Special Rept Spr 85-008:on 850606,three Discrepancies Discovered During App R Audit,Including Unsealed Seismic Opening in Intermediate Bldg Floor.Cause Unknown.Repair to Be Completed During Next Outage.Part 21 Related
ML20133N778
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/03/1985
From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-85-360-000 PT21-85-360, PT21-85-360-000, SPR-85-008, SPR-85-8, NUDOCS 8508130624
Download: ML20133N778 (2)


Text

-

I SOUTH CAROLINA ELECTRIC & GAS COMPANY CO Post OFFICE 764 CoLuusiA. South CAnoLINA 29218 h

l c'

l O. W. Demon. JR.

p

(

v.Ce pas sio'"'

Ju1y 3, 1985 NuCLEAn OPEmatioNS co Dr.-J.

Nelson Grace LO 00 Regional Administrator U.S.

Nuclear Regulatory Commission Suite 2900 101 Marietta Street, NW Atlanta, Georgia 30323 l

L

SUBJECT:

Virgil C.

Summer Nuclear Station l

Docket No. 50/395 Operating License No. N P F-12 l

Special Report (SPR 85-008) l l

Dear Dr. Grace:

l Attached is a Special Report for the Virgil C.

Summer Muclear Station.

This Special Report is submitted pursuant to the requirements of Section 6 of the Technical Specifications.

Sh ou ld there be any questions, please call us at your convenience.

l Very tru ly you rs,

O.

W.

Di on r.

l l

RJB:0WD/ led Attachment ec:

V.

C.

Summer K.

E.

Nodland T.

C.

Nichole, Jr./0.

W.

Dixon, Jr.

R.

A.

Stough E.

H.

Crews, Jr.

G.

Pe r c iv a l E.

C.

Roberts C.

W.

Hehl l

W.

A.

Williams, Jr.

J.

B.

Knotts, Jr.

l D.

A.

Nauman S.

D.

Hogge l

Group Managers I&E Washington 0.

S.

Bradham Document Managemen t i

C.

A.

Price Br anch l

S.

R.

Hunt INPO Records Center J.

F.

Heilman ANI Lib r a r y C.

L.

Ligon (NSRC)

NPCF File 8508130624 850703 PDR ADOCK 05000395 S

PDR ffl]

y i

Dr.

J.

Nelson Grace SPR 85-008 Page Two July 3, 1985 EVENT DESCRIPTION On June 6, 1985, while performing an Appendix R Audit, three (3) discrepancies were id e n t i f ie d.

1)

A seismic opening in the floor of the Intermediate Bu i ld in g (IB) Room 63-01 was found to be unsealed.

+

2)

A conduit passing thr ou gh the floor of IB Room 26-02 had a one inch gap between the floor and the triple wrap of knowool.

3)

An error was made in the Fire Watch Log with respect to a room required for the hourly inspections, i.e.,

IB Room 12-07 was d e s ig na t ed in the logs and inspected hourly in s t e ad of IB Room 12-02 as was required.

ACTION TAKEN 1)

Smoke detectors were verified o pe r ab le and a one hou r fire watch patrol was established.

Repair of the opening will be completed dur in g the next outage of sufficient duration, because sca f folding required for ac ces s ibilit y to the opening s.11 impact the operability of the adjacent s a f e t y-r e la t ed equipment.

2)

Smoke detectors were verified o pe r ab l e, and a one hou r fire watch patrol was established.

Repair was completed, and the barrier was declared o pe r ab le on June 10, 1985.

3)

The Fire Watch Log was immediately corrected.

Access to IB Room 12-07 is via IB Room 12-02; therefore, the hourly coverage of the area was in effect accomplished.