bu i ld in g (IB) Room 63-01 was found to be unsealed.

+ 2) A conduit passing thr ou gh the floor of IB Room 26-02 had a one inch gap between the floor and the triple wrap of knowool.

3) An error was made in the Fire Watch Log with respect to a room required for the hourly inspections, i.e., IB Room 12-07 was d e s ig na t ed in the logs and inspected hourly in s t e ad of IB Room 12-02 as was required.

ACTION TAKEN

1) Smoke detectors were verified o pe r ab le and a one hou r fire ,

watch patrol was established. Repair of the opening will be completed dur in g the next outage of sufficient duration, because sca f folding required for ac ces s ibilit y to the opening s.11 impact the operability of the adjacent s a f e t y- r e la t ed equipment.

2) Smoke detectors were verified o pe r ab l e , and a one hou r fire watch patrol was established. Repair was completed, and the

. barrier was declared o pe r ab le on June 10, 1985.

3) The Fire Watch Log was immediately corrected. Access to IB Room 12-07 is via IB Room 12-02; therefore, the hourly coverage of the area was in effect accomplished.

l l

I i